HomeMy WebLinkAboutCHILDRENS-THERAPLAY-PH2-DRAINAGE-CALCSCITY OF CARMEL STORMWATER ORDINANCE Children Theraplay Phase 2 9919 Towne Road Carmel, Indiana DRAINAGE PLAN & CALCULATIONS KEELER-WEBB ASSOCIATES ConsuMng Engineers - Annners - Sunxyors TELEPo ONE 1317t 574 0140 wmv keelerweEL com 486 GraE1e Drive RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 TAB 1 SUMMARY RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 KEELER-WEBB ASSOCIATES Cosesniting Engineers- Planners- Surveyors TELEPHONE(3R)574-0140 wew aeelerxebb com 496 Grosse on" Cannot. Income 46032 Project 9919 TOWNE ROAD Subject DRAINAGE SUMMARY Proj. No. 1603-021 Date 9l2"19 By ALI) Chic. ALD MASTER DRAINAGE PLAN AND CALCULATIONS SECTION 1 USING TR55 OVERALL TIME TO PEAK= 22 min. The post -developed runoff pattern is as follows for each of the watersheds 3 - This watershed will sheet flows across the pavement in curb inlet 3. Than the stone water is conveyed by the on - site storm sewer system and outlets into the Proposed Infiltration Trench BMP 1. Then smnawater continues downstream and is discharged into the existing Detention Pond B - BMP 2. 4 - This watershed will sheet flows across the pavement, and landscaping islands to curb inlet 4. Then the strum water is conveyed by the on -site storm sewer system and outlets into the Proposed Infiltration Trench BMP 1. Then stmenwater continues downstream and is discharged into the existing Detention Pond B- BMP 2. 5 - This watershed will sheet flows across the roof, pavement, and landscaping islands to curb inlet 5. Then the storm water is conveyed by the on -site atoms sewer system and outlets into the Proposed fnfrlrradon Trench BMP 1. Then stormwater continues downstream and is discharged into the existing Detention Pond B - BMP 2. 6 - This watershed will sheet flows across the roof, pavement, and landscaping islands to curb Wet 6. Then the storm water is conveyed by the on -site store sewer system and outlets into the Proposed Infdrradon Trench BMP 1. Then stormwater continues downstream and is discharged into the existing Detention Pond B- BMP 2. 9 - This watershed will sheet flows across the roof, pavement, and landscaping islands to curb inlet 9. Then the stonn water is conveyed by the on -site storm sewer system and outlets into the Apposed lnfrhrafian bench BMP 1. Then stormwater continues downstream and is discharged into the existing Detention Pond B - BMP 2. SUMMARY COMBINED AREAS STORM DURATION 100-YEAR RATIONAL METHOD 9.03 cfs RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 10/30/19 SECTION 2 STORM SEWER SIZING SEE THE STORM SEWER REPORT FOR PIPE CAPACITY, HGL, AND AMOUNT OF FLOW IN EACH PIPE RUN FROM STRUCTURE TO STRUCTURE. ALL ROOF DRAINS DISCHARGE TO PAVEMENT AND ARE CAPTURED BY ON -SITE PRIVATE STORM SEWER SECTION 3 DETENTION SEE THE ORIGINAL STORM DETENTION CALCULATIONS FOR THE ORIGINAL TREESDALE SUBDIVISION. THE CHILDRENS THERAPLAY SITE OCCUPIES ALL OF THE AREA SHOWN AS 17-21, WHICH FLOWS THROUGH 400 AND 401 THEN DISCHARGES INTO COM B (DETENTION POND B). PER THE CHART ON SHEET C2 OF THE CONSTRUCTION DOUCMENTS THE PROPOSED IMPERVIOUS AREA BY