HomeMy WebLinkAboutA-4.03RELEA
Subje
FINISH SYMBOLS
FINISH NOTES
AREA NOT IN CONTRACT
GENERAL
-
qqVA pppMM
ROOM — ROOM NAME
L
THE G.C. MUST NOTIFY THE ARCHITECT WITHIN FIVE WORKING DAYS OF THE
301 ROOM NUMBER
AWARD OF THE GENERAL CONTRACT OF ANY AND ALL MATERIALS AND FINISHES
SPECIFIED ON THE ARCHITECT'S DRAWINGS THAT EITHER ARE DISCONTINUED BY
THE MANUFACTURER OR ARE UNAVAILABLE TO THE G.C. FOR HIS USE IN TIME
XX WALL TREATMENT
FOR HIM TO COMPLETE THE WORK BY THE DATE AGREED UPON BY THE
XX — BASE
TENANT AND GENERAL CONTRACTOR.
XX — FLOOR TREATMENT
2.
UNLESS OTHERWISE NOTED, ALL AREAS TO RECEIVE TYPICAL FINISHES: PI, B1
AND Cl. ALL EXISTING DOOR FRAMES TO BE PAINTED 'P2' AND ALL EXISTING
XX ACCENT WALL TREATMENT
PAINT GRAD DOORS TO REMAIN TO BE PAINTED 2P2'. ALL NEW DOORS TO BE
STAIN GRADE 'STI'.
J CORNER GUARDS
3.
REFER TO THE ELEVATION AND DETAIL DRAWINGS FOR ADDITIONAL INFORMATION
CG
RELATED TO THE APPLICATION AND EXTENTS OF FINISHES.
T TRANSITION DETAIL NUMBER
t/n-'�.ox— SHEET NUMBER
4.
REFER SHEET A-5.00 FOR FINISHES OF ALL DOORS, ALL DOOR FRAMES AND ALL
SIDELIGHTS.
------ EXTENT OF CHAIR RAIL,
5.
ALL EXTERIOR WINDOWS SHOULD HAVE BUILDING STANDARD MINI -BLINDS. G.C.
REFER TO NOTE 120.
TO ENSURE THAT EVERY SET OF MINI -BLINDS IS CLEAN AND REPAIRED, AS
REQUIRED, FOR A LIKE -NEW APPEARANCE.
6.
CORNER GUARDS TO BE ACROVYN INTERIORS AS MANUFACTURED BY
CONSTRUCTION SPECIALITIES, INC. MODEL ISSM-20 OR APPROVED EQUAL.
CORNER GUARDS WILL BE MANUFACTURED FROM .078' THICK NOMINAL HIGH
IMPACT VINYL/ ACRYLIC. EXTRUSIONS WILL INCLUDE A MATTE FINISH SHADOW
GRAIN SURFACE IN COLOR SPECIFIED ON FINISH SCHEDULE. VINYL/ACRYLIC GUARD
WILL BE SECURELY SNAPPED IN PLACE OVER THE RETAINER, YET PROVIDE
SHOCK ABSORBING MOVEMENT UNDER IMPACT. CORNER GUARDS WILL BE
STRAIGHT AND TRUE OVER LENGTH. LENGTH OF CORNER GUARDS WILL BE 48'.
MOUNTED ABOVE THE SPECIFIED BASE.
FLOORING:
7.
ALL CARPET, ADHESIVE AND LUXURY VINYL TILE BY MOHAWK WITHIN LIBERTY
MUTUAL'S SUITE TO BE PURCHASED BY LIBERTY MUTUAL AND SUPPLIED TO THE
CONTRACTOR IN THE FIELD. CONTRACTOR IS TO COORDINATE SHIPMENT OF
CARPET, VERIFY QUANTITIES, AND REQUEST THE CARPET SEAMING DIAGRAM WITH
LIBERTY MUTUALS FLOORING SUPPLIER: RYAN BURKE AT ALLEGHENY CONTRACT
FLOORING: (781)497-2810.
S.
UNLESS OTHERWISE NOTED, CLOSETS TO RECEIVE SAME FLOOR COVERING AS
ADJACENT AREA.
9.
UNLESS OTHERWISE NOTED, STRAIGHT BASE WILL BE INSTALLED AT ALL
CARPETED AREAS AND COVE BASE WILL BE INSTALLED AT ALL HARD SURFACE
FLOORING AREAS.
10,
O.C. TO ADHERE THE CARPET DIRECTLY TO THE SUB -FLOOR USING ADHESIVES
IN ACCORDANCE WITH THE CARPET MANUFACTURER'S INSTALLATION
SPECIFICATIONS.
11.
INTERLOCKING PVC TILE TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS.
ORDER AT WWW.FLEXITILES.COM/COINPATTERN.HTM OR CALL 866-556-6324.
ALLOW 4-6 WEEK LEAD TIME.
12.
