HomeMy WebLinkAboutC7-SWPPP -CIVILCARMEL STgi1B/ATER POLLUTION PREVENTION PUN NOTES
SWPPP FOR CONSTRUCTION LIE
1. Ia Digit Hydrolaga Unit Cede: 05120201090020
1 Nome of receninq waters: Croaked Creek
3. 10 year %st Cmslrucfmn Peak DixMrge = B eta
L Lmatims of specific points Where stormwoler of Imve the site:
Lormwaler WIII leave IN Site overland via storm sewer to rryaelalM swats, then storm sewer to Instal de
Suod ision Detention minas. Stormeater a wneted On the uth side of the Mona to the legal drain When
flows mum.
5_ Locations *here darmwmer may be directly dischi into ground At No maws locations on the site,
6. Ser sheet Cl for mils map. legend. description of each mil Type. The construction of the prmomd mtrty
does not compromise this Soil type *;in the use of impervious teraa. sal com of inlafbth of
londmommah and lawns, one gracing of the site 10 minimize Son erasion.
z Pmenlim polmont Sources assodowl will emotional activities:
Sit am sediment from Mated sots. leal mulch, anmumf sour such as leaking fuel or ail, broke Rod.
brake dust, grease, onGfreem. metals radio fragments, ro gent, m spill asands, construction trash am
debris. Ialilizers, items including WI Nit limited to cleaning agents chemicals. Pont, miscellaneous
c'mpommml malergls, toys and clolMng and animal waste, elevated storm runoff temperatures, add mid
estides and pothogen.
B. Temporary am Wmamni dormootr quality measures:
Temporary and Permanent Storm structure fillers and Moinlenonce Requirements
a. Inspect liters after each storm and promptly re any Sediment deposits to inure adequate storage
volume and now through copoob for the next rovi taking core not to undermine the structure.
It. Inspect pemahcally far deformation or damage from construction aclivaies and rest im ediale".
c. Aster the contributing drainage arm has Wen mablared, remove an temporary filters and replace with
prmonenl Fillers our notes and details M CIE Remove nebis am s imenl deposits, bring the disturbed
arm to grade and adequate I.
Sat Pence Maintenance Requirements
0. Nwomn Of the sill fell primimlly and ally era star event.
to If lence bbic fears, starts to ammo ase, w in becomes ineffective, replace The allmlm p any w p
portion idepow; y.
c. Remove thep fabca to budge when it reaches null the height of the fence at its lowest will or z
causing
care the mar to huge.
a. Take o amid undrmining the hence e, w clean0ul.
<. the The bed Contributing gaide a area has been stadlbea, rempv< IM1< IMat Om sediment aewYls, bring
IM1e disturbed arm In grade and sla4lirz it.
Temporary Sediment Trap Mainlennce Requirements
a. Inspect temporary sediment lima after eacn storm event am immesiae" repair any erosion and Owing
holes.
I. Remove mdime,t Men it not accompanied to one-half the design depth.
c. Reliance spillway gravel facing when clogged.
sl, Inspect vegetation and re -seed iI necessary,
A. Check the spibroy depth Mraaicdly to insure a minimum of 1.5 It. depth from the lowest Poo of the
settled embankment 10 highest pant of the spllway crawl am MI arty Iow areas to maintain dMired
Nil on.
1. Promptly replace any displaced nP-rap. mine careful that no stales in the spillway a e More design
Carl
g, Alter all disturbed arms have bent sloilizea, remove the structure and sediment, grade the site to blend
win odionsi Codes and stabrlbe it
Erosion Control Blanket (Surface Applied) Mdnlenome Requirements
a. During vegetative establishment. Inspect alter eacn slam event for any erosion Wide the Nankai.
G. If any moods) sums erosion. Pull back that Orion of the bbnM1 corning it. re-nM the Chad and
relay and ample the blanket.
c. Alter vegetative establishment check the treated are0 eeriWaally.
Temporary Gravel Construction Entrance Maintenance Requirements
a. Inspect entrance Rod and Sediment disposal area weekly and after Storm events Or heavy use.
te. Reshase as needed for thi inage and runoff control.
c. Topmms wile clean stone as needed.
ILL Immediately remove mud and sediment tracked or wamm onto zlrttb by brushing or sweeping. Flushing
should only be used if the water iz nveied into a sediment Trap or basin.
A. Repair any broken road pavement emmeamtely.
9. Sequence downing Mormi quality measure implementation:
o, Inspect and maintain all Consul control m as detailed in the Slormoder Pollution
Prevention Mel Morrie once Requirementmeasures
immedialNy alter inlallotion am continuing unlit
vegelation has Wen sufficiently established and all construction adrvily is complete.
n. Remove al io iduol inlet protection am filters, silt felt" alt. Only often metal and sufficient vegetation
growth has Wen olodiznea in each onto to a Ford where xaimMi/pdlutads will not enter the drainage
or storm sewer system.
c. inspection and m inlenance OI a right-of-way and Infrastructure improvements 'Ine
resWib Snyy of the owner/develops orInfrastructuren designee until improer is are accented fur mamenance by
owners Or Pool Ogencies.
d. I spectian and maintenance of private property is the responsibility 01 the Wilde, a, his dmigse until the
owner accepts fewonzbimy for the imiviaual long Of mid.
e. Contractor to inspect all erosion control measures weekly and/or lolbwing any precipitation event exceeding
0.5' unl'a the project is completely Rnisned.
PRECONSTRUCTaN ACTMmES
a, Coll the Imiono Underground Rant Prolmleon Systems, Inc, (lldry Makii at 1-11W-082-5544 to check
the location of any existing ulililies. Ina Should W notified Iwo wonting days before construction taken
dace.
on M orange construction fence shall W constructed Olmg the perimeter of any tree preservation areas Prior
to ON earth mating.
c. A sin fence SWn W Installed at the edges of the project site where there is potent at for any stormwmer
runoff. Potential maps are idemaied WSeO on existing taq meshy. Prated imd pomtrees and osscomed
zMes root . Evaluate Sitting vegetation suitable for u filler sloe.
d. Maenlain a 5-10- minimum gram filter strip along the Northern. Eolern, Southern and Western boundaries.
e, A construction entrance shall W paced per The plan location.
