Loading...
HomeMy WebLinkAboutCover pageDRAWING LIST ft CS COVER SHEET (THIS SHEET) X-0.03 LIFE SAFETY PLAN D-1.03 DEMOLITION PLAN A-1.03 ARCHITECTURAL PLAN A-2.03 REFLECTED CEILING PLAN A-3.03 POWER, VOICE Is DATA PLAN A-4.03 FINISH PLAN A-5.00 DOOR A HARDWARE SCHEDULES A-6,00 INTERIOR ELEVATIONS A-7.00 PARTITION TYPES AND DETAILS A-TOI DETAILS AND ENLARGED PLANS A-8.00 CONSTRUCTION NOTES FURNITURE DRAWINGS (FOR REFERENCE ONLY) F-1.03 FURNITURE PLAN E-0.03 ELECTRICAL SCHEDULES. LEGEND AND NOTES E-1.03 ELECTRICAL DEMOLITION POWER PLAN E-2.03 ELECTRICAL DEMOLITION LIGHTING PLAN E-3.03 ELECTRICAL POWER PLAN E-4.03 ELECTRICAL LIGHTING PLAN E-5.03 MECHANICAL HVAC POWER PLAN E-6.03 ELECTRICAL PANEL BOARD SCHEDULES E-7.03 ELECTRICAL LIGHTING CONTROL DIAGRAMS E-8.03 ELECTRICAL LIGHTING CONTROL DIAGRAMS E-9.03 ELECTRICAL SPECIFICATIONS FP-0.03 FIRE PROTECTION SCHEDULES, LEGENDS, AND NOTES FP-1.03 FIRE PROTECTION PLAN M-0.03 MECHANICAL HVAC DETAILS, LEGENDS, AND NOTES M-0.13 MECHANICAL HVAC SCHEDULES M-1.03 MECHANICAL HVAC DEMOLITION PLAN M-2.03 MECHANICAL HVAC PIPING DEMOLITION PLAN M-3.03 MECHANICAL HVAC PLAN M-4.03 MECHANICAL HVAC PIPING PLAN M-5.03 MECHANICAL SPECIFICATIONS P-0.03 PLUMBING SCHEDULES, LEGENDS, AND NOTES P-1.03 PLUMBING PLAN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 10/23/19