G.C. TO FLASH PATCH, SCRAPE AND GRIND THE EXISTING SLAB, AS REQUIRED,
TO PROVIDE A SMOOTH SURFACE, FREE OF OLD ADHESIVE, HOLES, BUMPS OR
CRACKS PRIOR TO THE APPLICATION OF ANY FLOOR FINISHES, AND AS REQUIRED
FOR THE PROPER INSTALLATION OF THESE FINISHES. ALL EXISTING ADHESIVE
MUST REMOVED. G.C. TO APPLY SEALANT (OPTISEAL OR APPROVED EQUAL) AS
REQUIRED BY THE MANUFACTURER TO ENSURE NEW FLOORCOVERINGS PROPERLY
ADHERE TO THE SUBSTRATE.
13.
IT IS THE G.C.'S RESPONSIBILITY TO INSPECT THE EXISTING FLOOR SLAB AND
NOTIFY THE ARCHITECT OF ANY CONDITIONS, SUCH AS: CONTROL JOINTS,
EXPANSION JOINTS, CRACKS, UNEVENNESS AND/OR OTHER PREEXISTING FINISHES
THAT CONFLICT WITH THE INSTALLATION AND MAINTENANCE OF THE FLOOR
COVERINGS DESIGNATED ON THE FINISH PLAN(S), AND AS DETAILED, DESCRIBED
AND SPECIFIED IN THESE DRAWINGS. METHODS OF ADDITIONAL PREPARATION,
DETAILING AND/OR ANY JOINTS REQUIRED BY THE SPECIFIED FINISHED FLOOR
MUST BE REVIEWED DURING THE PRICING PHASE OF THE PROJECT, AND INCLUDED
AS PART OF THE G.C.'S PRICING. PRIOR TO THE INSTALLATION, O.C. SHALL
PROVIDE SHOP DRAWINGS FOR REVIEW BY ARCHITECT SHOWING THE LOCATION
OF ANY AND ALL SPECIAL DETAILING AND/OR JOINTS AS REQUIRED FOR THE
SPECIFIED FLOOR FINISH, AND NOT SHOWN ON THESE DRAWINGS. THIS
PROCEDURE IS CAREFULLY CONSIDERED TO AVOID ANY INSTALLATION SURPRISES
OR POST -INSTALLATION PROBLEMS. IF THE G.C. FAILS TO FOLLOW THIS
PROCEDURE, HE DOES SO AT HIS OWN RISK WITHOUT RECOURSE FOR
ADDITIONAL COMPENSATION.
14.
THE GENERAL CONTRACTOR WILL PROVIDE RELATIVE HUMIDITY TESTING OF THE
FLOOR SLAB A MINIMUM OF 4 WEEKS PRIOR TO THE FLOORING INSTALLATION.
THE RH TESTING INVOLVES:
•• DRILLING A CYLINDRICAL HOLE WITH A ROTARY HAMMER -DRILL THEN PLACING
A HOLLOW SLEEVE TO LINE THE HOLE.
•• PERFORM (3) HOLES/ TESTS FOR THE FIRST 1,000 SQUARE FEET, AND AT
LEAST (1) ADDITIONAL HOLE / TEST FOR EACH ADDITIONAL 1,000 SQUARE
FEET.
•• SELECT TEST LOCATIONS TO PROVIDE INFORMATION ABOUT MOISTURE
DISTRIBUTION ACROSS THE ENTIRE FLOOR SLAB, ESPECIALLY AREAS OF
POTENTIAL HIGH MOISTURE. FOR SLABS ON/BELOW GRADE, INCLUDE A TEST
LOCATION WITHIN 3 FEET OF EACH EXTERIOR WALL.
•• USE WAGNER RH PROBES.
•• REFER TO ASTM F2170-11 FOR ADDITIONAL SPECIFICATIONS.
•• CALCIUM CHLORIDE TESTING IS NOT ACCEPTABLE.
•• NOTIFY THE PROJECT ARCHITECT OF THE TESTING RESULTS A MINIMUM OF
4 WEEKS PRIOR TO FLOORING INSTALLATION.
PAINTING
16. PAINTING MAY BE PERFORMED DURING NORMAL BUSINESS HOURS.
17. ALL G.W.B. CEILINGS AND SOFFITS ARE TO BE PAINTED CEILING WHITE.
18. REFER TO THE CONSTRUCTION NOTES FOR BENJAMIN MOORE ORDERING
INSTRUCTIONS THROUGH LIBERTY MUTUAL'S NATIONAL ACCOUNT.
19. BENJAMIN MOORE REGAL SELECT PAINT FINISHES TO APPLIED VIA ROLLER OR
BRUSH. SPRAY APPLICATIONS WILL NOT BE ACCEPTED.
20. G.C. TO PROVIDE PAINT GRADE CHAIR RAIL MOUNTED AT 2'-7' A.F.F. TO
CENTERLINE. CHAIR RAIL TO BE PAINTED P2. REFER TO DETAIL 13/A-7.01.
