B. Contractor is responsible for protection of all existing surfaces, materials, and components
to remain or be relocated. Damage to these resulting from performance of Work shall be
repaired by Contractor to satisfaction of Owner and Architect at no additional expense to
Owner.
C. Contractor shall provide temporary dust protection as required to prevent construction
debris and dust from migrating out of Project Area. Owner/Architect shall confirm all dust
prevention measures/Iocations and shall determine changes to these measures.
D. All existing equipment and fixtures shall remain property of Owner. All reusable items
salvaged during demolition operations shall be retained for Owner's inspection. Only items
so inspected and rejected by Owner shall be disposed. All other such items shall be turned
over to Owner for disposition.
E. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to
receive new construction shall be Patched and repaired as required to dearly receive new
work.
F. All existing surfaces located adjacent to, or exposed by demolition work and scheduled to
remain exposed after completion of new const. shall be repaired and patched as required
to receive new finishes.
G. Owner will be responsible for removal/rearrangement of all existing loose furnishings
during construction, unless noted otherwise.
H. Refer to Mech./Elec. Drawings for additional patching and preparation work related to
M.E.P. demolition items.
I. Existing sleeves, holes, and other penetrations or new damage of existing building
structure above grade exposed by demolition and removal of piping, appurtenances,
equipment shall be patched and repaired as pad of the Work. Maintain fire ratings of all
and adjacent construction affected.
J. Cap all piping to remain or abandoned in accordance with requirements of authority having
jurisdiction and in accordance with all local and state plumbing and health codes. Utilize
only pre -manufactured and approved fittings to cap existing piping.
K. Each Contractor is responsible for all demolition work required or noted for installation of
new Work. Demolition may include associated distribution systems, appurtenances,
equipment supporting controls, and miscellaneous supports, unless noted otherwise.
L. Coordinate all demolition with Project sequencing as directed by General Contractor or
Construction Manager.
RELEASED FOR CONSTRUCTION
REF TO FBI -BUILDERS
DRAWINGS FOR ADDITIONAL
INFORMATION
DEMOLITION FLOOR PLAN NOTES
#
NOTE
1
REMOVE EXISTING WALL CONSTRUCTION TO LIMITS INDICATED. INCLUDING
FINISHES, STUD PARTITIONS, WINDOWS, DOORS & FRAMES, FIXTURES, EQUIPMENT,
SPECIALTIES, MECHANICAL, PLUMBING, ELECTRICAL & TELECOM WORKAND
FINISHES. COORDINATE DEMO WITH NEW CONSTRUCTION. SEE STRUCTURAL &
ARCHITECTURAL DRAWINGS FOR NEW CONSTRUCTION.
2
REMOVE EXISTING WINDOW IN EXISTING WALL TO REMAIN AND PREPARE OPENING
FOR NEW WORK. REFER TO FLOOR PLANS FOR NEW WORK
3
REMOVE EXISTING DOOR, FRAME, & HARDWARE IN EXISTING WALL TO REMAIN AND
PREPARE OPENING FOR NEW WORK. REFER TO FLOOR PLANS FOR NEW WORK.
4
REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY, INCLUDING SUPPORTS,
HANGERS, ETC.
5
COORDINATE DEMOLITION OF EXISTING MECHANICAL EQUIPMENT WITH
MECHANICAL DWGS.
8
COORDINATE DEMOLITION OF EXISTING ELECTRICAL EQUIPMENT WITH ELECTRICAL
DWGS.
T
REMOVE EXISTING PLUMBING FIXTURES INDICATED, REF TO P-SERIES DWGS FOR
ADDITIONAL INFO.
8
REMOVE EXISTING FIREPLACE AND ASSOCIATED FOUNDATION
9
REMOVE EXISTING CANOPY AND RAILING IN ITS ENTIRETY INCLUDING ASSOICATED
FOUNDATIONS
10
REMOVE EXISTING INFILL WALL FRAMING, GLAZING, & FINISHES. EXISTING POSTS
TO REMAIN. REFER TO CONSTRUCTION PLANS
N
10 First Floor Demo Plan
i/8" = 1'-0"
I
J
E
10
C
191
13
SCHMIDT
ASSOCIATES
415 Massachusetts Avenue
Indianapolis, IN 46204
www.schmidt-arch.com
Project No. 2018-106.CTC
Project Date 03.22.2019
Produced JDRJDR
NO.
STATE OF
S�TTTI/ 11111\\NHP"
These Drawings and Specifications, and all copies
thereof are and shall remain the property and copyright
of the Architect. They shall be used only with respect to
this Project and are not to be used on any other Project
or Work without prior written permission from the
Architect.
9919 Towne Road
Carmel, IN 46032
N
KEY PLAN
Children's TherAplay
ChildrensTher-Aplay
ka.
Renovation and New
Construction
DEMOLITION PLAN
Subject to compliance with all regulations
of State and meal Codes
\ City of Carmel (}
v\IIT�W \IatrN'atpAAf_
DATE: 10/30/19
5
0
3
2
1
AD100