DEMOLITION NOTES
®
AREA NOT IN CONTRACT
I.
THE PREMISES SHALL BE IN COMPLIANCE WITH ALL CURRENTLY APPLICABLE CODES,
REGULATIONS AND ORDINANCES OF ALL GOVERNING BODIES HAVING JURISDICTION
OVER THE PROJECT, IN ORDER TO PERMIT DEMOLITION IN ACCORDANCE WITH THIS
EXISTING PARTITION TO REMAIN.
PLAN.
j�
2.
COORDINATE ALL DEMOLITION WITH THE NEW SCOPE OF WORK, AS SHOWN ON THE
J \L
ARCHITECTURAL DRAWINGS.
EXISTING DOOR TO REMAIN.
3.
AS REQUIRED, PATCH AND REPAIR ALL EXISTING CONSTRUCTION TO REMAIN AS A
EXISTING PARTITION TO BE DEMOLISHED.
RESULT OF DEMOLITION OF ADJACENT AND ATTACHED CONSTRUCTION. WHERE
PARTITIONS ADJACENT TO EXTERIOR WINDOWS ARE TO BE DEMOLISHED, PATCH AND
�-�
REPAIR CONVECTORS, MULLIONS AND SILLS TO MATCH EXISTING LIKE ELEMENTS.
I
EXISTING DOOR, FRAME & HARDWARE TO BE REMOVED, WITH SELECTIVE
4,
AS APPLICABLE, G.C. TO REMOVE ALL ABANDONED AND NO LONGER ACTIVE POWER
SALVAGING, IN ORDER TO FULFILL THE REQUIREMENTS STATED IN THE
WIRING FROM EITHER THE CEILING PLENUM, DEMOLISHED PARTITIONS OR FLOOR
DOOR &HARDWARE SCHEDULES ON DWG. A-5.00.
OUTLETS TO BE ABANDONED. INACTIVE CIRCUITS ARE TO BE REMOVED BACK TO
THE CIRCUIT PANEL.
EXISTING GWB SOFFIT TO BE REMOVED.
5.
AS APPLICABLE, GENERAL CONTRACTOR TO REMOVE ALL ABANDONED AND NO
J
LONGER ACTIVE VOICE/DATA CABLING FROM EITHER THE CEILING PLENUM,
DEMOLISHED PARTITIONS OR FLOOR OUTLETS TO BE ABANDONED. INACTIVE DATA
1_I_L
CABLING TO BE REMOVED BACK TO THE SOURCE, AND INACTIVE TELEPHONE
I I I
EXISTING 2' X 2' SUSPENDED ACOUSTICAL CEILING GRID AND TILE TO BE
CABLING TO BE REMOVED BACK TO THE PUNCHDOWN BLOCKS.
-T I r
DEMOLISHED.
6.
ALL EXISTING FLOOR OUTLETS TO BE ABANDONED SHALL HAVE THEIR BOXES
REMOVED, CORE DRILLS FIRE-SAFED AND BE CAPPED FLUSH WITH THE FLOOR SLAB.
HANDLE ABANDONED WIRING AND CABLING PER DEMOLITION NOTES /4 AND 15.
�P IP
EXISTING ELECTRICAL OUTLET TO BE REMOVED, REFER TO NOTES 14 & (7.
COORDINATE WITH THE BUILDING MI FOR ACCESS TO FLOOR BELOW.
.,.
VOICE/DATA CABLING TO BE REMOVED, REFER TO NOTES F5 & 17.
7.
THE GENERAL CONTRACTOR WILL BE RESPONSIBLE TO REMOVE UNNEEDED
BACKBOXES. RESULTING FROM THE REMOVAL OF WALL INFEEDS, VOICE/DATA
CONNECTORS AND POWER OUTLETS RELATED TO THE PREVIOUS LAYOUT FOR THE
rwriwri
EXISTING WALL INFEED TO BE REMOVED, REFER TO NOTES 14 - III
SUITE. PATCH WALLS SMOOTH IN PREPARATION FOR NEW WALL FINISH(ES).
S.
AS REQUIRED, ANY DISRUPTED FIREPROOFING OF ALL BUILDING STRUCTURAL MEMBERS
yN
EXISTING FLOOR OUTLETS TO BE REMOVED. SEE NOTES 14 - 16
AND WITHIN DEMISING WALLS, FLOORS AND CEILINGS SHALL BE SUPPLEMENTED
AFTER DEMOLITION, IN ACCORDANCE WITH ALL CURRENTLY APPLICABLE CODES,
REGULATIONS AND ORDINANCES OF ALL GOVERNING BODIES HAVING JURISDICTION
¢co
EXISTING FIRE EXTINGUISHER &CABINET TO REMOVED AND SALVAGED FOR
OVER THE PROJECT.
