HomeMy WebLinkAboutC8 - DUKE ENERGY DETAILS - CIVILSmall Flat Pad and Pit Pad
See
Note
2
8291
See
No
(Drawing
2
Not To Scale)
■�11��I�IAII�PJA■■■
■�11��I�IAII�PJA■■■
y • •
• e e
• e e
j 12" 34" 24" 12"
��
61'
17n
6"
See Note 2
SMALL
FLAT
pp PAD
of
8431 PIT PAD
DIMENSIONS
8299 WIDE
84so LONG
1) Pad to be a Minimum
of 5 - 1/2" Thick
2) Shaded area around
pad indicates minimum
clearance from
obstructions.
10 (Refer to the Padmount
Feet Building Clearance Standard
for minimum distance from
sides and back of concrete.
1Or minimum from front of
concrete.)
3) Pit Pad Only
4) Cover bottom of pit
with 6" of gravel.
Duke Energy 3-Phase Padmount Transformer Concrete Foundation Specifications
5
FINISHED
MAIN
NOTE: WATER MANS SHALL BE
LOCATED ON AN UNDISTURBED
[EDGE 11
SANITARY SENER�\\A\v
Ml -------70 Ml•RI
WATER MAIN�
JOINT SANITARY JOINT
FLOW
WWMW.CDR
IF 'As IS
IF "B' IS
THEN SANITARY SEWER PIPE SEGMENT SHALL BE
1s- OR MM
I IT OR MORE
N0 SPECIAL PIPE MATERIAL OR GRADE RECUREYENTS
m THAN is,
LESS THAN tow'
PVC DIFFER AM D 2241 (MR N) OR ANS/AWWA C900 (OR 18)
OR ANS/AWWA (905 (M 21) OR DUCIRE IRON (CLASS 51 MINIMUM)
July 2009
NOTE: SEPARATION DISTANCES FROM WATER SUPPLIES AND PIPE CLASSIFICATIONS SHAM CONFORM TO
NMMA STATE BOAAI OF HEALTH'S 'ell WATER SUPPLY AND WASIEWARF DISPOSAL FOR
FNNIC AND WMMERDN ESTABLISHMENTS - BULLETIN S.E. 1Y
WELL/WATER SUPPLY & SEWER CROSSING DETAIL
No.
19300219
STATE OF
CLAY"TOWNSHIP REGIONAL WASTE DISTRICT
cl I
RELEASED FOR CONSTRUCTION Ts7E CROSSING DETAIL
Subject to compliance with all regulations File T:\8[�6N8\001
of State and Local Codes
e City of Camel ((��
�{Am�lUllonr3hDAaL
DATE: \\ 10/30/19
4R1 QUAN-
EACH SIDE
4R5SPACED
IN FRONTAND I
4R3 QUANTITY (3)
AROUND SIDES, FRON ,
41 QUANTITY (2) AND BACK OF PIT
EACH SIDE OF THE TOP
4R2 QUANTITY (2)
EACH SIDE OF THE TOP,
DOWN THE SIDES, AND
ACROSS BOTTOM OF PIT
ALL BARS 1t4
GRADE 60 DEFORMED
SHAPE
DETAIL
SYMBOL MARK
U
4R1
Lf
4R2
0
4R3
4R4
-
4R5
4R1
2
Center bare in "pit We aide wab. Provide 3" bolstered
from sell Whom and 2' cbamrice tram top surface 0 W.
4142
2
Center ban In 'pit WY and was. Provide 3' besnnce
Drop wal Whom and T clearance from lop surface a pad.
Termlnate bar ends 2-frown and edges.
AM
4
Center ben In 'pit box and and aide was. Race bottom
bar 3' [rare pit bottom, Race tap We 2' from top surface.
Maximum bar seeding Is 12".
4R4
2
Place bare in approximate locaaans shown to planned comer
check wrow. Provide 2- dearerha Drum top surface and any
opposes edge.
4R5
8
Center In end walls of 'pit box.- Terminate bars Thorn hotion
surface and 2- from lop surface. Maximum bar spacing'a 12%
W WF
.
