Loading...
HomeMy WebLinkAboutC010.2_SWPPP_NARRATIVETH I S D O C U M E N T H A S B E E N P R E P A R E D B Y P R O G R E S S I V E A E A S A N I N S T R U M E N T O F S E R V I C E , A N D P R O G R E S S I V E A E SH A L L R E T A I N A L L C O M M O N L A W , S T A T U T O R Y A N D O T H E R R E S E R V E D R I G H T S , I N C L U D I N G T H E C O P Y R I G H T T H E R E T O . ISSUANCES REVISIONS NO T F O R CO N S T R U C T I O N If this document is sealed and signed in a digital or electronic format and is received from someone other than the sealing professional identified in the document, you must contact the sealing professional in writing to validate authenticity of the document. The sealing professional disclaims the seal and signature and shall not be liable for any liability associated with it where the authenticity of any digital or electronic seal or signature has not been validated in this manner. NO.DATE DESCRIPTION 6/1 3 / 2 0 1 9 1 1 : 1 9 : 0 7 A M P:\ 7 0 0 5 0 0 1 2 \ W I P D R A W I N G S \ C 1 . 2 - S W P P P N A R R A T I V E . d w g sh o r t j 18 1 1 4 M i l e R d N E G r a n d R a p i d s , M I 4 9 5 2 5 6 1 6 . 3 6 1 . 2 6 6 4 w w w . p r o g r e s s i v e a e . c o m DRAWN BY PROFESSIONAL PROJECT MANAGER FILE NUMBER CHECKED BY CH R I S T I A N B R O T H E R S A U T O M O T I V E PR O P O S E D S E R V I C E CE N T E R MI C H I G A N R O A D , C A R M E L , I N 70050012 JPM REVISED PLANS FOR REVIEW 06/13/2019 C1.2 SWPPP NARRATIVE JRS JPM 1.THE CONTRACTOR SHALL MAINTAIN A COPY OF THE SWPPP ON THE SITE FOR THE DURATION OF CONSTRUCTION. 2.THE CONTRACTOR SHALL ADHERE TO THE SWPPP DURING CONSTRUCTION OPERATIONS. 3.THE SWPPP INCLUDES THE SWPPP DRAWINGS, NOTES, NARRATIVE, AND ASSOCIATED DETAIL SHEETS. 4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND REPAIR ALL BMP'S DURING CONSTRUCTION. 5.ALL EARTH-DISTURBING CONSTRUCTION ACTIVITIES SHALL BE PERFORMED WITHIN THE LIMITS OF DISTURBANCE AS INDICATED ON THE SWPPP DRAWINGS. 6.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE LIMITS OF DISTURBANCE SHOWN ON THE DRAWINGS AND FILED-STAKING THE LIMIT OF DISTURBANCE LINE PRIOR TO THE START OF CONSTRUCTION. 7.PERIMETER EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO THE START OF ANY LAND CLEARING OR GRADING ACTIVITIES. 8.THE CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES WHEN REQUIRED BY THESE PLAN DRAWINGS AND IMPLEMENT ADDITIONAL MEASURES AS DICTATED BY SITE CONDITIONS. 9.THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY SEDIMENTATION RESULTING FROM WORK ON THE SITE IS CONTAINED ON THE SITE AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS. 10.SLOPES ARE TO BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 11.CONTRACTOR LAY DOWN, STAGING AND STOCKPILE AREAS ARE TO BE LOCATED WITHIN THE PERMITTED LIMITS OF DISTURBANCE. 