Loading...
HomeMy WebLinkAboutStormwater Discharge CalculationsProject: Christian Brothers Auto - Carmel, IN Project # 70050012 Prepared By: JRS Subject: Stormwater Detention Basin Sizing Reviewed By: Date: Revised: Determination of Post-Development Peak Discharge from Site 10-year and 100-year Storm Events Rational Method Design Information: Site Information: Total Area of Proposed Development =1.23 Acres Impervious Area =0.73 Acre Pervious Area = 0.50 Impervious "C" Factor =0.90 Pervious "C" Factor =0.30 Weighted "C" Factor for Post-Development Area of Site =0.59 Storm Information: Time of Concentration = 8.00 Min 10-Year Storm Intensity (5-min) = 6.12 in/hr 100-year Storm Intensity (5-min) = 9.12 in/hr Peak Discharge Rates: 10-Year Peak Discharge = 4.47 cfs 100-Year Peak Discharge = 6.67 cfs * These rates represent the discharge from the Christian Brothers site. Restricted release to allowable rates will be accomplised from the detention basin on the Aria Development. May 30, 2019 P:\70050012\WIP DRAWINGS\Civil\Calcs\CBA Carmel - Master Storm.xlsm/STORM DISCHARGE 8/2/2019