V Establish construction staging arm for equipment and "hides as far from detention Trends and s*ales as
KMiwe,
g. Estchilsn male Imalion for owns/apralor/contractor placement of opprmva plans and Rule 5 NJI and
Rule 5 inspection documentation
PRLVENT SILTATION OF GUTTERS. STORM SEWERS. AND UNDER GROUND DETENTION VAULT:
0. Control to ev sae condition of disturbed a, and prep with sat fence (see Ca).
bmn, Lbinle, of vegetation along the properly es s c permconstruction its.
c InsPn temporarysMiment grads in all storm structures
Ill Install permanent segment traps in all storm structures immediately after intalbian of ""ment.
CONSTRUCTION ACIMTIES:
a. Once erosion and sediment control measures
one in piece.Wgm kind clearing followed immediately by
rougn ding. M vem
granot Iod
ine hires areas unprotected for than 15 days. Rule 5 rmafM that all
disturbed ardes TINE Fetenaitly Will W idle for 15 days or more will be slobilized (seeded, mulches, etc.)
immediately.
on After completion of mass grading, final grade, and seed prod banks, lamuape Mms, common areas am
wales Immediately alter growing is completed.
c Upon completion of mass grading, Install sanitary and storm seems. As storm mns
catmcled.
install inlet pWlectbn m Install rirap upon completion of ens section instanlullan.
of Install buildings and foundauans and temporary seen oil disturbed areas.
A. Once Inlet protection is ,n oboe, final grade all arms Upon completion of all grading, verity 70% ground
cover and resell as needed.
10. Local of promised mil StmkpiNs, berm* and/or dap l or
Au e m twedl and tumours not needed ran the instandiaw ofinfrastrucwe. buildings. Movement. etc. MI
W housed on this site and disposed of in compliance with local and state slopeords and Formal fa
disturbed drops.
11. See notes am details M shttl C5 for temporary am Wen nM t surface slaGnazanon, mulching am seeding
for each sea See onion Control Ran sheet cA for Iwotion5 of various slmmwatr Congo, measures and
SWM CA & C5 construction details and msihdcalions.
12. Erosion as Sediment contra sM.ficotims fur individual Smile Does not apply to this project.
13. Material nanadng, storage, am spill prevention plan:
A PURPOSE
The inlentn of the Stuff Pevenfion, Control and Countermeasures (SPCC) is to establish the Fragments
and equipment required 10 prevent The discharge of oil and hazardous Subtleness in quantities that
violate applicable "ter quality storl cause a shaven own or discoloration of the rtace of novdwble
waters or adjoining shorelines. or se slu
dge eem
or emulsto W w
ion defendant Wroth the surface Of the
water of oejoning shorelines. The Man ago estaaann the octill required to mail Such discharges
(;.a. countermeasures) should ther occur.
Cetnion:
Pollutant means wumant Of any Ill or in any farm, including but not limited to Sediment. mint.
cleaning agents, concrete washout, pestbes, nutrients, trash, hydraulic fluids. IWI, or Petroleum, fuel oil.
sludge, of refuse, am at mixed *;in wslm other than dredged ail.
nimnargat Includes hot is MI limited to, Any $piling, leaking, Pumping, powmad emilRng, ernomak ar
dumping.
Navigable Walrs- Means all "tors of the Vniled Slates that err margins slr, lake, or (Note
' mmoff
dry wash or storm *e,,
RELEASED FOR CONSTRUCTION
Subject to compliance with allre regulations amendnedd.I�e nhee awhenever there
I 0 9 materially onects the
of State and Local Codes
City
OF Carrell �/\��
TVII��VI�D*VASOMt_
DATE: \ 10/30/19
Prediction OI Polen4al Spills:
I. Nearest Navigable Wales (White am)
1 Coil System: NI storm Oraroge Moues the Site by cbsea storm Systems to the Oelenfmn pond on the
Wen aide of the site.
1 Possible Sam Sources (during and past construction): VeNdulm saurcm such as leaking fuel or oil, brake
fluid, grease, antUreeze; coslru tivn trash and debris, biological agents found in trash and debris, lerlifzen.
household items including but not Ellipsoid to cleaning agents. Chem}ab, point, herbicides and peslicides,
e. Groundwater Condemnation:
I" facility maintains NO come groom or unMground storage tanks at this Site. Inereforn it is fell that
1Mre is little ar era Possibility of past construction groundwater conlamirlalirl The facility dims ham City
of fgrmel sanitary sewer and water srnce.
B. PREVENTION AND READINESS
I. The contractor of responsible early wan prepare a contact list in the event OI a oral on The Site. The
contact list w and contact numbers. The contact list will $Melily first rest Afar$ Ono 0 cM1M
of command. Include names
otion on *not circumstances require the knit tan of the contact list and Clain
of command.
1 IN contmclar/owner sbell mamtalc o list of credited contractors, vac -bucks, tank pumpers and other
equipment or businesses applied to do clean-up operation- AnewheT materials and supplies need to be
available onsne in Sufficient quantities to rearms minor spills. An employees need to be edmoted on the
Proper application of the pbmment moterals.
3. at moidmance and equipment operators must be awaream trained for Prevention Of seals. A cant owing
education program is required for newemployees andeptsinq the importance to all employees
e. At materials used in the count a a cleanup nu be disPoma in a mane appoved try Indiana Department
of Enar nmental Management.
5. Using water to flush spilled matwal *ill not be permitted unless combined by a state, feaeml, or Into,
agency or person in authority. Taros can be unit to cam spiced material during man Meats.