Provide 2-bearance tram lop supreme. TMmnlnels 2' from pad ledges.
DOILDLO3.CDR
Duke Energy 3-Phase Padmount Transformer Concrete Foundation Specifications July 2009
NOTE: CONCRETE APRON AND CASTING SHALL HE
INSTALLED W THAT THEY DO NOT
CONTACT THE LATERAL OA LATERAL CAP.
NEENAH R-1976 OR EAST JORDAN 1578
MUD SEM W CASTING
6" PVC CAPS
36"
f8
No.
19300219
STATE OF
(ZI
Schneider
I I' CLEARANCE FROM RIP OF
OOTTW OF CASTNG
WRE
- FINAL MADE
-6" PVC PIPE
16" N 8-) TEE -WE
i
6" SEND LATERAL
(HARDSCAPE SURFACES AND AL OTHER INSTAMAIIWS
BEYOND THREE FEET OF BJE-011
TRICO REGIONAL SEWER UTILITY
TYPE 2 CLEANOUT DETAIL
Contractor to obtain and comply with Duke Energy "3-Phase Padmount
Transformer Concrete Foundation Specifications% 7/2009
Customer Responsibilities
The customer may choose to construct the transformer pod on site or purchase
a prefabricated unit from a manufacturer. In either case, the customer is
responsible for assuring the patl is manufactured to the requirements provided in
this specification.
1. Customer is to contact Duke Energy to inspect pad (arms and dimensions
prior to concrete being poured.
2. Customer shall supply the concrete mix (as shown in the concrete mix
specifications). welded wire (abric, C4 reinforcing bars. and sholl pour the "flat
pad" or "pit pod.
3. The dimensions shall be in accordance with the specifications based on the
transformer KVA size. The thickness of all wolls on the "pit pod" shell be a
minimum of 5 - 1/2" thick. The transformer WA Size is to be specified by
Duke Energy.
4. Refer to the Padmount Building Clearance Standard for the minimum allowable
distance between transformer pods and buildings, building openings and
equipment. There shall be a minimum clearance of 10' from the front of the
concrete pod to any walls, machinery. or other obstacles. If there ore multiple
transformers or mediatory bus enclosures involved in the detonation, there shall
be a minimum clearance of 3 feel between oil podmount equipment.
5. When a transformer is installed in a vault. the customer should install a 1"
metering conduit from the secondary compartment of the pit pad to the
metering location as specified by Duke Energy.
6. Customer shall install the conduit for the primary conductors (as specified for
"pit" patl installations only) as close to the center of the "primary" area as
practical. The "primary' conduit(s) and the
7. Customer shall inform Duke Energy of the number, size, and type of
secondary conductors that will be installed. (Example: 500 MCM Copper, 600 volt
insulated, four (4) conductors per phase.)
B. Customer must be specific regarding 4-wire (grounded-wye) and 3-wire
("fioalingwye) deliveries. Special metering and grounding considerations may need
to W considered for each of these deliveries. For 3-wire deliveries, a single
grounding conductor (maximum size 1/0) from the customer shall be connected
to the copper grounding ring in the transformer comportment, and the ground
strap must be
completely disconnected from the %0 bushing.
9. It is the responsibility of the customer to provide roam for excess secondary
cables when conductors are in parallel. All parallel conductors sholl be grouped
and marked by the edeclricion. There must be no more than 1.5 feel difference
between the shortest and the longest of any parallel cables on any one phase.
Concrete Mix Specifications
I. Concrete mix used for Transformer Pods shall meal the following
requirements:
Minimum 28 day compressive strength of 3.000 psi. Maximum water / cement
ratio of 0.50, Maximum slump of 4 inches. Air-enhalnment content between 4
and 8 percent
2. Concrete sholl be afforded adequate cure for a minimum of
five (5) days if the ambient temperature is over 70' F, or seven (7) days if the
ambient overage temperature is below 70' F.
