HomeMy WebLinkAboutM-2.03(XM)WSHP-3-1
(XM)WSHP-3-26
/ Tyr
/ III
(%M)WSHP-3-2
(%)WSHP-3-27
0.
— X — (XA/4•crow —
(X)a/4'cws — X
I
(XM)WSHP-3-25
II
II
II
II
II
III
(XM)WSHP-3-5�-
d
QoIN/A'Ca
IL
(XR)WSHP-3-4 Ir---------
' I I
(Xu)I-t/scxs � x
(Mlp-1/2YMR rn11-I iavx ft I (%)WSHP1)3-6
I
2" COND. IJ�
DRAIN RISER
d
(%M)WSH2-3-7
8
(%M)WSHP-3-10
AAAgS+ (XYi3/1•Co
•W 2" COND.
DRAIN RISER \7.
H // p'�5 �• H - (XR)WSHP-3-9
(X1113VM gg 8
4' P
10IP1/7 7 7-
.&
A�
�J\
\: \ (%M)WSHP-3-24
j
(XM)WSHP-3-23
/ O (XM)3/4•cws
`�(Xw)a/eLwn
(%)WSHP-3-22 1x
� I
0
(%M)WSHP-3-20
11m
L
t_3
(XR)WSHP-3-19
rX—X O
�I
�I
0040/4.0 --= I I
(XM)WSHP-3-18
= (XM)WSHP-3-11
H (%R)WSHP-3-13
U
L
' F (XM)WSHP-3-14
a
fill)%•Lin(
(XM)WSHP-3-17
IIntegrated
/' E Engineering
ConsW tantsjnc.
9700 ROCKSIDE RD. SUITE #290
CLEVELAND, OH 44125
(P): 216.901.6711
(F): 216.901.6712
w%VvJ inc.cc
PE11NO75
•'.
-a •, STATE OF
0
(
II
II
II
II
II
(XM)WSHP-3-12 �
/
(XM)WSHP-3-15
Mechanical HVAC Piping Demolition Plan SALE:
MECHANICAL HVAC PIPING DEMOLITION PLAN GENERAL NOTES:
1. MECHANICAL HVAC CONTRACTOR SHALL COORDINATE ANY NECESSARY SHUTDOWNS WITH
BUILDING/MANAGEMENT.
2. MECHANICAL HVAC CONTRACTOR SHALL PERFORM A FIELD SURVEY PRIOR TO COMMENCING
WITH DEMOLITION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND FOR
DIRECTION PRIOR TO COMMENCING WITH DEMOLITION.
3. ANY EXISTING SYSTEMS AND/OR EQUIPMENT NOTED AS EXISTING TO REMAIN SHALL BE
FIELD VERIFIED FOR DEFICIENCIES. NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES
DISCOVERED.
4. EXISTING EQUIPMENT TO BE RELOCATED SHALL BE INSPECTED PRIOR TO RELOCATION.
NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES DISCOVERED.
5. PROJECT SCOPE INVOLVES REMOVAL AND MODIFICATION TO CONDENSER WATER PIPING
SYSTEM. CONTRACTOR SHALL ISOLATE/SHUTOFF SYSTEM AND DRAIN (AND PROPERLY
DISPOSE) TO ACCOMMODATE SCOPE OF WORK.
6. MECHANICAL HVAC CONTRACTOR SHALL REFER TO ALL SHEETS CONTAINED IN DRAWING
SET FOR COMPLETE SCOPE OF WORK. TYPICAL DETAILS, INSTALLATION REQUIREMENTS
AND GENERAL BUILDING STANDARDS ARE REFERENCED AND APPLICABLE TO THESE
CONTRACT DOCUMENTS.
7. CODED NOTE NUMBERS USED/NOT USED FOR CONSISTENCY BETWEEN SHEETS.
8. R IS THE INTENT TO REUSE DUCTWORK WHERE PRACTICAL CONTRACTOR MAY REUSE
DUCT TAPS OF EQUAL SIZE. ANY EXISTING CONDITIONS THAT VARY SHALL BE BROUGHT
TO THE ATTENTION OF THE ARCHDECT/ENGINEER PRIOR TO FABRICATION OR INSTALLATION
OF NEW HVAC SYSTEMS.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
�Mn,�31a>A�1�A�
MECHANICAL HVAC PIPING DEMOLITION PLAN CODED NOTES: O
Q REMOVE EXISTING WATER SOURCE HEAT PUMP COMPLETE. CAP CONDENSER WATER
SUPPLY, RETURN AND CONDENSATE PIPING AT CONNECTION TO MAIN.
0 EXISTING WATER SOURCE HEAT PUMP TO BE RELOCATED. CAP PIPING AT CONNECTION
TO MAIN. SEE SHEET M4.03 FOR NEW LOCATION.
Q EXISTING WATER SOURCE HEAT PUMP TO BE RELOCATED. REWORK EXISTING WATER AND
CONDENSATE PIPING TO ACCOMMODATE NEW LOCATION.
N
H
E
L
L Y E R
LEWIS=
ARCHITECTURE
INTERIOR DESIGN
Project:
Liberty
Mutual.
INSURANCE
450 East 96th St
3rd Floor
Indianapolis IN 46240
Project No: 047.S6
Drawn by:
jH
Checked by:
HjHH
Approved by:
HjHH
Client Approval:
Date:
Issue For Bid:
11 /02/18
Issue For Permit: 11 /05/18
No.
Date
Revision
Scale: 1 /8" =
V-0"
Drawing:
Mechanical
HVAC
Piping
Demolition Plan
No. M-2.03
DATE: 10/23/19