DESIGN COVERS AN AREA WHICH IS 172 sq.8. LESS THAN THE PRE-EXISTING CONDITION. BECAUSE OF THIS SMALL AMOUNT THE CN VALUE HAS NOT CHANGED FROM THE PRE-EXISITNG CONDITION TO THE PROPOSED CONDITION. SECTION 4 WATER QUALITY THERE ARE 2 EXISTING WATER QUALITY BMPS PROVIDED ON THE PROPERTY AS A PART OF THE ORIGINAL STORMWATER DETENTION SYSTEM. BMP 1 IS APROPOSED A'EILTRATION TRENCH THAT IS IN BETWEEN THE STORM OUTFALL FOR PHASE 2 AND THE EXISTING STORM SEWER CONNECTION AT THE END OF THE STUB STREET FOR TREESDALE SECTION 1. BMP 2IS DETENTION POND B FOR THE SOUTH SIDE OF TREESDALE SUBDIVISION WHICH INCLUDES THE CHILDRENS THERAPLAY SITE. THE COMBINATION OF THESE 2 BMPS WILL PROVIDE SUFFICIENT WATER QUALITY STANDARDS. THERE IS ALSO ANOTHER DETENTION POND A ON THE TREESDALE SUBDIVISION WATERSHED AREA WHICH WOULD BE A 3t° BMP (ALTHOUGH IT IS NOT IN -LINE WITH THE OTHER TWO BMP's.). WATER QUALITY WQv— (P) (P+') (A) / 12 P = 1.0 inch RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 RESTRICTED OUTLET 100-YEAR OVERFLOWELEV. 860,94' TOTAL REQUIRED FORE BAY VOLUME 0.011 Ac.-Ft. FOREBAY VOLUME PROVIDED =0.011 Ac. Ft. = (BOTTOM=85834', CRESTOFFORERAY@ ROCK CMECKDAM= 859.84) DESIGNREQUIREMEN78 • <5 Ac. • Existing soilpermeability>0.3 in/hour • WQV calculated as above using contour elevations to determine volume and typical crushed stone porosity (storage capacity in below grmde stone) • Vegetation specified as Tall Fescue on details and notes • End -Section & rip -rap for energy dissipation provided • Basin will drain in < 24 hours • 25'Buffer zone provided iniNGRESSIEGRESSBMPDRAINAGE EASEMENT, no known wells within 100' ofinfiltration Trench • Access to Infiltration Trench by on site tractars/equipment is easily accessible • Freeboardset atpavementgrade over RCP oudeipipe • Rock Check Dam near the outhosets storage volume height • Bottom ofinfiltration Trench above ground water table • Will remove TSSfor Ecoli from the use on the property • Emergency spillway will be conveyed by existing storm sewer which discharges to the existing wet detention pond • 8'flat bottom swale with 4:1 side slopes RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 TAB 2 STORM SEWER SIZING REPORT POST -DEVELOPED STORM RUNOFF RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City oL Camel DATE: 10/30/19 Subject to compliance with all regulations of State and Local Codes RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 !! »!!!!! l:::;; H E !! ![[!! | as !! z!!!§! !| `!|§§; •_ «;!!!� !■ «||\|§ !! !!§!!! ■- «|||§| _• «|||| RELEASED FOR CONSTRUCTION t # ¥ANTS_ all �sof §§ p Caritiel / /\ E _E: ,oai&g k k CL k \ 0 |! « !!§!6 , cu �!-! (\\(! ! •z mama|!! !!« |||\| !|® mama!!! !■mama! ! |mama mama! • Is � as §!« ||||\ |)§|| ! . ;,r,; •z !§!§§ c!• ||§|§ mama« mama!!! ! !� mama§§§ ,!# r!!!§ f `!