C, SRLL RESPONSE
MINOR - Small sp,lls that ty ally indve oil WO line, paint, hydraulic Rod etc. Minor sales can the controlled
by the first responder at the discovery of the si
1. Certain spill to prevent maternal from enteing storm or ground water. DO not flush with water or buy.
2. use absaroenl molral to clean-up Spill Ora ial ore arty submqumtly mnmminmed was and aismse of
Properly,
SEMI-SIGNIPIMT SPILLS - Apprmimotely ten gallons or fen of pollulanl with rap contamination of ground or
surface water& Mina sells con be generally controlled by the first minimal with help from other site
Personnel. The rmpmm may rmuae other operations to slap to make no the spill is quickly and safely
Wdfss . At the time of dismmry of the spill:
L Curtain spill to present mateial from entering storm or ground Water. De not flush *ill Water or boy.
2. use abmdlent mateal to churn -up spills and dispose of properly. Sells on imoerviol surfaces should W
contained With a dry obserbent. Swz on clayey was mould W contained by constructing on earthen dike
and should W disposed of as as Possible 10 prevent mgrotim deeper Into the mil and groundwater.
Disease of contaminated was a, aeSorsernts prate .
1 Cmlad 911 if This spill could be a Safety issue.
e. Coll supenimrs and designated InspectorsImmediately
5. Contaminated mfas to W removed to an approved All
"OR OR HAZARDOUS SPILLS - More that, ten gallons. ]here is The Potential for death. injury Or illness to
humons or mists or has the Rolmliol for surface or ground"wer "Ivtion.
L Control or contain the seal odhoul risking bmily harm. Informs ly plug storm Brans it Possible to prevent
migration at the spill into The zlarmealer "stem.
2. Immediately contact the lime Fire Department at 911 10 report any nazma maleriol will.
1 Contact supenimrs and designated Inspectors dmmedotefy. other county or municipal officials (list as
nmded) responsible for storm water (affiliate should he contacted as sett. The cogoucror is responsible for
having Ihne contact numbers avaibae at IM1e job Site. A written mmrt shoal W submatea to The owner
a$ son as Possible.
A. As froon as Feasible but within 2 hours of discovery, cmlal the C rtmenl of Environmental Management.
Office of Emergency Response I-M-233-2745. The following inlormol should be noted for future
reports to IMM Or the National Response Center.
1. Name, coldness and phone number of serson moking the spill report
2. The Ixalion of Ibe will
1 The lame of the spill
a. menlmcatn of the spilled substance
5. Appmvimate quantity Of the suWtance that has been spilled or may W further spilled
6. The dum40n and ourCa Of the spill
Nam
e me and waalion at lhe domoged milers
ALOILM1,fML STORMWATER POLLUTION PREVENTION MEASURES:
VEHICLE or EQUIPMENT MMNTENANCE
Description and Puryse
Prevent or reduce the contamination of Storm utter resulting from "fide aril equipment maintenane by running
a "dry and clean site. The Wsl option *out be to perform mainleonce aclevilles at on ollsile facility. If this
option is not am,bae Ines work should be performed in designated ordesonly, *has provm iainq cover for oteriols
stored outside, cnmking for leaks and mills, and conloiang and clearing up Sighs immediately.
Suitable Applications
These procedures are suitable an all construction proper s *hoe an wrsile pro area Is scesmry for storage and
mainenance of nmvy equipment and venides.
Umilalims
onsne vehicle and muipTent moinumonce mould only W used when d is imoraamal to send vehicles and
eruipmenl ollsile for maintenance and repair Sending vehicles/muipnenl ollsile sill W done in conjunction
with a Stabilized Construction Enlrance/ExiL Ouldmr vehicle or equipment maintenance is a potentially Significant
source of nameoter beluta Activities that con contaminate storm rater include engine repair and mi
changing or regacemenl of Plums, and ouldaa equipment storage and parking (fluid Wks).
Implementation
If mo;ntenonce must occuronsile, on dmgnoled arms, IpSpill awy frown drainage courses. DNicalee
mainenance ar s snouwbe proledM from stormoter Nome am runoff. am shuts be locatea at least 50 Ittt
from downstream dminoge Faagf and watercourses.
06p Mom a onswnenl "dos sold W used dining made am equipment mOimMane work that imovm fluids.
men the maintenance work is perlomed aver an imprmmnle wdne in a dedictted mc,tmana arm.
Place a stmkpele of spill cleanup materials mere it will be reaauy accessible.
MI IuNing trucks and IuNing arms are nquked to hove spill kits and/ow use Other span prolecleon denies,
Use obmmem mdemb on small spills. Remoe the Woomera motamis orompily am aapoFe of properly
Inspect ooae vehicles and equipment daily at station for leaks and span amedPlely.
Keep vehicles and equipment clean; do not allow excessive build-up of oil and grease.
Sentence and recycle wastes, such as greases, used oil Or oil milers, onldfreeze, clmnina mlutil belleries.
hydrol and Iransmhsion IINds. Provide sou ndary containment am corm for them materials dl stored poste.
Train emplytts and subcommdors an proper mamtmance and spill ddenuo prmMures.
Dro pas or plastic sheeting shol te placed unner all vMicles and equipment dined On docks. Wrgers, a
other structures am water banes when the vehicle or edupmem Iz nfomed to W .die for mare than I lout.
Properly aRFeFe of used oils, fluids, luaiconis and span ctowp Onderals.
On not pace used al in a dumpster Or pour Testy a storm drain or watercourse.
Properly crisp M of or recycle used beueries.
DO not Wry sM tires.
Repoir leaks of IWbs and ail immediately,
urtea below w further information it you must Wfam vehicle or equipment mdmeomnce osne.
Insp him and Momencnce
Inspect aril may that MN ore in place Prior to The cam emend OI onocioleo o unties. Mae activities
Wal led with the MR are under Way, ioWl w ly to roily continued BMP dmdemenlalim.
KCCp omae mppnm of spill cldenup motemis onote.
Maintain waste fluid containers in leak proof cmditan.
