Loading...
HomeMy WebLinkAboutAD100 - DEMOLITION PLAN6 5 4 3 2 1 E 5 a B. Contractor is responsible for protection of all existing surfaces, materials, and components to remain or be relocated. Damage to these resulting from performance of Work shall be repaired by Contractor to satisfaction of Owner and Architect at no additional expense to Owner. C. Contractor shall provide temporary dust protection as required to prevent construction debris and dust from migrating out of Project Area. Owner/Architect shall confirm all dust prevention measures/Iocations and shall determine changes to these measures. D. All existing equipment and fixtures shall remain property of Owner. All reusable items salvaged during demolition operations shall be retained for Owner's inspection. Only items so inspected and rejected by Owner shall be disposed. All other such items shall be turned over to Owner for disposition. E. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to receive new construction shall be Patched and repaired as required to dearly receive new work. F. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to remain exposed after completion of new const. shall be repaired and patched as required to receive new finishes. G. Owner will be responsible for removal/rearrangement of all existing loose furnishings during construction, unless noted otherwise. H. Refer to Mech./Elec. Drawings for additional patching and preparation work related to M.E.P. demolition items. I. Existing sleeves, holes, and other penetrations or new damage of existing building structure above grade exposed by demolition and removal of piping, appurtenances, equipment shall be patched and repaired as pad of the Work. Maintain fire ratings of all and adjacent construction affected. J. Cap all piping to remain or abandoned in accordance with requirements of authority having jurisdiction and in accordance with all local and state plumbing and health codes. Utilize only pre -manufactured and approved fittings to cap existing piping. K. Each Contractor is responsible for all demolition work required or noted for installation of new Work. Demolition may include associated distribution systems, appurtenances, equipment supporting controls, and miscellaneous supports, unless noted otherwise. L. Coordinate all demolition with Project sequencing as directed by General Contractor or Construction Manager. RELEASED FOR CONSTRUCTION REF TO FBI -BUILDERS DRAWINGS FOR ADDITIONAL INFORMATION DEMOLITION FLOOR PLAN NOTES # NOTE 1 REMOVE EXISTING WALL CONSTRUCTION TO LIMITS INDICATED. INCLUDING FINISHES, STUD PARTITIONS, WINDOWS, DOORS & FRAMES, FIXTURES, EQUIPMENT, SPECIALTIES, MECHANICAL, PLUMBING, ELECTRICAL & TELECOM WORKAND FINISHES. COORDINATE DEMO WITH NEW CONSTRUCTION. SEE STRUCTURAL & ARCHITECTURAL DRAWINGS FOR NEW CONSTRUCTION. 2 REMOVE EXISTING WINDOW IN EXISTING WALL TO REMAIN AND PREPARE OPENING FOR NEW WORK. REFER TO FLOOR PLANS FOR NEW WORK 3 REMOVE EXISTING DOOR, FRAME, & HARDWARE IN EXISTING WALL TO REMAIN AND PREPARE OPENING FOR NEW WORK. REFER TO FLOOR PLANS FOR NEW WORK. 4 REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY, INCLUDING SUPPORTS, HANGERS, ETC. 5 COORDINATE DEMOLITION OF EXISTING MECHANICAL EQUIPMENT WITH MECHANICAL DWGS. 8 COORDINATE DEMOLITION OF EXISTING ELECTRICAL EQUIPMENT WITH ELECTRICAL DWGS. T REMOVE EXISTING PLUMBING FIXTURES INDICATED, REF TO P-SERIES DWGS FOR ADDITIONAL INFO. 8 REMOVE EXISTING FIREPLACE AND ASSOCIATED FOUNDATION 9 REMOVE EXISTING CANOPY AND RAILING IN ITS ENTIRETY INCLUDING ASSOICATED FOUNDATIONS 10 REMOVE EXISTING INFILL WALL FRAMING, GLAZING, & FINISHES. EXISTING POSTS TO REMAIN. REFER TO CONSTRUCTION PLANS N 10 First Floor Demo Plan i/8" = 1'-0" I J E 10 C 191 13 SCHMIDT ASSOCIATES 415 Massachusetts Avenue Indianapolis, IN 46204 www.schmidt-arch.com Project No. 2018-106.CTC Project Date 03.22.2019 Produced JDRJDR NO. STATE OF S�TTTI/ 11111\\NHP" These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. 9919 Towne Road Carmel, IN 46032 N KEY PLAN Children's TherAplay ChildrensTher-Aplay ka. Renovation and New Construction DEMOLITION PLAN Subject to compliance with all regulations of State and meal Codes \ City of Carmel (} v\IIT�W \IatrN'atpAAf_ DATE: 10/30/19 5 0 3 2 1 AD100