HomeMy WebLinkAboutA106 Finish PlanTILE FLOORING FOR
(STONE PEA
MODERN— SIMPLY
OR SIMILAR,
PROVIDE TILE ON W/
48" AFF. VERIFY
WI
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Camel
DATE: 10/30/19
FINISH PLAN
SCALE 1 /4
91,-1"
**NOTE— ALL CONCRETE MUST
BE LEVELED, PREPPED, AND
SEALED BY CONTRACTOR
BEFORE CINEMATION DESIGN
CREW DOES THE INSTALL
8 MM RUBBER
FLOORING WITH
10% ORANGE
FLAKE,
•• PROVIDED AND INSTALLED BY
CINEMATION DESIGN
KARNDEAN LOOSELAY
LONGBOARD VINYL FLOORING —
SIMULATED WOOD
"PROVIDED AND INSTALLED BY
CINEMATION DESIGN
CURRAN
ARCHITECTURE
5719 LAWTON LOOP E. DR. #212
INDIANAPOLIS, IN 46216
O :: 317.288.0681
F :: 3I7. 288. 0753
No. 'y
• AR19600043 •
STATE v
EiPIKS
THIS DRAWING AND THE IDEAS. DESIGNS
AND CONCEPTS CONTAINED HERSH ARE
THE EXCLUSIVE INTflLECTUAL PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCE), WHOLE OR
IN PART, WITHOUT THE WRRTEN
CONSENT OF CURRAN ARCHITECTURE.
8 COPYY,�'.M3019, CUFA4NMCHIiECTURE
HOTWORX STUDIO
12525 OLD MERIDIAN STREET
SUITE 130
CARMEL, IN
HJTWORX
SET 10-02-19
190320
FINISH PLAN
M111•1