Venbfos am equipment snauel W inspmtea on each soy of use, Leaks should be rewnM immMidely or the
problem vevale(s) or equipment sWuld W Alloed team the project site.
lnsMt mapmenl for damaged noses and Inky gaskets routinely. Repay or replace as needed.
VEHICLE AND EQUIPMENT FUELING
Descriaan and purpose
well equipment fueling ponedures and patinas are assigned to prevent IWI spills and leaks, am reduce or
elimimle contamination of slmmealet. This can W ocmmpaMed by using ollsile Imisties, fueling in designated
areas all`, a Orel a, covering stared fuel, implementing spill controls, and training employes end
subeanlra lore in proper IuNing procedures.
umnotions
onsile vehicle and equipment fueling should ally be used Mae it is imOtclkOl to "M vehicles and equipment
ollsile Ir IuNing. Sending micles and equipment ollsile s W mine n cmlunctm *an a SlabiliM
Construction Enlronce/Eel.
ImOlementot on
Use ollvle fueling $10ties " Much as possible. Them businesses are Water equipped to handle fuel and sells
properly Performing this Vark off ile cat so bcfar wC e scommal by examination the need Ito Fueling am al
a she. Discourage iIwdng-oW of fuel lams.
AMorbenl Spill cleanup molerbls and will kits should the ovoilable in fueling areas am M Fouling trucks. and
should M disposed of proWly alter use. Cin Pans or abswsnl pans should be used during vehicle and
equipment Fueling, unless the tuna g he performed over on impermeble surface in a dedicated fueling arm.
Use obsabenl materials on small Spills. Do lot hree down or bury the Will. Remove the obmr"nl molests
promptly and dispose of pray.
Avoid motile fueling of mount caeslrvclion equipment around the was; rather, transport the equipment to
designated fueling arms,
Turin employees am subcontractors in Proper fueling and cleanup procedures.
Oedloctea fueling arms should be protected from stormviter Whom am runoff, and should be located at forest 50
ft away from downstream draimge lacililies and "tvcoursm. Fueling must M performed an level -grade arms.
Protect baling areas with berms and dikes to prevent Whoa runoff. and to Camara wills.
Nozzles used in vehbfes and equipment fueling snout W "uipp *;in an wtornal mutoff to control drips,
Fueling awmtns shouid not Me left unattended.
Inspection and Maintenance
Vehicles and equipment should be inpecled Cash day of use for leaks. Leaks should he awned immediate" or
problem vehicles or equipment should be removed from the project site.
Keep omple zupWin OF spill cleanup maleiaa finite,
Immediately cfoon up spills and Properly dispose of conlaminoled soil and cleanup materials.
SOLID WASTE MANAGEMENT
Description am Purpose
Solid waste management procedures and practices are designed to prevent of reduce the dizcnarge OI pollutants
to zlarenwale from solid or construction waste by provid n 5 designated waste collection areas and containers.
arranging fairregulor disposal, and training employees and ubconlroclas.
Sul Applications
Inns NP is zufable for construction sites where the Idlowing wastes are generated Or scored:
I. Said waste generated from trees and shrubs rem ked during land clearing, demdiUon of nistmal structures
(Nobble), and bull construction.
2. Packaging materials including wino, power and Nil
3. Scrap a, surplus towiding materials including wrap metals, rubber, plastic, glass pieces and mammy Products.
e. Domestic wastes including font containers such as hemrage cons, coffee cups. Roper begs, Poll *rappers,
and cigarettes.
5. Construction wastes iadming mink, mortar, timbr, steel and metal scraps. Else and eleclraal culling;
non -hazardous equipment ports, myralaam and other materials. Immmorl and package construction materials.
Implementation
I" fallowing stops will "to keep a clean site and reduce narmwter will
Selnl designated waste collection areas mass,
lidwan trash -Fouling contractors that You will accept rely mlMigM dumpsas for point um,
Inspect dumwters for looks and contact the trash hauling contractor to repair any dumpstr that is not
"initial
Provide onOr
adequate number of containers with lids covers that can W placed over the container to keep ,o
out a, topreuenl bra al wastes Men it is windy,
Plan for adanbnol emminers and more frequent pickup during the demdnion phase of construction.
Collect site Irani daily, especially ruling rainy am windy conditions.
Remove this Solid wmle promptly once erosion and Sediment control dmim lend to collect Idle.
Make sure that task Ill wastes (used oils, solvents. and paints) and chemicals fates, pest ides, addSres,
curling compounds) am not disposed of In dumwmrs designated for construction details.
0o rat M1se out Compute an the construction site. Lmm cempsler cleaning to IW bash hauling contractor
plaits.
Arrange for regular Waste collection belae contains Overflow.
Clean up immediately if a container don stall.
More sure that construction waste z collected, removed, and disposed of only at oulhoi disposal arms.
Collection storage and diwosd
Lnterinq on the project site should W proinited.
10 prevent clogging OI the storm drainage system, itler and dWra narrowed From droioge grates. trash rams and
mach lines mould W 0 priority,
Iran receplocles should he Provided and located y The general conlrwlw and instruct all Personnel on site to
properly ase the appropriate trash receplocle.
Litter from walk armt within the construction limits OI the pool site should W colleted and placed in
watertight dumpolers at least wekly regardless of whether the Ill was generated by the contractor, the Public.
or others. ColeciM lilln and debris mmP lot be placed in or next to drain inlets slwmwter drainage systems.
or watercourses.
Oumpslers of sufficient sin and number should me provided to contain the solid wale generalM by the project.
Full Compstrs snaula he remover from the project site and the contents mould be disposed of by the trash
hauling control
Construction debt and waste should W removed from the site biweekly of more frequently as needed.
Slormwoler runoff Should W prevented from Widening stored who waste through the use OI hams, digs, Or
other temporary diversion structures Or through the use of measures in eleeate waste from site surfaces.
Sam Wayne storage metal should he Intel at least NO ft. from drainage Includes am waterco
urses am should
not be located in areas to flooding or Pending.
