HomeMy WebLinkAboutP100_Plumbing Notes Symbols and Schedulesr
GENERAL NOTES
PLUMBING FIXTURE SCHEDULE
PLUMBING SYMBOLS
1. Materials, equipment, and systems shall meet all pertinent requirements of the Underwriters Laboratory (UL), the American
ID MANUFACTURER MODEL DESCRIPTION FAUCET/VALVE L W/DIA H MOUNTING HEIGHT DRAIN VENT HW CW NOTES
--SW- Cold water piping MC Mechanical Contractor
Society for Testing Materials (ASTM), the 2012 Indiana Plumbing Code, ASHRAE 2007, American Water Works Association
-9w- Hot water piping GC General Contractor
P-1 American Standard 2467.016 Press. Asst. Tank Type Toilet == 31" 22" 31" 17' to dm 3" See Plans == 1/2" 1,2,3,4
National Fire Protection Association (N FPA), and other nationally recognized agencies as well as applicable local
1,4,5,6
- tiers_ Hot water recirculation piping EC Electrical Contractor
codes.
codes.
P-2 American Standard 0356.015 Lavatory 2385.131 19" 21" 8" 34" to top 1-1/2" See Plans 1/2" 1/2"
s
P-3 By Owner By Owner Hand Sink =_ _= 1-1/2" See Plans 1/2" 1/2" 3.4
Sanitary waste piping PC Plumbing Contractor
2. Bidders shall be licensed contractors in accordance with local and state laws.
P-4 By Owner By Owner Kitchen Sink =_ __ __ __ _= 1-1/2" See Plans 1/2" 1/2" 7,3,4
--- -- Vent piping
WH water Heater
3. Bidders shall thoroughly acquaint themselves with the conditions under which the work is [o be performed. The shall
9 Y 9 P Y
SS Fiat FL-1 Service Sink A-1 23" 22" 34" 34" to top 2" See Plans 1/2" 1/2" 34
Pipe up 01 Numbered note
N Pipe down
examine all services, equipment, surfaces, etc., which this work Is In any way dependent upon, and bring any discrepancies
H-DF Elkay EZSTLBWSLK Ell Level Dunking Fountain w/ Bottle Filler == 19" 36" 52" 33" TO SPOUT 1-1/2" See Plans == 1/2" 1.3.4
Gate Valve
UON Unless otherwise noted b
determined or omissions found in the drawings to the owner's attention before submitting bid.
NOTES
r� 'c
IW Ball Valve
AFF Above Finished Floor
1) All Fixtures with 'H' prefix shall be accessible to the handicapped.
4. All installed systems, devices and related items shall be tested in place on site. Replace any and all contactor supplied
BFF Below Finished Floor CO Cleanout
defective devices, items or systems at contractor's own expense before completion of the project.
2) Water closet Is floor mounted bottom outlet type, 1.6 gallons per flush, with elongated bowl and open front seat. Trip lever on wide side of stall.
NTS Not to scale OF Drinking Fountain
3) Pipe sizes shown are connection sizes only; see plans for pipe run sizes.
H- Handicap
5. Contractor shall guarantee all work for which materials are furnished, fabricated or veld erected, all factory assembled
Point of connection
equipment for which no specific manufacturer's guarantee is furnished, and all work in connection with installing
q All water supply lines to fixtures shall have an accessible shutoff valve inside bldg.
) ppy 9'
SS Service Sink
manufacturer's guaranteed equipment. This contractor's guarantee shall exist for a period of one (1) year from the date of
5) Provide and install Watts LFSUGB thermostatic mixing valve set to 105 deg F for all lavatories and hand sinks.
RP Recirculation Pump VTR Vent Through Roof
final owner acceptance of the work and shall apply to defects in material and to defective workmanship of any kind.
6) Provide and install vandal resistant 0.5 gpm aerator for faucet.
6. The systems shown on the drawings shall be provided to serve all fixtures, equipment, and areas within the Contract Limit
Lines as set forth by the Architectural solution for the project. Systems shall include all equipment, appurtenances, safety
devices, and controls necessary for the intended service.
7. All permits and fees required for the work shall be secured and paid for by the plumbing contractor and included in bid price.