® |||E| |y mIs■BFOR CONSTRUCTION ) i Subject to compliance with ll milulations aof State and Local City at Caritiel i( _E: ,oai&g TAB 3 TREESDALE DETENTION RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 3 Detention Calculations RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 TR-55 STORAGE VOLUME FOR DETENTION BASINS VERSION 1.11 Project : TREESDALB User: ALD Date: 12-2¢-99 County : HAMILTON State: IN Checked: Date: �i/we Subtitle: POST -DEVELOPED STORM WATER RUNOFF Drainage Area: 73.1 Acres Rainfall Frequency: 10 years Rainfall -Type: II Runoff: 2.9 inches Peak Inflow: 137 cfs Peak Outflow: 97 cfs Detention Basin Storage Volume: 1.02 inches or 6.2 acre feet RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 TR-55 STORAGE VOLUME FOR DETENTION BASINS VERSION 1.11 Project : TREESDALE User: ALD Date: 12-28-99 County : HAMILTON State: IN Checked: Date: Subtitle: POST -DEVELOPED STORM WATER RUNOFF Drainage Area: 73.1 Acres Rainfall -Type: II Runoff: 2.9 inches Peak Inflow: 163 cfs Peak Outflow: 47 cfs Detention Basin Storage Volume Rainfall Frequency: 100 years 1.12 inches or 6.8 acre feet RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 KEELER-WEBB ASSOCIATES ComuLting £ngineeex-P{annars-Surueyms ABa GRgOLEORIVE - CARhaEL. INDIANA w9X12 PHONE (317)57 eQ . FAX (317)573laia TR-55 Method SUMMARY Project TREESDALE Subject Pmj. No. 9905-008 Date 3/21100 By AID Chic. ALD BOTH RETENTION PONDS ARE DESIGNED TO GRAVITY FLOW WITHOUT INTERFERING WITH THE 18" GAS PIPELINE (i.e. 2'-0" CLEARANCE ABOVE) THE PONDS ARE DESIGNED TO RETAIN TEE DIFFERENCE BETWEEN ACCEPTING (OFF -SITE 10•YEAR RUNOFF +ONSTTE 100.YEAR POST -DEVELOPED RUNOFF) LESS 2-YEAR PR1 DEVELOPED STORM RUNOFF RETENTION STORAGE TO POND `COMMON A' &'B' (BY CONCENTRIC CONTOURS) 10-YEAR STORM ELEV. =85T.96' 100-YEAR STORM ELEV. =858.1W RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 10/30/19 0 301 Pf 3 Wo 30£ COMA 3W L0T9 C90 Spy I00 a i 0 • .x 0 V-21 �4 � came LOT ID • If"I 9•AB I w � w I v !�R "m 711EEMAa D94114f3E NAP RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes Sam City of Camel DATE: 10/30/19 TR-55 TABULAR DISCHARGE METHOD VERSION 1.11 User: AID Date: 12-30-99 project : TREESDALE State: IN Checked: Date: County : HAMILTON Subtitle: POST-DEVEIIJPED STORM WATER RUNOFF Rainfall type: II Frequency_ 100 years Total watershed area: 0.042 sq mi Subareas ----'-"--" _ ________ 400 ---"---17 401 17-21 11-16 0.01* COM B 0.00* Area(Sq mi) O.OD* 0.00* 0.01* 5.8 57D+ 5.8 Rainfall(in) 5.0* 5.8 70+ 85* numb Curve number 70 70+ 2.65 2.65 2.65 4.11 Runoff 2.65 0.61* 1.40* 1.13* 0.20* ) Tc (bra) 1.50 1.25 0.20 (Used) (Used) (U 1 .00 0.50 0.00 0.00 0.00 TimeToOUtlet 0.00 0.00 0.15 0.15 0.06 I alp 0.15 0.15 Oils 0.1s 0.10 (Used) 0.is a.15 Subarea Contribution to Total Flow a N B --"'--'"' Time Total -----------" 401 17-2 11-16 (hr) Flow 400 11.0 0 0 OF 0 0 0 0 0 11.3 1 0 0 0 0 0 1 11.6 2 0 0 0 3 6 11.9 4 12.0 9 0 0 0 1 1 11 12.1 14 0 0 0 0 1 1 12P 12.2 19 0 0 1 2 7 12.3 19 1 12.4 21 1 1 00 2 4 12.5 26 1 0 2 5 2 12.30 2p 0 3 6 2 12.7 34P 2 0 4 6 1 12.8 33 2 0 4 7P 1 13.0 31 2 0 Sp 6 1 13.2 28 2 0 4 5 1 13.4 22 1 13.19 1 0 4 4 1 1.8 15 1 0 0 14.12 1 0 2 2 1 14.3 9 0 0 0 1 2 1 0 14.6 7 15.0 5 0 0 1 1 1 1 0 1.4 0 0 0 1 1 0 16.0 4 0 n 0 1 L 0 0 RELEASED FOR CONSTRUCTION o i 0 D 1 0 Subject to compliance with all regulations 0 0 0 of State and Local Codes 0 0 0 0 City of Camel 0 0 0 0 e yvT�Sa+�o0n1�L :mm TR-55 system \ routines w DATE: 10/30/19