12.SILT FENCE IS TO BE INSTALLED AROUND THE PERIMETER OF ON-SITE SOIL STOCKPILE AREAS AS DICTATED BY SITE CONDITIONS. ADDITIONALLY, INACTIVE PORTIONS OF THE STOCKPILE ARES ARE TO BE STABILIZED AS REQUIRED HEREIN. 13.IMPLEMENT TEMPORARY STABILIZATION MEASURES ON ANY DISTURBED AREAS WHERE CONSTRUCTION ACTIVITIES WILL NOT RESUME FOR 14 DAYS OR MORE. IMPLEMENTATION OF TEMPORARY STABILIZATION MEASURES MUST BE INITIATED IMMEDIATELY AND COMPLETED WITHIN SEVEN (7) DAYS FROM WHEN CONSTRUCTION ACTIVITIES TEMPORARILY CEASED ON ANY PORTION OF THE SITE. 14.EXPOSED AREAS ARE TO BE SEEDED/STABILIZED AS SPECIFIED WITHIN SEVEN (7) DAYS FOLLOWING THE CONCLUSION OF FINAL GRADING IN THAT AREA. 15.THE CONTRACTOR IS RESPONSIBLE FOR REGULARLY CHECKING SODDED AREAS TO SEE THAT A GOOD STAND OF VEGETATION IS ESTABLISHED. AREAS SHOULD BE FERTILIZED, WATERED, AND RE-SEEDED AS NEEDED. THE CONTRACTOR IS RESPONSIBLE TO ENSURE VEGETATION IS ESTABLISHED FOR A WARRANTY PERIOD OF TWO FULL GROWING SEASONS. 16.TRACKING OF SOIL AND SEDIMENT ONTO OFF-SITE ROADWAYS SHALL BE MINIMIZED THROUGH THE USE OF APPROPRIATE MEASURES. THE CONTRACTOR SHALL IMMEDIATELY REMOVE ANY SOIL OR SEDIMENT TRACKED ONTO THE ROADWAYS. 17.THE CONTRACTOR SHALL BRING TO THE SITE AND USE ONLY EQUIPMENT THAT IS WELL-MAINTAINED AND WITHOUT LEAKS. 18.NO VEHICLES AND EQUIPMENT CLEANING IS ALLOWED AT LOCATIONS WHERE RUNOFF SHALL FLOW DIRECTLY INTO A WATER COURSE. 19.EMPTY CANISTERS, CANS, OR OTHER CHEMICAL CONTAINERS (I.E. FROM HYDRAULIC FLUIDS, ETC.) AND ALL OTHER WASTE MATERIALS ARE TO BE KEPT IN APPROPRIATE SEALED WASTE CONTAINERS AND UNTIL THEY CAN BE REMOVED FROM THE SITE FOR PROPER OFF-SITE DISPOSAL. 20.MAINTAIN LANDSCAPE BUFFER WHERE INDICATED ON STORM WATER POLLUTION PREVENTION PLAN. 21. THE PREDOMINANT SOIL TYPE ON SITE IS LOAM PER THE USGS SOIL SURVEY. SWPPP FOR CONSTRUCTION SITES 1.14 DIGIT WATERSHED HYDROLOGIC UNIT CODE: 05120201120080 2.RECEIVING WATERS:EAGLE CREEK-LONG BRANCH / IRISHMAN RUN 3.10-YEAR POST CONSTRUCTION PEAK DISCHARGE:4.47 CFS 4.STORMWATER DISCHARGE LOCATIONS STORMWATER WILL DISCHARGE FROM THE SITE TO A CATCH BASIN (CB 2.2) IN REDD ROAD, ON THE EAST SIDE OF THE PROPERTY. THERE IS A SMALL AREA OF THE PROPERTY IN THE NORTH EAST CORNER THAT DISCHARGES TO THE NORTH, MATCHING EXISTING DRAINAGE PATTERNS. 5.DIRECT GROUNDWATER DISCHARGE LOCATIONS THERE ARE NO PROPOSED GROUNDWATER DISCHARGE LOCATIONS FOR THE PROPOSED PROJECT 6.SOILS MAP: SOILS ON SITE ARE PREDOMINATELY CLAY AND DRAIN POORLY. THE PROPOSED SITE HAS ACCOMMODATED THE EXISTING SOIL LIMITATIONS BY PROVIDING DRAINAGE STRUCTURES AND SWALES TO ADEQUATELY DRAIN THE SITE. 7.B1 DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THE FOLLOWING POTENTIAL POLLUTANT SOURCES MAY BE ASSOCIATED WITH CONSTRUCTION ACTIVITIES ON