WATER HEATER SCHEDULE
GAS LOAD CALCULATIONS
8. Anything drawn or specified on these plans shall not be construed to conflict with any local, municipal or state law, regulation
or ordinance which governs the Installation of any plumbing or related work. Where any portion of the systems are not
installed as in accordance with applicable laws, ordinances, regulations and codes, this contractor shall make all changes
ID MFR MODEL DESCRIPTION KW VOLTS GPH Gallons L W/Oia H MTG HT HW CW NOTES
required by the enforcing authorities in a manner approved by the owner and without additional cost to the owner.
Max Distance From Building Service Entrance to Regulator: 75
WH-1 A.O Smith DEL-40 Electric Water Heater 9.0 208/3 41 40 == 24" 33" On platfarn 3/4" 3/4" 1
Fitting allowance: 30
9. Where job conditions require changes from the contract documents that do not change the scope of installation or nature of
ET-1 Antral Therrr X-Tral ST-5 Expansion Tank =_ __ _= 2.0 == 8" 13" On platform 3/4" 2,3
Total Developed Length: 105
work required, the contactor shall make such changes without additional cost to the owner. No other changes may be made
NOTES
System Design Pressure: 2 psi
without written permission of the owner.
1) Recovery is at 90 degrees F rise, unless otherwise noted.
10. All equipment and fixtures shall be new and unused and installed in strict conformance to manufacturer's recommendations.
2) Expansion tank minimum acceptance is 2 gals.
ID DESCRIPTION QUANTITY MBH (EACH) TOTAL
Provide fixtures complete with all trim, stops, hangers, carriers, supports, etc. including prevision for the handicapped, if
3) Use air compressor to precharge expansion tanks to match incoming static pressure (verify in field).
required. Where fixtures are accessible to the handicapped, fixtures must comply with all federal ADA regulations.
RTU-1 Rooftop Unit 1 1 150 150
11. Arrange for chases, slots, and openings in other building components to allow for plumbing installations. Coordinate the
Rl Rooftop Unit 2 1 80 80
cutting and patching of building components to accommodate installation of plumbing equipment and materials.
PUMP SCHEDULE
Final lead 230
12. Do not endanger or damage installed Work through procedures and processes of cutting and patching. Provide repairs
required to restore other work, because of damage caused as a result of plumbing installations.
ID MFR MODEL DESCRIPTION QTY MOTORS HP VOLTS/PH RPM GPM HEAD LG - W - HT NOTES
Black steel supply pipe size required: 1/2"
(based on pressure drop of 1 psi and gas at 0.6 Specific Gravity)
RP Taco 006 Hot Water Recife Pump 1 1 1/40 115/1 3250 0.5 5' 611x5"x5" 1,2,3
13. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other
structural components, as they are constructed.
14. Sequence, coordinate, and integrate installations of plumbing materials and equipment for efficient now of the Work. Give
OTES:
particular attention to large equipment requiring positioning prior to closing -in the building.
1) Stainless steel construction.
2) Pump shall be provided with Aquastat controls to maintain minimum 115 deg F water temperature during occupied hours.
GAS REGULATOR SCHEDULE
15. Where mounting heights are not detailed or dimensioned, install plumbing services and overhead equipment to provide the
3) Provide and install check valve after pump before to rrpe rat ure gauge.
maximum headroom possible.
16. Install plumbing equipment to facilitate maintenance and repair or replacement of equipment components. As much as
MAX. PIPE RUN CONNECTED
practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.
SFU CALCULATIONS
REGULATOR (after regulator) LOAD (MBH) MAKE MODEL SIZE
17. Coordinate the installation of plumbing materials and equipment above ceilings with suspension system, light fixtures,
GR-A 10 80 Maxitrol 325-31 1/2"
ductwork, conduit, and other installations. Coordinate plumbing equipment and materials installation with other building
GR-8 10 150 Maxitrol 325-51 3/4"
components.
18. All pipes shall be of the size given on the drawings. All piping shall be run true to line. Pipes may be moved, if necessary for
SUPPLY FIXTURE UNITS
NOTES:
installation, rovided that the nature of the system is not changed. All es shall be concealed: located above ceiling, below
P Y 9 pipes 9�
1) Regulator outlet supply pressure shall be 11" WC, unless otherwise required by
Floor or in walls, except where connection is made to fixture.