3. Adequate cure can be performed by any of the following methods:
Waterproof membranes. Sprinkling or Sooking, Curing Compounds
4. Pad sholl be supported on a sub -base of send. gravel, or crushed stone.
The granular sub -base is to be a minimum of four (4) inches thick and shall
be compacted with a vibratory compactor.
5. Dampen the sub -base prior to concrete placement. At the time of placement,
the sue-bose sholl not Cooled standing water.
6. The top of the concrete patl must be steel troweled and completely smooth
to prevent " gaps between the transformer and the surface of the concrete pod.
p 9P
TREN01 ERROR OVER 109a AT RIP OF MVATNN
ACQRABLE 1RENm Syrrif Sy51W
1/2 D 1M WE
1/2 DFOR 6" FOR DI
1/2 0
sLE aODITABLE
IAWR
N TA%E cflDw
12 SOUND AS NEWRD BY
ENONEER FOR UNSTABLE
vi intestinal - patl To
FIRST LAYER BEDDING TABLE
m Sol
TD 16"I
tr 4 OWN
ADDING RLOW 11E
MNMIM = 6"
MANLY = to -
"DENT BAoma Teak FREE
Eta IAaem MAN s" OR OTHER
MAUL (COMPACT TO PREVTNT !
IN AREAS All 5 OF ROAD SIIF
Of
e
BE PLACID (ROM 6 WE BELOW TO
E PIPE
M A MINIMUM OF 18INCHES wDE,
TAAD AND WAXED IN.
HAND RATED AND WAUfEO HE
DEIL HIM EXCAVATED)
MANS
PIPE SIZE
1 A
B
UP To 18
I 3-0
2-6
IF AND eNATER
1 0 + 24'
D I W
\d A 0 .,,w2o.
15TERF4 SANITARY SEWER TRENCHING,
No
BEDDING AND BACKFILL DETAIL
193DO219 oz
STATE OF ,',4M €
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER BEDDING AND
Schneider BACKFUL DETAIL
Dale 12/06/06 File
t
STATE OF
W
�
0)
U
�
E
CotN
C/]
F
n
Q
a
13,
o
w
our
N
c
0
0
e
f
FZ
rc a
N
w
0 4
n
w o
n
w
o�
¢
n
w
WJ
3
�
no
o
arc
m
o
x
U
u
a
4
SUMMARY OF LATERAL INSTALIATION REQUIREMENTS
1. Only one buildingmay connect to the sewer main For
y
n,
2. ins, sump s and rstorm water shall never be aproac
water desanitrnever be connected [o the
saita ry ewer. eying yste shall never berstorm
sanitary sewer. She dewatering systems shall never be discharged m the sanitary sewer.
3. The existing sewer line from the building to the septic tank may only be reused N it is located under a building
addition, paid, porch or paved driveway, and the line passes an air test that is observed by TriCo. Contact Triea for
A 10
more information about air testing requirements. The property owner is responsible forteating posts.
o
4. TdCo shall inspect all new laterals or lateral repairs in their entirety. Final connection to the sanitary sewer must be
'
observed by Trimwn . The property power or contractor must notify TriCo prior to backfilling. Inspections must be
l ' !
scheduled at least 24 hours In advance. If an Inspection fails and subsequent Inspections are required, or Nthe
y il
contractor is not on site for the scheduled inspection, a $100 fee will be assessed and must be paid prior to
wY
scheduling the reinspeQion.
0
5. Scene system contents or effluent shall never be discharged to the sanitary sewer. Be adl that your county
department regulates septic systems. Upon connection to sanhary sewer, a septic tank must typically be
abandoned, pumped clean, and filled completely with earthen material. Contact your county health department for
12health
12
more information on septc system and abandonment requirements, and to notify the department of any
abandonment.
6. the following materials are acceptable for use in gravity Warner lateral Installation or repair.