Inspection and Mainlennce
Inspect and verily that adivily Wool BMPs ore in once prior to the commencement of oMmiotO atl,vifrcs While
activities Orsacgted WIm the BMP are under Ay, ,nest ormy to verify continued BMP implemmlolWn.
Inspect BMN subject to non -dorm ncter discharge daily white on-slormwaler discharges occur.
Inspect construction waste area regularly.
Arrange far regular Waste collection.
CONCRETE WASHOUT
Tne following Steps Will help reduce slormoler pollution From caRrele Wastes:
Discuss the concrete management techniques in this BMP (sun a hamling of Col le Waste am washout) with
the rm-mir y. nconeteupoli ser befae any regionals wmade.
mad
Incoroale requirements Far concrete wale maogemenl into material supplier am subcontractor agreements.
Store dry and wet materials Wy from draoge arms.
Avon mining excess amounts DI Fresh concrete.
Perform washout of concrete trucks ollsile Or an deiglool areas only
DO Nit wpsnoul concrete trucks into storm dram, open ditches. sheets or streams.
Do rat allow eacn$ concrete to W dumped onsile, a ept in deigmled ww&
For onte "snout
- L«me washout mid at least 5O lest from storm drains, open let or was boaiw.
- Co not once non From this anon aauger y conslrusting a temporary pit or formed area large for liquid and
n acid ete
- Wash out wastes into the temporary pit where the concrete can set, be broken up, am then disposed of
properly.
- Avoid creotg runoff by draining water to a formed or level arm *hen washing concrete to remove fine
Wticlm am eswse the aggregate.
- Co not wash sweepings from exposed aggregate concrete into the slreel or storm drain. Cdled and return
neepings to axgregale EOm identical or disease in the trash.
- Use durnoter from a licensed refuse hauler am implement her detail on sheet Ci2.
IA. See enter Neel and Erasion Conlral sheet U For contact inlamatn For inumidWl responsible For slwmw0le
pollution oreven ire,
15. See latest Tents mnslrvdion Oacumml$ ON BMP Owners Deerafan and Moinlenonce MMwi.
1. Description Of potenwl poll sources associated with the c mmuctn activities: Silt and Sediment from
expand m v cuwwcI
a
r leaking loaf an , brake hold. brake dust, trash, debris.
biological agents found in trash ^'fertilizers e Oniders.pesticides. acid ram, lime dust, and concrete washout.
2. Post mnstmc6c, slamwate, qualpy, measures,
a. This sites stormwater is disMargm to on on site rem garden am on-line SWVU BMP on Ine East side of the
properly, HSD the underground detention vaults which ore connected to each of the proposed storm structures
will prone aWitbnal stamwater quality Irmtment for structure 4-I6.
b, The size
pe s and shaof underground delention vaults is bed On anWacturer recommendations and stele
condifons. See the Stamatoh deegn requirements and cal on sheet C5.3.
c. Additionally. sea the SWOU CM2015-4 notes and details an Meo Ci3.
a. See the aemaM canteen mainland a, and maineonce guidelines in the Owners ITMP Operatic, and
Maintenance monml.
3. Sequence describing norm"ter quality measure implementation
to Intent[ and maintain all a control lea as detailed in the smrmeater Pollution
Prercntion Measures Maintenance Requirements Mgni immediiotely alter installlion and continuing until
v tat,on has soeen sufficiently mmhsnm and o mdian adh
ry is complete.
an Remove al imivet p iduol into catch all Mrua
liters, coconut mots, sill Ter etc, only after seeding am
saw icienl vegetation growth has been established In each
m to a Point x me sedint/mllulonls *al not enter
the dmina9e of Storm Fewer system_ Fail Storm water inlels. replace temporary cmffiuction fillers Kiln
Permanent Finslarm inlet filler.
c Inspection and ma,n[ennce of all errmr r,ght-of-way and infrastructure improvements is the responsibility
of the o ne,/d"emper a, his resignee,,[it improvements are occedW for moimenanae by o nert or tact
ogees
d. Inspection and maintenance of private properly is the responsibility of [ere builder or his design" until the
owner accepts instal lily Iw the indivbud tract of kind once construction has bent approved as Substantially
complete.
G ControClw to ,nspm[ all er control measures weekly and/or foliching any precip'lalim Control
ct
OS' until the Project is completefinished.
e. St ram to audtly measures to be imlMementea to minimize Covers immcts to flail What
o. COS 2015-4 Mantenanne Guidennes: See MP 0 Al M Manual
b. Owner 10 implement a spill prevention guideline fair all employees and customers 10 comp" *;in on site.
c Owner to mdntain oil melaleo overs on the site (i.e. cutting grass, watering shrubs and trees, irrgalim
systems, cleaning Woody vegetation debris, etc.
d. Owner to maintain rain golden per notes and details Pn Sh"l L2 and information in BMP 0 & M Mormol
5. Owner to comply *;In BLAP Owners and Operatn Manuel gar East-Central zlormwaler quality measures.
Cly of Carts fa Curb At Ib 11 .'ll06
1) Craa
A) M wk aL}xl W Ne reair $ d this wiry "I include 11e pmrcM rolirq/Miwy, rcor tint ter, desire.
NdUm prong curing. fiN % and aria oak Iwx®ay to aurae murmioe wit sit MVgr imaall angst
b.ffi oa imam cocrne eANng thin Maly wither ON muse RNIs Of the city of Conmt wit e.iziig or am e
rigrh-0-Ky.
B) m'ng why EMI W ve toe [a a:Crymv d the eak by IW Cly. Feature to rare to IN regs,to An A of Ms win
ony rs/t in rim-av Of Ve r a den ram'a Mtn y in that pd'y.
