Loading...
HomeMy WebLinkAboutP001 - PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL NOTESW C I 6 5 4 3 2 1 NOTE: ALL SYMBOL DESCRIPTIONS ARE SUBJECT TO MODIFICATION ON THE DRAWINGS. ALL SYMBOLS NOT NECESSARILY USED ON THIS PROJECT. GENERAL SYMBOLS: PIPING DESIGNATIONS: PLUMBING ABBREVIATIONS: POINT OF CONNECTION f 1 NEW PIPING AFF ABOVE FINISHED FLOOR YYY S 1 EXISTING PIPING TO REMAIN AFG ABOVE FINISHED GRADE AHU AIR HANDLING UNIT POINT OF REMOVAL F----------------i EXISTING PIPING TO BE REMOVED YYY AD ACCESS DOOR O PLAN NOTES PIPE SLOPES IN DIRECTION OF ARROW AV ACID VENT AW ACID WASTE f--. DOMESTIC COLD WATER 1� DEMOLITION NOTE BDD BACK DRAFT DAMPER f---. DOMESTIC HOT WATER BHP BRAKE HORSEPOWER BLDG BUILDING iQ REVISION i-- — —. DOMESTIC HOT WATER RETURN Boo BOTTOM OF DUCT f----140°F4 DOMESTIC HOT WATER 140°F BOP BOTTOM OF PIPE DETAIL BUBBLE BOB BOTTOM OF STEEL M 501 5-----140°F� DOMESTIC HOT WATER 140°F RETURN BTU BRITISH THERMAL UNIT 1 f W 4 WASTE PIPING CO CLEANOUT M 501 SECTION BUBBLE f ST. STORM PIPING CS CUP SINK CBS CLINIC SERVICE SINK F--------i SANITARY VENT CAP DOMESTIC COLD WATER f D. INDIRECT DRAIN D CONDENSATEIDRAIN DB DRY BULB f AW . ACID WASTE DCV DOUBLE CHECK VALVE F------- AV-------i ACID VENT DIA DIAMETER VALVES & FITTINGS: DN DOWN f DE. DEIONIZEDWATER DWH DOMESTIC WATER HEATER s-- GATE VALVE f DI . DISTILLED WATER FD FLOOR DRAIN ESEW EMERGENCY SHOWER AND FACEIEYE WASH s— v. BALL VALVE f RODI . REVERSE OSMOSIS DEIONIZED WATER EW EMERGENCY EYEIFACE WASH S—)e --, BUTTERFLY VALVE f LS . LAWN SPRINKLER EL ELEVATION f G. GAS ES EMERGENCY SHOWER S—� CHECK VALVE EXIST EXISTING f FOS. FUEL OIL SUPPLY FCO FLOOR CLEANOUT GLOBE VALVE f FOR—. FUEL OIL RETURN FLA FULL LOAD AMPS �Sk VALVE IN VERTICAL PIPE HB HOSE BIBB f FOV. FUEL OIL VENT HKSP HOUSEKEEPING CONTROL VALVE f VAC—. VACUUM AW DOMESTIC HOT WATER REDUCED PRESSURE BACK FLOW PREVENTER PAR DOMESTIC HOT WATER RETURN f A. COMPRESSEDAIR I HWCP HOT WATER RECIRCULATION PUMP f 1 INDICATED FLOW DIRECTION IE INVERT ELEVATION PIPE TURN 900 JS JANITOR SINK LAV LAVATORY ,IA SPECIALTY PIPING MB MOP BASIN LINE BREAK NC NORMALLY CLOSED f MV4 MEDICALVACUUM 5 PIPE ELBOW UP (RISER) NO NORMALLY OPEN �SV� SURGICALVACUUM PIV POST INDICATING VALVE 5 PIPE ELBOW DOWN S LV 4 LAB VACUUM PSIA POUNDS PER SQUARE INCH ABSOLUTE 5 PIPE TEE DOWN PSIG POUNDS PER SQUARE INCH GAUGE �N2� NITROGEN RO REVERSE OSMOSIS O � CAP OR PLUG S N20 4 NITROUS OXIDE RPBP REDUCED PRESSURE BACKFLOW PREVENTER :—jr=. REDUCER, CONCENTRIC SAN SANITARY �CO2� CARBON DIOXIDE SH SHOWER f--�1, REDUCER, ECCENTRIC S AG 4 ARGON SI SEDIMENT INTERCEPTOR FLANGES SK SINK �MA� MEDICALAIR SS STAINLESS STEEL s�It� UNION f LA 4 LAB AIR ST STORM WATER S-- Mo-� METER TD TRENCH DRAIN �O FD FLOOR DRAIN FIRE PROTECTION PIPING SYMBOLS VTR VENT THROUGH ROOF W WASTE GAUGE S F. FIRE PROTECTION WC WATER CLOSET 4 THERMOMETER f PA. PRE -ACTION WH WALL HYDRANT �T STEAM TRAP f FDP. FIRE DRY PIPE GENERAL NOTES: w PENDENT SPRINKLER HEAD © PRESSURE SENSOR 1. VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO BUILDING AND BEFORE 0 CONCEALED SPRINKLER HEAD BEGINNING WORK. INLINE PUMP G UPRIGHT SPRINKLER HEAD 2. REVIEW THEWORK OF OTHER TRADES, COORDINATEAND-PLANWORKWITH THE OTHER TRADES AND OWNER. ADJUST AS A RESULT OF COORDINATION. 00� SIDEWALL SPRINKLER HEAD 3. STORE EQUIPMENTAND COMPONENTS IN ACLEAN, DRY LOCATION UNTIL READY LiFOR INSTALLATION. PROTECT FROM WEATHER, DIRT, WATER, AND CONSTRUCTION u FIRE DEPARTMENT SIAMESE CONNECTION(FREESTANDING) DEBRIS,ETC. AT ALL TIMES. ANY DAMAGED EQUIPMENT OR COMPONENTS SHALL BE RESTORED AS NEW OR REPLACED. FIRE DEPARTMENT SIAMESE CONNECTION (WALL MOUNTED) rI 4. ALL THE PROPERTY REMOVEDANDNOT RELOFROM ETHE TTE PROJECT CONTRACTOR. REMOVE MATERIALS FROM THE PROJECT SITE UNLESS NOTED CONTRACTOR. STt FLOW SWITCH OTHERWISE. TS 5. PATCH WALLS, FLOORS, CEILINGS, COLUMNS, ROOF PENETRATIONS, ETC. WHERE S pQ. ZONE CONTROL VALVE WITH TAMPER SWITCH ITEMS ARE REMOVED TO MATCH ADJACENT SURFACES. 6. DRAWINGS SHOW THE INTENDED ARRANGEMENT AND ROUTING OF ALL PIPING, EQUIPMENT, AND APPURTENANCES. THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND WORK OF OTHER TRADES WILL PERMIT. 7. CLEAN ALL EQUIPMENT TO PRESENT A"LIKE NEW" CONDITION AT PROJECT COMPLETION. 8. OFFSET PIPING AROUND ELECTRICAL PANELS TO PROVIDE CLEARANCES AS REQUIRED BY THE NATIONAL ELECTRICAL CODE. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Ca�rmed� 1 �" UJINN '--` a a a a a DATE: 10/30/19 5 4 3 2 1 E 10 C 0 SCHMIDT ASSOCIATES 415 Massachusetts Avenue Indianapolis, IN 46204 www.schmidt-arch.com Project No. 2018-106.CTC Project Date 03.22.2019 Produced Designer Author 3/22/19 Applied Engineering Services wnod:r ra,p.-no,�..nam • iwsmi aw Td LI8N1111 • r¢y18011q •Hn up{Yiamo These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Wodc without prior written permission from the Architect. 9919 Towne Road Carmel, IN 46032 N KEY PLAN Children's Theraplay Renovation and New Construction PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES P001