Loading...
HomeMy WebLinkAboutC020.1_SITE_LAYOUT PROPOSED OFFICE 3,500 SF PROPOSED RESTAURANT 4,000 SF 24 9 1.70 ACRES X X X XXX WEST LINE SW 1/4 SEC 6, T17N, R3E HAMILTON COUNTY 78.69' TEMPORARY SITE BENCHMARK 2 W W W W 1"= SITE LAYOUT PLAN 30'030' TH I S D O C U M E N T H A S B E E N P R E P A R E D B Y P R O G R E S S I V E A E A S A N I N S T R U M E N T O F S E R V I C E , A N D P R O G R E S S I V E A E SH A L L R E T A I N A L L C O M M O N L A W , S T A T U T O R Y A N D O T H E R R E S E R V E D R I G H T S , I N C L U D I N G T H E C O P Y R I G H T T H E R E T O . ISSUANCES REVISIONS If this document is sealed and signed in a digital or electronic format and is received from someone other than the sealing professional identified in the document, you must contact the sealing professional in writing to validate authenticity of the document. The sealing professional disclaims the seal and signature and shall not be liable for any liability associated with it where the authenticity of any digital or electronic seal or signature has not been validated in this manner. NO.DATE DESCRIPTION 6/1 3 / 2 0 1 9 1 0 : 2 0 : 1 6 A M P:\ 7 0 0 5 0 0 1 2 \ W I P D R A W I N G S \ C 2 . 1 - S I T E L A Y O U T . d w g sh o r t j 18 1 1 4 M i l e R d N E G r a n d R a p i d s , M I 4 9 5 2 5 6 1 6 . 3 6 1 . 2 6 6 4 w w w . p r o g r e s s i v e a e . c o m DRAWN BY PROFESSIONAL PROJECT MANAGER FILE NUMBER CHECKED BY CH R I S T I A N B R O T H E R S A U T O M O T I V E PR O P O S E D S E R V I C E CE N T E R MI C H I G A N R O A D , C A R M E L , I N 70050012 JPM REVISED PLANS FOR REVIEW 06/13/2019 PROPOSED CHRISTIAN BROTHERS AUT O M O T I V E BLDG FOOTPRINT = 5,660 SFT 75' SETBAC K 5' LANDSCAPE BUFFER 10' 1 5 ' S E T B A C K COMPRESSOR AND DUMPSTER ENCLOSURE PROPOSED INTERNAL PARKING ACCESS ROAD M I C H I G A N R O A D ( U S - 4 2 1 ) R E D D R D . CONNECTION TO US-421 PUBLIC SIDEWALK REMAINING TREE LINE REMAINING TREE LINE PROPERTY LINE PROPERTY LINE 5' SIDEWALKLANDSCAPE ISLAND R5 ' 11 5 16 2 C2.1 SITE LAYOUT PLAN JRS 70050012 PAVEMENT LEGEND BITUMINOUS PAVEMENT CONCRETE SIDEWALK HEAVY DUTY CONCRETE APRON CALL 811 NOTE: www.CALL811.com CONTRACTOR TO CONTACT 811 SERVICE AT LEAST 3 WORKING DAYS PRIOR TO CONSTRUCTION, TO CONFIRM LOCATION OF EXISTING UTILITIES. DIAL 811. GENERAL SITE LAYOUT NOTES TRANSFORMER PAD ROAD ℄ 5' LANDSCAPE BUFFER BARRIER FREE PARKING R RL 1.ALL WORKMANSHIP AND MATERIALS SHALL BE ACCORDING TO THE CURRENT INDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 2.CONTACT "811" THREE (3) DAYS PRIOR TO THE START OF CONSTRUCTION, EXCLUDING SATURDAYS, SUNDAYS, AND HOLIDAYS. 3.NO DIMENSION MAY BE SCALED. REFER UNCLEAR ITEMS TO THE ENGINEER FOR INTERPRETATION. 4.DIMENSIONS SHOWN ARE TO FACE OF CURB UNLESS OTHERWISE NOTED AS B-B (BACK TO BACK) OR E-E (EDGE OF METAL TO EDGE OF METAL). 5.CONTRACTOR TO PAINT STRIPE ALL PARKING SPACES SHOWN. PAINT COLOR TO BE WHITE. BARRIER-FREE SPACES TO BE PAINTED BLUE. 6.UPON REQUEST, ELECTRONIC INFORMATION WILL BE PROVIDED FOR SITE LAYOUT PURPOSES. CONTRACTOR SHALL REQUEST ALL INFORMATION IN WRITING THROUGH PROGRESSIVE AE. LAYOUT OF ALL NEW CONSTRUCTION SHALL BE DONE BY A LICENSED SURVEYOR. 7.ALL CONCRETE JOINTS SHALL BE TOOLED PER SPECIFICATIONS. 