HomeMy WebLinkAboutAR100 - ROOF PLAN6 5 4 3
2 1
E
t
a
5
s�
RELEASED FOR CONSTRUCTION
OCIATIE:
Suhject to compliance with all regulations
of State and Local Codes
City of Carmel
10/30/19
General Roof Plan Notes
A. Roof penetrations and equipment shown shall not be considered all inclusive. coordinate
with Mechanical, Plumbing and Electrical Documents to confirm penetrations and
equipment locations. Flash all roof penetrations in accordance with roofing manufacturer's
recommendations. Provide crickets to allow for proper drainage around units.
ROOF PLAN NOTES
A
Note
1
EXISTING ROOF TO REMAIN
2
ISTEEL ROOFING -BY FBI BUILDINGS
3
1 CUPOLA -BY FBI BUILDINGS
N
J)
ROOF LEVEL 1
3132" =1.-0••
5 4 3 2 1
E
to
-im
-o
-10
SCHMIDT
ASSOCIATES
415 Massachusetts Avenue
Indianapolis, IN 46204
www.schmidt-arch.com
Project No. 2018-106.CTC
Project Date 03.22.2019
Produced JDRJDR
These Drawings and Specifications, and all copies
thereof are and shall remain the property and copyright
of the Architect. They shall be used only with respect to
this Project and are not to be used on any other Project
or Work without prior written permission from the
Architect.
9919 Towne Road
Carmel, IN 46032
N
KEY PLAN
Children's TherAplay
ChildrensTlier-Aplay
ka.
Renovation and New
Construction
ROOF PLAN
AR100