Loading...
HomeMy WebLinkAboutM-2.03(XM)WSHP-3-1 (XM)WSHP-3-26 / Tyr / III (%M)WSHP-3-2 (%)WSHP-3-27 0. — X — (XA/4•crow — (X)a/4'cws — X I (XM)WSHP-3-25 II II II II II III (XM)WSHP-3-5�- d QoIN/A'Ca IL (XR)WSHP-3-4 Ir--------- ' I I (Xu)I-t/scxs � x (Mlp-1/2YMR rn11-I iavx ft I (%)WSHP1)3-6 I 2" COND. IJ� DRAIN RISER d (%M)WSH2-3-7 8 (%M)WSHP-3-10 AAAgS+ (XYi3/1•Co •W 2" COND. DRAIN RISER \7. H // p'�5 �• H - (XR)WSHP-3-9 (X1113VM gg 8 4' P 10IP1/7 7 7- .& A� �J\ \: \ (%M)WSHP-3-24 j (XM)WSHP-3-23 / O (XM)3/4•cws `�(Xw)a/eLwn (%)WSHP-3-22 1x � I 0 (%M)WSHP-3-20 11m L t_3 (XR)WSHP-3-19 rX—X O �I �I 0040/4.0 --= I I (XM)WSHP-3-18 = (XM)WSHP-3-11 H (%R)WSHP-3-13 U L ' F (XM)WSHP-3-14 a fill)%•Lin( (XM)WSHP-3-17 IIntegrated /' E Engineering ConsW tantsjnc. 9700 ROCKSIDE RD. SUITE #290 CLEVELAND, OH 44125 (P): 216.901.6711 (F): 216.901.6712 w%VvJ inc.cc PE11NO75 •'. -a •, STATE OF 0 ( II II II II II (XM)WSHP-3-12 � / (XM)WSHP-3-15 Mechanical HVAC Piping Demolition Plan SALE: MECHANICAL HVAC PIPING DEMOLITION PLAN GENERAL NOTES: 1. MECHANICAL HVAC CONTRACTOR SHALL COORDINATE ANY NECESSARY SHUTDOWNS WITH BUILDING/MANAGEMENT. 2. MECHANICAL HVAC CONTRACTOR SHALL PERFORM A FIELD SURVEY PRIOR TO COMMENCING WITH DEMOLITION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOUND FOR DIRECTION PRIOR TO COMMENCING WITH DEMOLITION. 3. ANY EXISTING SYSTEMS AND/OR EQUIPMENT NOTED AS EXISTING TO REMAIN SHALL BE FIELD VERIFIED FOR DEFICIENCIES. NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES DISCOVERED. 4. EXISTING EQUIPMENT TO BE RELOCATED SHALL BE INSPECTED PRIOR TO RELOCATION. NOTIFY ARCHITECT AND ENGINEER OF ANY DEFICIENCIES DISCOVERED. 5. PROJECT SCOPE INVOLVES REMOVAL AND MODIFICATION TO CONDENSER WATER PIPING SYSTEM. CONTRACTOR SHALL ISOLATE/SHUTOFF SYSTEM AND DRAIN (AND PROPERLY DISPOSE) TO ACCOMMODATE SCOPE OF WORK. 6. MECHANICAL HVAC CONTRACTOR SHALL REFER TO ALL SHEETS CONTAINED IN DRAWING SET FOR COMPLETE SCOPE OF WORK. TYPICAL DETAILS, INSTALLATION REQUIREMENTS AND GENERAL BUILDING STANDARDS ARE REFERENCED AND APPLICABLE TO THESE CONTRACT DOCUMENTS. 7. CODED NOTE NUMBERS USED/NOT USED FOR CONSISTENCY BETWEEN SHEETS. 8. R IS THE INTENT TO REUSE DUCTWORK WHERE PRACTICAL CONTRACTOR MAY REUSE DUCT TAPS OF EQUAL SIZE. ANY EXISTING CONDITIONS THAT VARY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHDECT/ENGINEER PRIOR TO FABRICATION OR INSTALLATION OF NEW HVAC SYSTEMS. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel �Mn,�31a>A�1�A� MECHANICAL HVAC PIPING DEMOLITION PLAN CODED NOTES: O Q REMOVE EXISTING WATER SOURCE HEAT PUMP COMPLETE. CAP CONDENSER WATER SUPPLY, RETURN AND CONDENSATE PIPING AT CONNECTION TO MAIN. 0 EXISTING WATER SOURCE HEAT PUMP TO BE RELOCATED. CAP PIPING AT CONNECTION TO MAIN. SEE SHEET M4.03 FOR NEW LOCATION. Q EXISTING WATER SOURCE HEAT PUMP TO BE RELOCATED. REWORK EXISTING WATER AND CONDENSATE PIPING TO ACCOMMODATE NEW LOCATION. N H E L L Y E R LEWIS= ARCHITECTURE INTERIOR DESIGN Project: Liberty Mutual. INSURANCE 450 East 96th St 3rd Floor Indianapolis IN 46240 Project No: 047.S6 Drawn by: jH Checked by: HjHH Approved by: HjHH Client Approval: Date: Issue For Bid: 11 /02/18 Issue For Permit: 11 /05/18 No. Date Revision Scale: 1 /8" = V-0" Drawing: Mechanical HVAC Piping Demolition Plan No. M-2.03 DATE: 10/23/19