SITE: ·MATERIAL STORAGE AREAS (MORE SPECIFICALLY DESCRIBED BELOW) ·CONSTRUCTION WASTE MATERIAL ·FUEL STORAGE AREAS AND FUELING STATIONS ·EXPOSED SOILS ·LEAKING VEHICLES AND EQUIPMENT ·SANITARY WASTE FROM TEMPORARY TOILET FACILITIES ·LITTER ·WINDBLOWN DUST ·SOIL TRACKING OFF SITE FROM CONSTRUCTION EQUIPMENT THE FOLLOWING CONSTRUCTION MATERIALS WILL BE STAGED OR STORED ON SITE AT VARIOUS POINTS DURING DEVELOPMENT OF THE SITE. ·STRUCTURAL FILL ·ROAD BASE ·STORM DRAINAGE PIPE ·STORM CULVERTS ·PRECAST CONCRETE MANHOLES HALF SCALE 8. TEMPORARY AND PERMANENT STORMWATER QUALITY MEASURES TEMPORARY SILT FENCE LOCATION:CHRISTIAN BROTHERS SITE, SEE SHEETS C1 AND C1.0 FOR LOCATIONS DIMENSIONS:1,100 LF SPECIFICATIONS:SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE:INSPECT SILT FENCE AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND FOLLOWING ANY STORM EVENT. INLET PROTECTION FABRIC DROP LOCATION:CHRISTIAN BROTHERS SITE, SEE SHEET C1.0 FOR LOCATIONS QUANTITY:8 DIMENSIONS:4'x2'x3' (LxWxH) SPECIFICATIONS:SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE: INSPECT INLET PROTECTION FABRIC DROPS AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND FOLLOWING ANY STORM EVENT. STABILIZED CONSTRUCTION ACCESS LOCATION:CHRISTIAN BROTHERS SITE, SEE SHEET C1.0 FOR LOCATIONS DIMENSIONS:65'x 20' (LxW) SPECIFICATIONS:SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE: INSPECT CONSTRUCTION ACCESS AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND FOLLOWING ANY STORM EVENT. EROSION CONTROL BLANKET LOCATION:CHRISTIAN BROTHERS SITE ON THE SOUTH SIDE OF THE PROPOSED BUILDING, SEE SHEET C1.0 FOR LOCATIONS DIMENSIONS:315'x 25' (LxW) SPECIFICATIONS:SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.2 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE: INSPECT EROSION CONTROL BLANKET AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND FOLLOWING ANY STORM EVENT. PERMANENT STORMWATER DETENTION BASIN LOCATION:WEST ARIA APARTMENT DEVELOPMENT DIMENSIONS:±800 FT (LONG) x ±165 FT (WIDE) SPECIFICATIONS:SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. CONSTRUCTION DETAILS: SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. MONITORING AND MAINTENANCE:SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. WATER QUALITY MECHANICAL UNITS LOCATION:WEST ARIA APARTMENT DEVELOPMENT QUANTITY:3 MECHANICAL WATER QUALITY UNITS DIMENSIONS:TO BE DETERMINED SPECIFICATIONS:SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. CONSTRUCTION DETAILS: SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. MONITORING AND MAINTENANCE:SEE ARIA SITE DEVELOPMENT PLANS AND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BY WEIHE ENGINEERS. STORMWATER CATCH BASINS WITH SUMP LOCATION:CHRISTIAN BROTHERS SITE, SEE SHEET C3 FOR LOCATIONS QUANTITY:8 DIMENSIONS:4 