8.CONTRACTOR MUST RESTORE AND REPAIR ANY EXISTING CONDITIONS DISTURBED BY CONSTRUCTION. THIS IS TO INCLUDE BURIED UTILITIES, LIGHTING, LANDSCAPING, SPRINKLING, ETC. 9.ANY AREA DISTURBED BY CONSTRUCTION TO BE RESTORED TO CONDITION EQUAL TO OR BETTER THAN BEFORE CONSTRUCTION BEGAN. 10.SIDEWALKS TO HAVE 2% MAX CROSS SLOPE AND 5% MAX SLOPE IN DIRECTION OF TRAVEL. 11.REDD ROAD AND PROPERTY TO THE NORTH OF CHRISTIAN BROTHERS SITE WILL BE DESIGNED BY CITYSCAPE RESIDENTIAL, LLC AND WOOLPERT AS PART OF THE OVERALL "MICHIGAN ROAD RETAIL DEVELOPMENT". APPROVED COMPACTED SUBBASE 6" GRANULAR FILL COMPACTED BASE 6" INDOT NO. 53 COMPACTED BASE APPROVED COMPACTED SUBBASE 4" CONCRETE 6" REINFORCED CONCRETE #4 BARS AT 24" OC, EW 4,000 PSI INDOT TACK COAT @ 0.15 GAL/SY 6" INDOT NO. 53 AGGREGATE BASE 1 1/2" (165 LB/SYD) INDOT TYPE 'B' HMA WEARING COURSE, 9.5 mm ON 2" (220 LB/SYD) INDOT TYPE 'B' HMA LEVELING COURSE, 19.0 mm ON INDOT SUBGRADE TREATMENT, TYPE 1B OR 1C ZONING AND LAND USE NOTESPAVING NOTES 1.PAVEMENT CONSTRUCTION TO BE PERFORMED IN ACCORDANCE WITH THE INDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 2.MINIMUM 28 DAY COMPRESSIVE STRENGTH SHALL BE 4,000 PSI FOR ALL EXTERIOR CONCRETE. SLUMP RANGE: 3 INCHES TO 5 INCHES AIR CONTENT: 5 PERCENT TO 8 PERCENT 3.PROVIDE SCORED CONTROL JOINTS AT 12 FEET MAXIMUM SPACING 4.JOINT LAYOUT SHALL FORM SQUARE PANELS. WHERE NOT PRACTICAL, RECTANGULAR PANELS MAY BE USED IF THE LONG DIMENSION IS NO MORE THAN 1.5 TIMES THE SHORT DIMENSION. 5.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 3 4 . 0 ' 9 . 7 ' PUBLIC ROADBITUMINOUS PAVEMENT 6" COMPACTED AGGREGATE #53 ON 1 1/2" (165 LB/SYD) INDOT TYPE 'B' HMA WEARING COURSE, 9.5 mm ON 3" (330 LB/SYD) INDOT TYPE 'B' HMA LEVELING COURSE, 25.0 mm ON INDOT SUBGRADE TREATMENT, TYPE 1B OR 1C 2" (220 LB/SYD) INDOT TYPE 'B' HMA INTERMEDIATE COURSE, 19.0 mm ON NOTE: APPLY INDOT TACK COAT @ 0.15 GAL/SY BETWEEN EACH HMA COURSE. REDD ROAD EXTENSION, BY WOOLPERT 24" ROLLED CURB AND GUTTER PROPOSED MONUMENT SIGN, OUTSIDE WM EASEMENT (2) INVERTED U BIKE RACKS R150 ' REDD ROAD EXTENSION, BY OTHERS 20' 4 2 . 0 ' 2 8 ' 2 0 ' LANDSCAPE ISLAND R 1 0 0 ' R30' B-B R7.2' B-B TYPICAL DIMENSIONS ON BOTH SIDE OF ROAD HEAVY DUTY CONC DRIVEWAY APPRON, 8" REINFORCED CONC WITH 6" AGG BASE 176' 150' DEAD END RUN 30' GREEN B E L T 25' 5 ' ALTERNATE SIDEWALK ALIGNMENT R2 . 7 ' R3' R5 ' R28'R28 ' 24" CURB AND GUTTER 6" CURB 2 0 ' 9' 2 7 . 1 ' ZONE DISTRICT:B-3, 421-OL ADJACENT ZONING:B-3, B-2, I-2, R-SF-3 PARCEL SIZE:1.23 ACRES (INCLUDES REDD ROAD EASEMENT) LOT COVERAGE:0.72 ACRES (58.5 %) PARCEL SIZE:1.08 ACRES (EXCLUDING REDD ROAD EASEMENT) LOT COVERAGE:0.60 ACRES (55.6 %) BUILDING FOOTPRINT:5,660 SFT 9 SERVICE BAYS OFFICE / LOBBY COMPRESSOR & DUMPSTER ENCLOSURES LAND USE:COMMERCIAL - AUTOMOTIVE REPAIR REQUIRED SETBACKS: FRONT: 30 FT MIN - 120 FT MAX SIDE: 15 FEET REAR: 15 FEET PARKING SETBACK 5 FEET PARKING REQUIRED: 18 SPACES 9 SERVICE BAYS X 1 SPACE REQUIRED PER SERVICE BAY PARKING PROVIDED: STANDARD (9'X20'): 32 BARRIER FREE: 2 TOTAL SPACES: 34 BIKE PARKING REQUIRED:2 BIKE PARKING PROVIDED: 2 CITY OF CARMEL COMMERCIAL DRIVE CONCRETE 6" INDOT NO. 53 COMPACTED BASE APPROVED COMPACTED SUBBASE 8" REINFORCED CONCRETE #4 BARS AT 24" OC, EW 4,000 PSI R R 2 8 ' B - B CONCEPT DEVELOPMENT PLAN, BY OTHERS R15 0 ' 56' 1' 5'6' 2' 14' 28' R 3 0 ' B - B 8 ' 5' 8'8'8' SIDEWALK IN PUBLIC ACCESS EASEMENT CONSTRUCTION LIMITS AC CONDENSER