C) Wrmunt mwWwr and gtolr Of the walk m W sto mdam to f 2N6 Land Spolo Wa6 Of The haws
D.piN On orthodontist (h Wte rearm to as 9aaoa 5oxifipaiaaC eemt Mae a aios ere dk or
Ifical nereh On woaces oe grMed
D) Wye the admen g & of any, dwn gar W army losing ayeatm jurWl seem them Stpr the
ro)r slamds whal mdy
E) 1f ry For, or den We or y fWl an The g w& tw ovsrrr s ett Ire mrnvn stamp Of this
wq. IN Irdc game sal with.
F) WON camolrl Iran "II N conmced an ali al see msal oil axtneaw Of irrrmrnts hiving ^den
gamin m an wcNNN Milian to remote m 6N Won for meal fa dtmtkes wan con be
aµwgM by allonoa m answer prep ore Wa by den a wish mnaamt jurisdiction
Gy At pk Me cooly win IN rmurmr{s of scum IMM of Ne &m Sc®IcwawA
H) Fr Ire press of sea win. wMe the term Dg'neo as Isb in this pain and IN Loma yormlos, a men
mym
i) Re Canty City Drainage, AM of IM 0.yMmall Of &c're g den Wsael erdyed by The Cly d WrW, a
loIWgM agrps) 1M may, me Imes to mmew the city of Comm.
67 The Mdllm Caner Koh" Ega, Staff of IW I tm Counter Ngt" DmMnml, down pemrN m by
rodtm county, or WWro gm(s) that my be ado to Wen Monet Wray Hoh .. do, N an the
Maim Of ere work.
I) Mt ,ty it IN Egan am IN task gml we al satin fool d The Sword :pntinlian
t) Prior to as a the wok Are fmmcta Wformng the wok "I dam IN EgKa to orate a
aeawlrnMn m ayirg 10 re'ra IN Charter s m to rQira % gal W&Gm ayrrrall& ar'm
kkpclals fa Loon gage of the wpm brow to fedee IN mwity of the Rgta Or it Imes to the wk
K) Ikea no uewntaee "II *rn abjecl 10 ft Stamm WWig by this wiry camrce *'Red Wowng rsyrpl
ca&M dsiap by The Cly of Cont Rm'bml of freshets
L) M Ine she osaNM d The EN . IN Miss d IHs ok rmttl to Indigenous end penal of M sbaY to The
rzgiremts Of this wig mode a the ,,Or -a-" sal N WMdm at the pre -maw m %
M) Rraeaa rat than dordes fa Coate Curb "I be in as with the Ott Of Were' Remand Deal
NO Ilea m drmrslaees sal rstaio oIM than PMba Wreh Wade moving IM Nrmm WWis by his of
be dent to arscral concrete cam Men the mode lint of IN Gar of CanN.
O) Mm no complexes "I Mntlm mass curb he iWdW wAhn Tne mode Ill of Ne City d CmrN.
2) Formes
A) faro
c) INS
ma "Iseccolors
ol a the casmnibr/aewdim d IN fawmow n oamest Mn ado, 11nm d the
s) TN fxaman sal be WM in CramW Mn titian SUSOXo) of the soma S ffk s oil the
agwasrves OF Ihs paky.
W) Gmatia one Gr gmn l
q on, to bgllue mpwC , oil mWarra adios al masoy doing grlmng, mane rat lid Neipang
aM abzryuml wntlanng fa fn items wlhin IN awe Now limas sal be W[aod in ¢cadxe with Section
N1.03 are 201,04 Of me Aamd Spa:Nmir¢ At tc ll. vegetation. reds, flurry, trot and Wnaibla rMei s
"II N cmdNy, re mead Allen Ibe Small Of IN Was eta¢
kl Esmdan
(1) Alto Wes tea slot all spongy oil felts noes that Me not nosy cwmxt "I be rased Nam
within The give Store I'mM ro The r®t4ng was Me be NiIM wet mtoe mil tho cmmtM in
amides with Smfan xit of Ire soma Sp ftm
(2) Ay Mundt dW® *ten the ware gam Iildts fur t;N after amaim adios gal fo rallied with
sable moan not camMM In darmre *In scb'on 200 of the saaad'ymficill
gi) Emmsnr u
(1) DroaWwmN Y be m WM en aarmce Mn Sxtion 2m of the soma Saccharins,
(2) At mom ma facing ram d that drat not Immy camas "I W mama from Men IN sage time Into
pour to erwil 0A anal
(3) AN prrl4d dmPsaS within the oil stake firms fB tiN after aL9 % gddng, aadry and Icglil
read and W MAM with isotope Mo d ro camxlM In oxen with Sleon at Or IN 9th d
Scnaicdias prior to mMkmsnl yaaba l
(A) Prior to the m rxim of ay install wanf, the rglm grand surfs within the Ndt a the give Baas Yea
N IagM and Ve wcW 6-inNs thrall N norma led In rcamce who `Seta M of me La do
speolongtoe
(5) EmnsM is "I W Y to W well been rat "I W p MW to pen eoaw
(6) Loose clah Of maw Mevwmw IN, film ea M wan. ewralmon name rat as ion rwanmds "II
be in nmmm *in Sxuw 2D5 Of the Slomd yO[oairl
C) sin SbwM
I) SbgrCae gal W dmaalM on kwandow assessed in aarmlm wire anion 2(q as stow ago Me this policy
and ry dam the kadUm Of at umnce rat amurfa don ndcdM an the argil man Mcmrls
to W lama ase the Earmra One cat Torn b ;I;N oak of these Mamas gal be an aarmm
with the City of Cont Trevor Scrol ing spmflM
I) ON s bgrme Ya he A to the req>M grata as outs, finite from of rd& cwmgatos, a awn
annual
iii) the v[ gal N mfermy Pram, c kw rat OWa in amMce *in Sections ID202. MGM that
A]IM a IN Standard keci alien .
n) S,gehs sea be impxted ao aWaee by the Egnes, More coy apegee ids or comae Lobs one
catch red, A aanfml sou N caaaled in WCmc a won Srliof 2w26 of the 9aard yxifkmoa
Unacceptable saes not N mrMM to It mMxliw, d IN Egna Were IN armed of ay AJJg'I. a Bae
or concrete carol.