FT AND 2 FT DIAMETER SPECIFICATIONS:SEE DETAIL SHEET C5.1 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.1 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE:STORMWATER CATCH BASINS AND MANHOLES WILL NEED TO BE INSPECTED AND CLEANED BASED ON O AND M MANUAL MAINTENANCE SCHEDULE. PERMANENT SEEDING / PLANTINGS LOCATION:CHRISTIAN BROTHERS SITE, SEE SHEET C3 FOR LOCATIONS DIMENSIONS:SEE SHEET C3 FOR DIMENSIONS SPECIFICATIONS:SEE DETAIL SHEET C5.1 FOR DETAILS AND SPECIFICATIONS CONSTRUCTION DETAILS: SEE DETAIL SHEET C5.1 FOR DETAILS AND SPECIFICATIONS. MONITORING AND MAINTENANCE:STORMWATER CATCH BASINS AND MANHOLES WILL NEED TO BE INSPECTED AND CLEANED BASED ON O AND M MANUAL MAINTENANCE SCHEDULE. 9. GENERAL CONSTRUCTION SEQUENCE 1.THE NOTICE OF INTENT (NOI) LETTER SHALL BE SUBMITTED TO IDEM PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITIES 2.DESIGNATE THE PERSON RESPONSIBLE FOR COMPLYING WITH THE ONSITE SWPPP. COORDINATE RESPONSIBILITY FOR COMPLETING THE SITE REVIEWS AFTER EACH 1 2" RAINFALL AND A MINIMUM OF ONE TIME A WEEK. 3.A PRE-CONSTRUCTION MEETING WITH CITY OF CARMEL MUST BE HELD BEFORE ANY LAND DISTURBING ACTIVITIES MAY COMMENCE. AFTER THE PERIMETER PRACTICES HAVE BEEN INSTALLED, NOTIFY ROB BECK, RULE 5 COORDINATOR, AT (317) 233-1864 OR RBECK@IDEM.STATE.IN.US AND THE CITY OF CARMEL (317) 571-2441. 4.POST THE CONTACT INFORMATION AT THE CONSTRUCTION ENTRANCE. INCLUDE A COPY OF THE NOI AND THE CONTACT INFORMATION FOR THE PERSON RESPONSIBLE FOR IMPLEMENTING THE SWPPP. THE SWPPP SHOULD BE ONSITE AND WEEKLY SITE REPORTS NEED TO BE AVAILABLE WITHIN 48 HOURS OF A REQUEST. 5.INSTALL SILT FENCE AND INLET PROTECTION ON EXISTING INLETS AND CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE. 6.INSTALL FUELING AREA, PORT-A-LET, CONSTRUCTION DUMPSTER, CONCRETE WASHOUT FACILITY AND STAGING AREA. 7.INSTALL SANITARY AND WATER MAINS, AND STORM SEWER. 8.ROUGH GRADE SITE. 9.CONSTRUCT ROADWAY INCLUDING CURB, DRIVES, AND SIDEWALKS. 10.PERFORM FINAL GRADING. 11.PLACE SOD AND REMAINING LANDSCAPING, AND REVIEW FINAL STABILIZATION. 12.REMOVE SILT FENCE, AND INLET PROTECTION AND CLEAN ALL PERMANENT BMPS AFTER ALL AREAS ARE STABILIZED. 13.ONCE THE CONSTRUCTION ACTIVITY IS COMPLETED (BY RULE LANGUAGE, WHEN FINAL STABILIZATION HAS OCCURRED), A COMPLETE RULE 5 NOTICE OF TERMINATION (NOT) FORM MUST BE SUBMITTED TO IDEM, WITH A COPY BEING SENT TO CITY OF CARMEL ENGINEERING DEPARTMENT. 10. LOCATION OF PROPOSED SOIL STOCKPILES SOIL AND TOPSOIL STOCKPILE AREAS WILL BE FIELD DETERMINED ON-SITE. A PROPOSED STOCKPILE LOCATION IS SHOWN ON SHEET C1.1. ALL STOCKPILES ARE TO BE ENCOMPASSED BY SILT FENCE. 11. TEMPORARY AND PERMANENT SURFACE STABILIZATION METHODS SEEDING AND MULCHING SPECIFICATIONS ARE PROVIDED ON LANDSCAPE PLANS LP-1 AND LP-2. 