F
PVC pipe: SDR 35 or SON 26, ASTM D3034, 6' diameter
PVC pipe, pressure rated: SDR 21, ASTM D2241, 6" diameter
PVC restrained joint pipe for directional drilling: Cartago Greeniine 50R 21, ASTM D2241, 6"diameter
,
AI assumetl loops shall meet ASTM D3212
At sings shall be SDR26 or better
r
I
Ductile Iran mechanical joint fittings with proper hardware
SDR 26 gasketed repair sleeves or Indiana Seal shear guard
Femco and similar Double couplings are only acceptable in certain circumstances and shall not be used without
prior approval from TnCo
Damage: 6" threaded PVC caps
Bedding: Use 0 crushed stone or fractured face aggregate
The fallowing materials are acceptable for use In low-pressure sewer lateral Installation or repair:
HOPE pipe for directional drilling: DR 11 ITS, 1.25" diameter, PE4710
Connections shall be made via eiectrofusion or using polypropylene or stainless steel compression fittings
Elec[rofusion high volume tapping We, rated 20D psi, PE4710
1.2Y ITS full port 1/4 turn fusible PE ball valve, rated 200 psi
Threaded swing check valve, 316 stainless steel, rated 200 be
Contact TnCo for acceptable pump station materials, equipment pumps and other requirements
7. For gravity and low-pressure systems, the line IeaWng the building shall not exceed 3' in length before a cieanout
must he added a no the line is tansitioned to 6" diameter SOR 35 PVC pipe. Glued joints are not allowed after 3'. No
l
additional gluedfittings are allowed between the building and the transitIon/cieanaut. For all gravity lines, cleanouts
I^ -I
shall not be spaced more than 100' apart between the building and the sewer main. See Tril standard drawings
for more information on cleanout installation.
8. Bedding material shall W placed from at least 6 inches below to 12 inches above the pipe surface. The trench shall
Q
be a minimum of IS -wide with at least 6" of clearance on both sides of the pipe. Material shall ber placed over the
I
pipe and tracer wire after inspection. San, unstable or unsuitable material found below and near the lateral,
^,
including any fill or foundation backoll maternal, most be removed and replaced with 0 stone. The contractor is
solely responsible far establishing stable pipe bedding machines.
w
9. W10-AWG wild coppertracer wire shall be laid on top of and run the entire length of the lateral. All splicing oftmcer
wire shall use 3M splice kit model DBRAY-6, King Innovation Director Direct Bury Lug Aqua catalog N90220, ar Trica
h
approved! equal.
10. Laterals shall be installed at least 20' from waterwells unless WE pressure grade pipe is used. Any proposed
installation requiring pressure pipe shall be reviewed by TnCo prior to installation. Where a transition is made
between SDR 35 pipe and pressure gnde SDR 21 pipe, a ductile Iron gasketed mechanical couplings must be used.
Z N
11. Laterals less than 5' deep shall beat least 24" from the property line.la[eals more than 5' deep shall be at least 36"
Z
from the property line. Where the lateral runs in close proximityto the property line the property corners must be
W 0
accurately staked by a professional land surveyor prior to inspection.
o ry
12. laterals running parallel to a building or structure shall be at least 36" from the face of a crawl space or slab on grade
/^'� ❑ a0 0
foundation and GO' from the face of a basement foundation wall. Spacing requirements also apply with respect to
{J 4 ¢ a
the a raillery structure's foundation depth. Ancillary structures (e.g. window wells) and other utilities shall not be
J
placed over or near the lateral. Tril may adjust requirements where future access to the lateral may be obstructed
�N-1 N UJ S
by other utilities. The contractor should call to discuss further if he/she believes this could be an issue.
to ❑O FO
13. All Infrastructure connected to TriCo's sewer system may be tested, inspected, or televised at Tel s discretion, and
F-Cy ¢ m
must remain woodefble and properly maintained.
w of
14. Call 821 or 3-800-382-5544 before You dig. For more information go to www.indianal ll.org.
m U
DRAWN BY: ALD
If you have arty questions or if You were W request an exception to standards and specifications, please compact Trica
during normal business hours at 317-844-9200 prior to completing the work and scheduling an inspection. Go to
CHECKED BY: ALD
www.[rnco.eop to view standard drawings and specifications.
Revised 3/19/2019
PROJECT No.
1803-021
SHEET No.
C8
DUKE ENERGY & TRICO DETAILS