if N the diamar. of IN Farm. Supir IM has Wisfntaily pasty a pmral. M mmw weaaM Ir o
Wad of wit wont aces aka to OWN Aggrgnfe Base or cane caong a is r bit tore rreomde ran
aml pia to One St Apple BEe an Wrrne WM¢ "I W mjxl to mS, nor wood don This to dnarml
Of the Apttfter ease or aMm1e carting,
3) ANdWe Store
A) Caro
q This wm sal ocNst d p4tiq 0 carp W Aggregate 9m Of a imam w1 giby d in ammce with Sedkn
Twat of IN soma swedtaoa
.) Ap Mlle Bit raA Toll the in maoars orb `.Noes MEDIC of the L Sped6W iaz
M) 1M Ag? pde Bit mKaa sal The Mdr from a CalifW peep le Pro]er IS ¢caYrce with Section 917 Of
IN Lme d SpeoliWb
te) Re ryymole Bit WI "I To roiled oa oasWed go. one an the wok Me an a earner that m6m
we"= m moisture ids
v) .gat "e � oil� Kua n s mil ASQo55 W b UicW�3 eqa a grass than limits
B) Formation as 5� M Unho n;
;) Ire agtherec a Rs sea low pa 1 in ammo with IN lenpeaae l riWa of Section 301,041 d the veil a
SonimUah
if Fmzm mi sal M W as[5M1
ill) AWr a Bees ma be owes and � fpW rat was to Noamer .a in am to saw Wang in amnia with
Sinim ACGv) of Ws win.
C) Rgra'vn
i) The p do maned onto N hea from obiUb as mrMgrl era At IN time of sonars.
iq The to g be scat P amtaa prod ma n amrmce with Section 2 Of Ire Roam $p fG os
just Mac to OWN the Agggm, Bite mere angrowe in ® with action x(v) d this wiy. IMecM
veer fah the comcled W Ve mbfiocwm Of Ve Efga hype only AAgme Bx is gram
D) `omdng m Fe N
,) ON Aggregate Bite "I the omd in accomce *In acb'on 30145 of the 9aava Spxapalaa
g) IN Aggrgae Bit "I the caraxhM an area *In Swat ,WI w of the 9a :pea'fnaoa
k) trade orb sa the oil over Ne Apaple Been within IA c doll Meseta B that Iy egato for
a wire of Inner geaer Than 14 mtm ding r experience a � son event err to the der of
mine are pool be Coil to + n as xaaaa by the Engrce. A the amnion Of the ug'rm,
oddtoa pad mad o ew IN r
a) Lorne Cre
A) Gerrd
I) This won sal mils of fixing concrete calang an p M mI abgrade Or Agyepm Bffi in xeama won
anion Iwo d IN sward Spwl K a
p fimete are sal te caslnctM an p Soil slogreces or Ap gale Bus to IN dmsetsca stoaxds a the
gaicrtle City of Cvms Sladwd EHo15 or in occurrence with the mh'ng Mule of IW gpoel and
monvds
ki) Lb1erHs � in the pole d the m e fa the mGrg MCI IN in acamce Alto 'slices got d The
S Spwfcdive Hgh my NWgh mNm nwn be ulifizM out "I not be panted in wdvin9 any
fgn s of INS pain Frieze pdWion W,iduas "I not be minor under pry dmA
.) Eoe maize to mode arNng imaaMm work IImodrg m lm Iirritel to prodcum hwiryaRay, damn
macto'+n pmirg, can lirmhas wl m eb,eMe/auhay newly fall we In ott with SVTun yB of the
Sanford medicament
v) Caoele E metim move and hsiy/mi sal we T mammas *In Sanm YQ ID of the Ra
y ,fi s
d) Tasman d see coree came iM dM on see am" Coraructac mammas owl W mnmted an see wee
wring e
B) Rewdan
i) The with sdgaY a Aggregate Bee sal M object W cediaa pm rats in tit with eallior =26 Of The
Loma a{%('co'me ima *a to dmlg Re wk m a acamee with Section MIS) as m(s) of In's wax
Uwtmtade vent sal W corrected b IN m19ab'm Of be Ergnat bone dacarrl of My c e Cvurg
iq At dspwewal Or Nit of ve Sol sbgrar a AggiNM Bne sal he reposed prior to placing Lorne grekl4
C) Wawn oil seta umtdas
i) Come ameg sea Only W tom in =a wive Scan MA of the Loam SpWGwws with IN
exogim that daermt mad're sal rat begin Ina IM met I lerr m AYtE m forg Raul
ryal "I the cocaine] era, Ire omwwm l doe k ds N oil A Or Ww M the dwnim of
the Etgrca, Lorne nq be dam of aK+fR tMwp I thn noted WKS pore IM dzasN, pil
misting pool met mantes cMom to action 502.11 and MI I of IM 9amd Sp[ilimMat
.1 M mdae Yoh W ddU on o Imam e1goce or Agargate Base
i) IYbc no drmrslaus sMu carets curt W diet Msem N 15 oil IbN M
a) If a and sbgrobe or Agool Bite over whim cacrne are is to died IS tithed as avxm by IN sty pea
to MrvMa 30 dxmml d the move ase oil W dbsN m to Wester IN ponMl IM the a as
mil seams Or Agyaple ase saw ternwrdae mlmw von the ,wa is at Sou AGO) of this win al
the p 'y cmawa my to the w Of a Id time cmAWanon ,s to aq Nn "I mil m an out a
a Of The Egret. The Ergnr sit wxt The man<tesn in ter.
v) If the o out oil Sow segue an Anode Rat scan tea we carats with IN rim is Of Swkn AGO)
d this wiry Mean bit I vat As, IN onsne can "II W diesel to W Onto an an apart mI gbgwe
an Aggregate � wodm that The Nail contractor per for the worries d a No time contain, i,ywm wl
Mac "I xl an an Out han'Re aIt at IN Er4 * M Garter sal vJnt IN nomination inygta.