12. EROSION AND SEDIMENT CONTROL SPECIFICATIONS EROSION AND SEDIMENT CONTROL SPECIFICATIONS ARE SHOWN ON SHEETS C1.1, C5.2, AND THIS SHEET. 13. MATERIAL HANDLING, STORAGE, AND SPILL PREVENTION PLAN SOLID WASTE DISPOSAL NO SOLID MATERIAL, INCLUDING BUILDING MATERIALS, IS PERMITTED TO BE DISCHARGED TO SURFACE WATERS OR BURIED ON SITE. ALL SOLID WASTE MATERIALS, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE CONSTRUCTION ACTIVITY, MUST BE COLLECTED IN CONTAINERS OR CLOSED DUMPSTERS. THE COLLECTION CONTAINERS MUST BE EMPTIED PERIODICALLY AND THE COLLECTED MATERIAL HAULED TO A LANDFILL PERMITTED BY THE STATE AND/OR APPROPRIATE LOCAL MUNICIPALITY TO ACCEPT THE WASTE FOR DISPOSAL. A FOREMAN OR SUPERVISOR SHOULD BE DESIGNATED IN WRITING TO OVERSEE, ENFORCE, AND INSTRUCT CONSTRUCTION WORKERS ON PROPER SOLID WASTE PROCEDURES. IN CASE OF EMERGENCIES, SPILLS OR POTENTIAL CONTAMINATION, PLEASE CALL THE APPROPRIATE NUMBER AS LISTED BELOW: A.IF AN EMERGENCY OCCURS, CALL 911. B.MINOR SPILLS OF HAZARDOUS MATERIAL MUST BE REPORTED BY CALLING JOHNSON COUNTY EMERGENCY MANAGEMENT AGENCY 317 736-9064 C.IDEM 24 HOUR SPILL HOTLINE 1-888-233-7745 HAZARDOUS WASTE WHENEVER POSSIBLE, MINIMIZE THE USE OF HAZARDOUS MATERIALS AND GENERATION OF HAZARDOUS WASTES. ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED IN THE MANNER SPECIFIED BY FEDERAL, STATE, OR LOCAL REGULATIONS OR BY THE MANUFACTURER. USE CONTAINMENT BERMS IN FUELING AND MAINTENANCE AREAS AND WHERE POTENTIAL FOR SPILLS IS HIGH. A FOREMAN OR SUPERVISOR SHOULD BE DESIGNATED IN WRITING TO OVERSEE, ENFORCE AND INSTRUCT CONSTRUCTION WORKERS ON PROPER HAZARDOUS WASTE PROCEDURES. THE LOCATION OF ANY HAZARDOUS WASTE STORAGE AREAS SHOULD BE INDICATED ON THE STORMWATER POLLUTION PREVENTION PLAN BY THE OPERATOR FOLLOWING ON-SITE LOCATION OF THE FACILITY. DUST CONTROL/OFF-SITE VEHICLE TRACKING DURING CONSTRUCTION, WATER TRUCKS SHOULD BE USED, AS NEEDED, BY EACH CONTRACTOR OR SUBCONTRACTOR TO REDUCE DUST. AFTER CONSTRUCTION, THE SITE SHOULD BE STABILIZED TO REDUCE DUST. CONSTRUCTION TRAFFIC SHOULD ENTER AND EXIT THE SITE AT A CONSTRUCTION ENTRANCE WITH A ROCK PAD OR EQUIVALENT DEVICE. THE PURPOSE OF THE ROCK PAD IS TO MINIMIZE THE AMOUNT OF SOIL AND MUD THAT IS TRACKED ONTO EXISTING STREETS. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED AT A FREQUENCY SUFFICIENT TO MINIMIZE OFFSITE IMPACTS. SANITARY / SEPTIC CONTRACTORS AND SUBCONTRACTORS MUST COMPLY WITH ALL STATE AND LOCAL SANITARY SEWER, PORTABLE TOILET, OR SEPTIC SYSTEM REGULATIONS. SANITARY FACILITIES SHALL BE PROVIDED AT THE SITE BY EACH CONTRACTOR OR SUBCONTRACTOR THROUGHOUT CONSTRUCTION ACTIVITIES. THE SANITARY FACILITIES SHOULD BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND BE SERVICED REGULARLY. ALL EXPENSES ASSOCIATED WITH PROVIDING SANITARY FACILITIES ARE THE