Fi#ure ID Description ODAN SFU per fixture SFU total
equipment manufactuer.
code Tal Pc CW HW Both CW HW Both
2) Low pressure system max. pressure drop shall be 0.3" WC.
19. Coordinate connection of plumbing systems with exterior underground and overhead utilities and services. Comply with
P-1 Watercloset, PressAsst Tank, public 2 2.0 0.0 2.0 4.0 0.0 4.0
3) All regulators eAedor to the building shall be provided with manufacturer's
requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection
for each service.
P-2 Lavatory, public 2 1.5 1.5 2.0 3.0 3.0 4.0
weatherproof vent cap and Imblue Technology.
rP D gy
P-3 Hand sink, public 10 1.5 1.5 2.0 15.0 15.0 20.0 1
20. Plumbing service rough -in shall be based on information, drawings, equipment cuts, etc. prepared by the equipment supplier.
P-4 Kitchen sink, public 1 3.0 3.0 4.0 3.0 3.0 4.0
Final plumbing connections shall be made from rough -in to equipment after equipment is set in place.
SS Service/Nbpsink, public 1 2.3 2.3 3.0 2.3 2.3 3.0
21. Actual locations and mounting methods for fixtures and penetrations are subject to Architect's approval. All piping is shown
H-DF Drinking fountain 2 03 0.0 0.3 0.5 0.0 0.5
schematically for clarity - coordinate with structure, ducts, lights, utilities, etc. Verify all dimensions by field measurements.
22. All pipes, pumps, control devices, fire protection, and miscellaneous apparatus shall be cleady marked for easy identification
letters high.
TOTALS 27.8 23.3 35.5
GAS PIPING TO
and safety. Use black plastic or bakelite name plate engraved with white 1/4" Punched tape is not acceptable.
23. The hot and cold water supply line branches for all lavatories, sinks, showers, tubs, and hose blobs shall have ]osam or Zurn
ROOFTOP UNITS
water hammer arresters installed on the high point at the end of each branch line.
DFU CALCULATIONS
SHALL BE BY
24. All above -ground water supply piping shall be Type L rigid copper. All below grade water supply piping shall be Type K soft
copper with at least 50' between joints. All joints shall be soldered with "lead-free" solder (e.g., 95-5).
LANDLORDS
25. Flush and sterilize water system after connections are made in accordance with local regulations.
Sanitary Fixtures
CONTRACTOR
Item Fixture Quan. DFUEach DFUTotal
26. All sanitary waste piping below slab shall be cast-iron or solid -wall PVC. Other DWV piping may be cast-iron or galvanized
P-I Water Closet - Tank Type 2 4 8
steel. PVC may NOT be used in demising walls and may NOT be used in return plenum ceilings.
P-2 Lavatory 2 1 2
t
Q
27. All Floor penetrations and all exterior penetrations shall be completely waterproofed, firesafed, and sealed. All pipe
P-3 Hand Sink 10 2 20
penetrations of fire noted assemblies shall be sleeved and sealed as required to maintain the sting of the assembly. Sleeves
P-4 late hen Sink 1 2 2
shall be used for all masonry penetrations. Proper sealing of penetrations as described here is the sole responsibility of the
SS Service Sink 1 3 3
plumbing contractor.
H- OF Drinking Fountain 2 0.5 1
28. All domestic water piping, vent piping and gas piping shall run above ceiling, LON. All sanitary and storm piping shall be run
Total Sanitary Drainage Fixture Units 36
under the Floor, UON.
Service size required at 1/8" per foot slope 4"
29. Existing piping shown on drawings Is based on original drawings, and location, mounting heights and points of connection
must be verified in field. All piping is new, UON. In general, do not abandon old piping - remove and dispose of properly,
unless inaccessible or under slab, or unless noted otherwise.
30. All water piping inside the building thermal envelope shall be insulated with jacketed fiberglass pipe insulation with sealed
seams (Owens Corning SSL-II or equal) as follows: Cold water, 1/2" thick insulation; hot watersupply and recirculation
piping 1.25" tlia and smaller, 1" thick insulation; hot watersupply and recirculation piping 1.5" tlia and larger, 1.5" thick
insulation.