*1 The E*r ,ea the rm to smerd al coc ee ore dnmre aauon If. in the cons, of see EgKr,
that prohirg awn mabos explain the a ati d the Sgale what the AggrwW Gs may malt in
MWoa d come cab daenMl, coke od fmmnt
D) pocCnea
i) concrete orb Afar to fixed n xmmuce, wan Sesson 50i M12 vd SO&Okc) m 605Da(d) of the sand
sainfarmism
kl Curb marnhe may be Wim in aces with anon R f(c) W occu ) Of the soma Speo'licalos
podded that the equipment coeamm m the repamed5 OF Smim 5011 a IN Standard ymlicdian
r) Moak shed comply Wen the regenmrs of Section MOO) Of the Slams SpmlWd
IN) Form "II W mmarm in amdm with Sxu'm Sm.l6 and fiwa(u) of IN Lamd Spmfic
E) dares
if ,haled trial conform to the rel area s Of Swim 503 oil 6w64Ne) M the soma Soaps m'osh
g Jids sal W aad4tl at aern s d Vol or In, 5-IM Or ks Mnq midi Jams in idgd curb oil oY
sa the KK W m the vide Ixdim an the 'pits In IN Wlody smH Aims sal W m to a mdnun
depth d 1/3 the cloth a wh m of the ore (02/02/1A).
m) Re1amN eryadm par "I W ox a werMs of Wl Or less at 01 µ5lirgt the bemN pd erd d di
cW react the era Of Rh rays Kok aol Mae not ridirq donM him In potion to them neira we A
season Toms in idgd can and away no be Pw it IN rare Indian or Use a w join in me
Mp'rvy 9M k
F) tinidng ad Gny
i) IN concrete Lob thaw be fiNthw as arum In ncormce Am Sal 512.14, 502.15, be and 6061(i of ere
Saved y fi t,an.
if hall cm{aM sal te owned to as mmWI swln6 an Sp-Iwmen cat a Corp. Far Tossed mvee cut
owing cofmoa wire be espied to an a of rolmng dos offer any flows ore homed.
i IN corcrne cab p ll be sowed to was Its a rwwi,as d 1Nze pa to ass 06 Mlllaky option
Moat 0 IN caoNe owing (D2/D)/Ie}
G) B MIN
t) TN span a4aWn to the Lorne an sto be My W kI dmdoee Mn ta$ibr 605,01(g) of the Rama
Spolfa a¢ Only don Ibe c e eating is it tO od ¢ceded by The Dg'ma in ataMw with ankn 5 of
this at
iq Bodi adoa real W arena prior m a N IN prep to reya arsaunb'm traffic
5) bvpel:l
A) At era s fudsal oil MM1 out On whol of IN K we W abject to ngaC Me Sm4m Iw ID of IN
Somd yeormos fa IN Moose of paten g that the wk a in sln m,Fanoce Mn this way ad IN
gwd.N costnslim excoMes.
0) The CnnMa "I May The Ergner o nwhimarr d dB-Mn in pace of cams N ay oak aba110 the
gamed wW by ins Entry.
C) The CMmnor "I a le mums Mh the Eghee m" Of peons n mmee d such pafmkz
q The W kmta as Ega win coact an inaeeuon Of the rom cdc ere cabng to any Mrmpe, iIncluding fang An
Mbn rocks. The Try tm an do nectl•4y mani zbll be cam'nM p or 0 MFndlire coca ni
E) sr N oil swing of malt ew or mlm,abon wax may N sailsomed at IN c.Wcx an the eMmna a
me diversion of IN E,ga for ft o Of a etoON trot the work a in sbsbrtl mmamam with this oI
as IN aWomd costavow Murmis So aing not tatirg Yoh conform to the rewirements of the ded of the
Rama ynirwdos apdctlwe to the mlkn Of Ve eak a W to W rim-conpiom a 05 sancta by the Engines.
F) Wye the Engineer WNmn that a m b Carl mMirW with der rN is quaky a Tie� akuoae
Carlo serf W men as feted m the egase Of the Corals, IN arerge thiW of IN cam mall wit Or
acWf the nimman Wm,u by IN gaael a Wnkn Wmmlz
G) Such it Utt sdl SA W cmSrm to 0'22 the Wdasages or cMratas in vy vary From thor
Wgatos oil rcPr l.km am ver contracts Speobwl", .n km by the Dg'a, or by rdo'm e*m Or
� merpetoad he caNrulia Monmis byUSEcaarwaduring arostWc6m� ae vnrhFla W
men d caarxtw, W la mldy on The jo AS,
dQ Wyk g ;for to not mW the rig a a S of IN 04 or the awed ma tc dwrmts uacccWdk wk
Nair f reset d a wfmvaip use of Maim moo hnnge through me4 Or any den ml, found
b not pia to IN law aCMvar Of the wk sal be rimed ,nnM'mdy m rid n an poops near at
the W woes amerce
q If the O k6 ma to ITS 0, fodnMn *In oy Oder mime unw Not Mama* Of this abxaam the Bga we
h oA to m mgm Wen wk to be ,arv{M a ,artttl al Owpkmt to cos vorb silk to W
rmrrb pro to OM,d the aay Iran pry mmw; ere or to bevme are
J) oak doe mWm' P oriental posed by the Enga "I be m W a We W abjw P amost
rmR,al as maacmar in oc M" with the iwWaos erased IN the Bga.
6) ACMthtt
A) Wane xadprce of ve cone wit IN Ergnr gat Warms a the impmends ere in sb d mlmiatt
with the wiry (Q fa ay ousts gwlM) atl IN gaw.N Cox ra4wl ones rya.
B) 1N Eigm Wou it his s4 dsretvk n work w a mi in mewmvee Am IN; wtrr wddM IM the Mark I$
rota for a Wad owa than more yws the E,gm no wmiw Use wer t>mng ,gwema
S\NPPP