RESPONSIBILITY OF THE CONTRACTORS AND SUBCONTRACTORS. THE LOCATION OF ANY SANITARY FACILITIES SHOULD BE INDICATED ON THE STORMWATER POLLUTION PREVENTION PLAN BY THE OPERATOR FOLLOWING ON-SITE LOCATION OF SAID FACILITIES. WATER SOURCE WATER USED TO ESTABLISH AND MAINTAIN GRASS, TO CONTROL DUST, AND FOR OTHER CONSTRUCTION PURPOSES MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE OR LOCAL HEALTH DEPARTMENT. EQUIPMENT FUELING AND STORAGE AREAS EQUIPMENT FUELING, MAINTENANCE, AND CLEANING SHOULD ONLY BE COMPLETED IN PROTECTED AREAS (I.E., BERMED AREA). LEAKING EQUIPMENT AND MAINTENANCE FLUIDS WILL BE COLLECTED AND NOT ALLOWED TO DISCHARGE ONTO SOIL WHERE THEY MAY BE WASHED AWAY DURING A RAIN EVENT. EQUIPMENT WASH DOWN (EXCEPT FOR WHEEL WASHES) SHOULD TAKE PLACE WITHIN AN AREA SURROUNDED BY A BERM. THE USE OF DETERGENTS IS PROHIBITED. HAZARDOUS MATERIAL STORAGE CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER TOXIC OR HAZARDOUS MATERIALS SHOULD BE STORED IN THEIR ORIGINAL CONTAINERS (IF ORIGINAL CONTAINER IS NOT RESEALABLE, STORE THE PRODUCTS IN CLEARLY LABELED, WATERPROOF CONTAINERS). EXCEPT DURING APPLICATION, THE CONTAINERS SHOULD BE KEPT IN TRUCKS OR IN BERMED AREAS WITHIN COVERED STORAGE FACILITIES. RUNOFF CONTAINING SUCH MATERIALS SHALL BE COLLECTED, REMOVED FROM THE SITE, AND DISPOSED OF IN ACCORDANCE WITH THE FEDERAL, STATE, AND LOCAL REGULATIONS. AS MAY BE REQUIRED BY FEDERAL, STATE, OR LOCAL REGULATIONS, THE CONTRACTOR SHOULD HAVE A HAZARDOUS MATERIALS MANAGEMENT PLAN AND/OR HAZARDOUS MATERIALS SPILL AND PREVENTION PROGRAM IN PLACE. A FOREMAN OR SUPERVISOR SHOULD BE DESIGNATED IN WRITING TO OVERSEE, ENFORCE, AND INSTRUCT CONSTRUCTION WORKERS ON PROPER HAZARDOUS MATERIALS STORAGE AND HANDLING PROCEDURES. THE LOCATION OF ANY HAZARDOUS MATERIAL STORAGE AREAS SHOULD BE INDICATED ON THE STORMWATER POLLUTION PREVENTION PLAN BY THE OPERATOR FOLLOWING ON-SITE LOCATION OF THE STORAGE AREAS. 14. CONTACT INFORMATION STORMWATER POLLUTION PREVENTION SITE CONTACT TO BE DETERMINED. POST CONSTRUCTION SWPPP 1. POTENTIAL POLLUTANT SOURCES POTENTIAL POLLUTANT SOURCE: PASSENGER VEHICLES, DELIVERY VEHICLES, TRUCKS, AND FUEL DELIVERY TRUCKS TYPE OF POLLUTANT: OIL, GASOLINE, DIESEL FUEL, ANY HYDROCARBON ASSOCIATED WITH VEHICULAR FUELS AND LUBRICANTS, GREASE, ANTIFREEZE, WINDSHIELD CLEANER SOLUTION, BRAKE FLUID, BRAKE DUST, RUBBER, GLASS, METAL AND PLASTIC FRAGMENTS, GRIT, ROAD DE-ICING MATERIALS POLLUTANT SOURCE: TRASH DUMPSTER TYPE OF POLLUTANT: CLEANING SOLUTIONS OR SOLVENTS, LITTER (PAPER, PLASTIC, GENERAL REFUSE ASSOCIATED WITH DISTRIBUTION OPERATIONS), UNEATEN FOOD PRODUCTS, BACTERIA POLLUTANT SOURCE: LAWN AND LANDSCAPE AREAS TYPE OF POLLUTANT: FERTILIZERS, SOIL, ORGANIC MATERIAL (LEAVES, MULCH, GRASS CLIPPINGS) THE ANTICIPATED POLLUTION SOURCES ARE THE VEHICLES THAT WILL USE THESE FUTURE FACILITIES, INCLUDING BOTH TRUCK AND PASSENGER VEHICLE TRAFFIC. POSSIBLE POLLUTANTS INCLUDE OIL, GASOLINE, ANTI-FREEZE AND OTHER POLLUTANTS ASSOCIATED WITH VEHICULAR TRAFFIC. 