OPEN
OFFICE
329
PI
BI
CI
OFFICE
328
PI
BI
CI
DIRECTION OF
LVT (TYP)
DIRECTION OF
CARPET TILE
(TYP)
OWN NE
32]
PI
BI
CI
CG
CG CG
IL=-.Y
Co CG
OFFICE
325
PI
BI
CI
Co
OFF CE
331
RAIL TO RETURN ON ITSELF WITH A 45 PI
CUT. TYP. AT DIRTT INSTALLATION. BI
CI
340 a CONRFEOR�NCE
340 00 pp
BF P3 i P4 339 OFPFCE
VT i PI O
� BI PI
CG
OSP%
338
PI
BI
CI
OFFICE
334
CalCI
DIRECTION OF
CARPET TILE
(TYP) pp�N
OFFICE
336
PI
BI
OI
CHAIR RAIL TO RETURN ON ITSELF WITH A 45
DEGREE CUT. TYP. AT DIRTT INSTALLATION,
PI
62
DIRECTION OF CORK• PI
LVT (TYP) 347 BI
CI
CHAIR RAIL TO RETURN ON ITSELF WITH A 45
DEGREE CUT. TYP. AT DIRTT INSTALLATION.
MOTHERS
316
BI
CI
FINISH SCHEDULE x OFFICE OPEN
DIRECTION OF
Code Material Manufacturer Style Number Color Comments 323 CARPET TILE 322
PI (TYP) PI
BI RUBBER BASE ROPPE PINNACLE - 4' STRAIGHT 129 DOLPHIN USED WITH CARPET, U.N.O. ® �� BI
B2 RUBBER BASE ROPPE PINNACLE - 4' COVE 129 DOLPHIN USED WITH HARD SURFACES, U.N.O. Cl
P1 PAINT BENJAMIN MOORE- EGGSHELL OC-13 SOFT CHAMOIS GENERAL WALL PAINT, U.N.O.
REGAL SELECT
P2 PAINT BENJAMIN MOORE- SEMI -GLOSS OC-14 NATURAL CREAM DOOR FRAME, SIDELIGHT FRAME AND TRIM PAINT,
REGAL SELECT U.N.O.
P3 ACCENT PAINT BENJAMIN MOORE- EGGSHELL LT-50 LIBERTY TEAL (50%) ACCENT WALL PAINT, U.N.O.
REGAL SELECT
P4 ACCENT PAINT BENJAMIN MOORE- EGGSHELL LON-50 LIBERTY GREEN 50% ACCENT WALL PAINT, U.N.O.
REGAL SELECT
P5 ACCENT PAINT BENJAMIN MOORE- EGGSHELL LO-100 LIBERTY ORANGE ACCENT WALL PAINT, U.N.O.
REGAL SELECT
P6 ACCENT PAINT BENJAMIN MOORE- EGGSHELL LG-50 CORPORATE GREY ACCENT WALL PAINT, U.N.O.
REGAL SELECT 50%
PLI PLASTIC LAMINATE WILSONART - 5012K-19 MAGNOLIA COUNTERTOP
PL2 PLASTIC LAMINATE WILSONART - 7949K-18 ASIAN NIGHT BASE AND WALL CABINETS
Cl CARPET TILE MOHAWK T.B.D. T.B.D. T.B.D.
WC1 WALLCOVERING DESIGNTEX ORBIT 6748-402 MIST WALLCOVERING TO BE INSTALLED IN HIVE
GTI GLASS TILE DALTILE COLOR WAVE CW34 LEMON POPSICLE HIVE J304 BACKSPLASH. TILE SIZE I'x1' WITH
LATICRETE GROUT, COLOR 144 BRIGHT WHITE.
VTI INTERLOCKING PVC FLEXI TILE FLEXIBLE INTERLOCKING PVC COIN TOP DARK GREY 20.5' x 20.5' INTERLOCKING TILES
UTILITY TILE TILE PATTERN
VT2 FLOATING LVT PLAW MOHAWK HOT R HEAVY - SECOYA C0009 ATWELL MILL 148 RANDOM INSTALLATION
Co CORNER GUARD C.S. GROUP ACROVYN SSM-20 MISSION WHITE REFER TO NOTE /6.
STI WOOD DOOR STAIN CUSTOM - - - MATCH FOURTH FLOOR DOOR STAIN
3ED FOR CONSTRUCTION
1 to compliance with all regulations
of State and Local Codes
City of Camlel
x n
FINISH PLAN
CHAIR RAIL TO RETURN
DEGREE CUT. TYP. I
CO%OEORMNCE
312
PI
BI
CI
SEATING
3148
PI
B2
VT
DIRECTION OF
LVT (TYP)
HIVE
314A
PI
B2
^ VT
ROOM
313
PI
BI
CI
SCALE:
1/8"= 1'-0"
H
E
L
L Y E R
LEWIS-
ARCHITECTURE
INTERIOR DESIGN
Project:
Liberty
Mutual,
INSURANCE
450 East 96th St
3rd Floor
Indianapolis IN 46240
Scale: 1 /8" = 1'-0"
Drawing:
Finish
Plan
No. A-4m03
DATE: 10/23/19