31. In general, no hot and cold watersupply piping shall be run on cold side of insulation in outside walls, crawl space, attic, or
HW Vacuum Relief Valve
other unheated spaces. However, if domestic cold or hot piping is discovered to be routed through unheated areas, heat trace
`�Z ,y, 1
and insulate this piping with 2" minimum jacketed fiberglass pipe insulation with sealed seams to prevent freezing.
FIRE PROTECTION NOTES
CW-'�f
32. All sanitary sewer traps that are located outside the building thermal envelope in unheated areas shall be heat traced and
Expansion
insulated with 1" fiberglass minimum to prevent freezing. All heat tracing shall be controlled with a sensor on the coldest
- - Tank
Electric
portion of the piping and set to turn on if pipe temperature drops below 45F.
Water Heater
33. Provide and install LavGuard by Truebro, Inc. ADA compliant, vinyl coated with standard white finish, foam insulation on all
1. All fire protection systems shall be in accordance with NFPA regulations, and all local codes, including the requirements for
T/P Valve
exposed plumbing waste and supply connectors underneath all lavatories. If there are any instant water heaters,
transformers for hands -free devices, or any other sharp or abrasive objects under lavatory, provide and install full lavatory
backFlow protection.
shield (LavShield by Truebro, Inc. or equal), maintaining ADA required clearances under all lavatories.
1/2" threaded rod to
2. Building shall be fully sprinklered.
structure above
34. All interior horizontal and vertical storm and overflow piping, above slab, shall be insulated with 1" Owens Corning SSL-II
TYP-4
jacketed fiberglass pipe insulation with sealed seams.
3. Tenant space shall be fully sprinklered using the existing sprinklersystem. Sprinkler contractorshall prepare a fire
suppression plan showing pipe sizing, heads, hydraulic calculations, etc, for approval by fire marshal. No sprinkler work shall
Drain Valve
35. All horizontal branches and vents 3" in diameter and over shall be sloped at 1/8" per foot minimum, unless otherwise noted.
commence prior to obtaining approval of these drawings by fire marshal.
Platform
All horizontal branches and vents under 3" in diameter shall be sloped at 1/4" per foot minimum, unless otherwise noted
4. Sprinkler piping shall be coo Minatetl with ductwork, lights, structure and other piping. The sprinkler contractor shall have the
1• 1"
(UON).
responsibility for this coordination with other disciplines.
1" steel angle Drain Pan
bolted to rod
36. Plumbing contractor shall furnish record set of drawings with any deviations marked in red ink, within 90 days of system
Typica
acceptance.
S. Sprinkler heads shall be centered in the ceiling tiles.
p g
To mop sink
37. ALL submittals MUST be sent in pdf format, highlighted or reclined to indicate product full model number, including suffix and
RELEASED FOR CONSTRUCTION to the Architect.
WATER HEATER DETAIL_
P100 No Scale
'object to compliance with all regulations
of State and Local Codes
City of Camel
I
tA, . (�
aM Ln%'t......v._.1I
T.., I ,
DATE: 10/30/19
C HA
CRAIG
BENNETT
ASSOCIATES
ARCHITECTS
TENANT
MY EYE DR
1950 OLD GALLOWS RD
SUITE 520
VIENNA, VIRGINIA 20182
703-847-8899 FAX 866-414-6476
Contact: Suzanne Berardi -Gould
571-455-8191
ARCHITECT:
CBA ARCHITECTS, PC
1239 PINE HILL ROAD
McLEAN, VIRGINIA 22101
703-847-6900 FAX 847-6955
www.cba-urchiiecis.com
Contact: Craig Bennett
cbenneit@cba-architecis.com
703-975-2400
MEP ENGINEER:
DWYER ENGINEERING
552 FORT EVANS ROAD NE, #200
LEESBURG, VIRGINIA 20176
703-777-5988 FAX 703-439-2588
www.dwyer.com
Contact: Brian Davis
BDavis@dwyer.com
703-777-5988 EXT. 110
MY EYE DR
SHOPPES ON MAIN
SOUTHWEST CORNER OF
MAIN ST & GRAND AVE
CARMEL, INDIANA
t Owner Revision 10/07/19
For Permit 07/18/19
For Review 07/03/19
,\o jiGnylp
s4TEq""'
Nu 11
aTA 0
loons
ads
PLUMBING
N&
SC�HEDULBEOSS
SHEET
P100