2. POST-CONSTRUCTION STORMWATER QUALITY MEASURES SEE #8 "PERMANENT STORMWATER QUALITY MEASURES" UNDER THE "SWPPP FOR CONSTRUCTION SITES" NOTES. 3. STORMWATER QUALITY IMPLEMENTATION STORMWATER DETENTION BASIN AND WATER QUALITY MECHANICAL UNITS WILL BE INSTALLED AS PART OF THE ARIA APARTMENT DEVELOPMENT TO THE WEST. SEE ARIA SITE DEVELOPMENT PLANS FOR IMPLEMENTATION SEQUENCE. CATCH BASINS ON SITE WILL BE CONSTRUCTED AFTER TEMPORARY SOIL EROSION CONTROL MEASURES ARE INSTALLED AND THE SITE HAS BEEN STRIPPED OF TOPSOIL. #7 IN THE "9. GENERAL CONSTRUCTION SEQUENCE", THIS SHEET. PERMANENT SEEDING / PLANTINGS WILL BE IMPLEMENTED AFTER ALL SITE IMPROVEMENTS HAVE BEEN CONSTRUCTED AND FINAL GRADING HAS TAKEN PLACE. #14 IN THE "9. GENERAL CONSTRUCTION SEQUENCE", THIS SHEET. 4. STORMWATER QUALITY MEASURES TO PRESERVE STREAMS OR RIPARIAN HABITATS THE PROPOSED SITE IS NOT ADJACENT TO NOR DOES IT IMPACT NEARBY STREAMS OR RIPARIAN HABITATS. 5. OPERATION AND MAINTENANCE MANUAL OFF-SITE POST-CONSTRUCTION STORMWATER DETENTION BASIN AND MECHANICAL WATER QUALITY UNITS WILL BE CONSTRUCTED AND MAINTAINED AS PART OF THE ARIA APARTMENT DEVELOPMENT. SEE ARIA DEVELOPMENT PLANS FOR OPERATION AND MAINTENANCE MANUAL. ON-SITE ON-SITE STORMWATER QUALITY MEASURES OPERATION AND MAINTENANCE INCLUDE CATCH BASINS WITH 2 FOOT SUMP AND PERMANENT SEEDING / PLANTINGS. DESCRIPTION: PERMANENT SEEDING / PLANTINGS IS THE FIRST LINE OF DEFENSE IN WATER QUALITY TREATMENT BY PREVENTING SEDIMENT RUNOFF INTO THE STORM SYSTEM AND FILTERING AND INFILTRATING STORMWATER RUNOFF. ON-SITE CATCH BASINS WITH SUMPS SERVE AS THE SECOND WATER QUALITY MEASURE PROVIDING SETTLING OF SEDIMENTS AND INITIAL CAPTURE OF OIL, TRASH, AND DEBRIS. CONTACT INFORMATION: THE OWNER OF THE ON-SITE BMP'S WILL BE THE PROPERTY OWNER. THE SITE OWNER IS RESPONSIBLE FOR ALL MAINTENANCE AND COSTS ASSOCIATED WITH THE ON-SITE BMPs. THE CITY OF CARMEL HAS THE RIGHT TO INSPECT AND MAINTAIN ON-SITE BMPs AS NECESSARY. MAINTENANCE: CATCH BASINS - INSPECT REGULARLY, REMOVE ACCUMULATED SEDIMENT, AND FLOATABLES AS NEEDED USING VACUUM TRUCK. PERMANENT SEEDING / PLANTINGS - A WARRANTY PERIOD OF ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION COVERS REPLACEMENT MATERIALS FOR LANDSCAPING. ALL PLANTINGS SHALL BE ALIVE AND WITHIN A HEALTHY VIGOROUS MANNER AT THE END OF THE WARRANTY PERIOD OR SHALL BE REPLACED WITHIN 10 DAYS. LAWN SHALL BE MOWED AT A HEIGHT OF NOT LESS THAN 2" TO INCREASE ROOT MASS. LAWN SHALL NOT BE FERTILIZED MORE THAN TWICE PER YEAR AND SHALL BE IMMEDIATELY WATERED INTO THE SOIL AFTER APPLICATION. SWPPP NOTES