REUSE. G.C. TO CONFIRM LOCATIONS PRIOR TO BID SUBMISSION.
9.
DO NOT CLOSE OR OBSTRUCT FACILITIES OR INTERRUPT UTILITIES WITHOUT PRIOR
L(-fl
EXISTING CARD READER AND ELECTRIC STRIKE TO BE REMOVED
PERMISSION FROM AND COORDINATION WITH THE BUILDING MANAGEMENT.
10.
THE SCHEDULING, SEQUENCING AND EXECUTION OF THE DEMOLITION WORK, REMOVAL
�A_U]
EXISTING MOTION DETECTOR DEVICE TO BE REMOVED
OF DEBRIS AND STORAGE OF SALVAGED ITEMS SHALL BE COORDINATED WITH THE
BUILDING MANAGEMENT AND PERFORMED ACCORDING THE BUILDING MANAGEMENT'S
INSTRUCTIONS.
11.
G.C. IS RESPONSIBLE TO TAKE WHATEVER STEPS ARE REQUIRED TO PROTECT THE
EXISTING WINDOW BLINDS DURING DEMOLITION AND CONSTRUCTION. GENERAL
CONTRACTOR IS ALSO RESPONSIBLE TO ENSURE THAT ALL WINDOW BLINDS DO
12.
13. UNLESS OTHERWISE NOTED ON DRAWINGS, REMOVE ALL EXISTING WALLCOVERINGS.
G.C. TO CONFIRM LOCATIONS PRIOR TO BID SUBMISSION.
14. G.C. IS RESPONSIBLE TO SALVAGE THE FOLLOWING ITEMS FOR REUSE WHERE
APPLICABLE. TYPICAL SALVAGEABLE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO:
DOORS, FRAMES, AND HARDWARE
15. DEMOLITION MAY OCCUR DURING NORMAL BUSINESS HOURS. PRECAUTIONS MUST BE
TAKEN TO ENSURE MINIMAL DISRUPTIONS TO ONGOING BUSINESS OPERATIONS OF
OTHER TENANTS IN THE BUILDING.
16. AS APPLICABLE, REMOVE ALL WATER AND VENT PIPING BACK TO VALVE OR CAPPED
CONNECTIONS AT BUILDING CORE. RESTORE FLOOR SLAB AND FIRE -RATED ELEMENTS
AS REQUIRED.
17. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE TO PREVENT AIRBORNE DEBRIS
FROM ENTERING THE AIR DISTRIBUTION SYSTEM BY PROVIDING DUST PROTECTION
AROUND THE WORK SITE, AND ON ALL RETURN AIR GRILLES, DIFFUSERS AND VAV
BOXES. ALSO, AS IS PRACTICABLE, GENERAL CONTRACTOR WILL ALSO INSTALL
FILTERING MEDIA OVER THE MAIN AIR HANDLERS ON THE FLOOR TO PROTECT THE
UNITS FROM EXCESS DUST ACCUMULATION DURING DEMOLITION AND CONSTRUCTION.
18. THE GENERAL CONTRACTOR IS TO PLAN AND PROVIDE FOR TEMPORARY BARRIERS
19. G.C. IS TO REMOVE ALL EXISTING CEILING TILES IN PREPARATION FOR NEW
ACOUSTICAL TILE TO BE INSTALLED. REFER TO DRAWING A-2.03 FOR FURTHER
INFORMATION ON CEILING GRID AND ACOUSTICAL TILE. SEE ALTERNATE it FOR NEW
CEILING GRID.
20. ALL EXISTING LIGHT FIXTURES, EXIT SIGNS AND LIGHT SWITCHES TO BE
DEMOLISHED IN PREPARATION FOR NEW. REFER TO DRAWING A-2.03 AND ENGINEER'S
DRAWINGS FOR ADDITIONAL INFORMATION.
21. SEE ENGINEERING DOCUMENTATION FOR EXTENT OF DEMOLITION TO THE
MECHANICAL, ELECTRICAL, SPRINKLER OR PLUMBING SYSTEMS.
RELEA
Suhje
3ED FOR CONSTRUCTION
1 to compliance with all regulations
of State and Local Codes
City of Camel
s n
DEMOLITION PLAN
SCALE:
1/8"= 1'-0"
H
E
L
L Y E R
LEWIS
ARCHITECTURE
INTERIOR DESIGN
Project:
Liberty
Mutual,
INSURANCE
450 East 96th St
3rd Floor
Indianapolis IN 46240
Scale: 1 /8" = 1'-0"
Drawing:
Demolition
Plan
No. D-1 w03
DATE: 10/23/19