HomeMy WebLinkAboutCHILDRENS-STORMWATER-PERMITL,.:1 City of Carmel Pernme.
�`eZW STORMWATER MANAGEMENT PERMIT APPLICATION
Submission ol'(his application constitutes notice that the project site owner is applying for coverage under the Carmel City Cade 46-I80
through 66-209 for s(ormwaler discharges associated with construction activity disturbing A acre or more of land. Permitted project site
ownersum required to comply with all temet and conditions or the Carmel City Code.
Project Name: CHILDRENS THERAPLAY PHASE 2
Pmimllucatinm 9919TOWNE ROAD, CARMEL, IN 46032
Quarter: NW114 Section: 9 Township: 17N
Range: 3E
Project Site Owner Name: LUCKY, LLC (CRAIG DOBBS)
Tille/Position: MANAGING PARTNER
Company: LUCKY, LLC
A'Idial 9919 TOME ROAD
City: CARMEL State: IN
21P: 46032
phOOt. 317-8724166 Fax. 317-872-3234
Ehall Address: kpitnetier@chlldrensthemplay. org
SWPPPCt)nmct Person: SCOTT GIBBS
Company Name: FA WILHELM
Affiliation to Project Site Owner: GENERAL CONTRACTOR
Addn'erxWdg rernJrnm above): 3914 PROSPECT STREET
City: INDIANAPOLIS Scam: IN
zip: 46203
PIn'ne'317-359-5,111 Fax:
E-mail Address: scodgibbs@Itewill-elm com
Estimated Project Duration: START ABAP- FINISH 12/2020
By signing IN application, I card fy the following:
A. 'I hems water quality measures i related in the Storm Water PnIlullon Prevention Plan(SWPPP) comply with the requirements of
y6-180 through h6-209 ol'the Carmel City Code. (he City of Cannel Smrmwaler Technical Standards Manuel, and all applicable
ederd. sate, and Incur smrmwuter requirements;
B. "ITe mousures required by the San nwnmr Pollution Prevention Plan(SWPPP).shail be i mplemented:
C. Slormwater quality measures heyorml those specified in the Slormwmer Pollution Prevention Plan(SWPPP) will be implemented
during the life of the Permit if necessary to comply with the Carmel City Cade; am
D" Implemenmlion of slonnwmei quality measures wi ll he inspected by rained Individuals;
E. Pursuant to Carmel City Costs 56-205. the City reserves the right to map=( hauler l mplemem the stormwater quality measures
ontlircsdinthe Bllny1 act Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed.
I/11 p�/�lg�� I `I�L�IR-ELEASED FOR CONSTRUCTION 7101/2019
Subject to compliance with all regulations
of State and Local Codes
9e City
y7at Carmel \(�'
4V11Y`DW�r4Wa�
DATE: 10/30/19
Data
Dale
Ilunion Rurenlitn Plan (SWPPP) by tM1c Cily of Carmv'I.