HomeMy WebLinkAboutA5.6 Details0"PREFINISHED, PREFABRICATED—
:TAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT H
(HODS AND AMOUNTS MUST BE
COORDINATED WITH COPING un
MANUFACTURER.
CONTINUOUS DRIP REVEAL -
EIFS SYSTEM SEE ELEVATIONS FOR REVEAL LOCATIONS
/ CONTINUOUS DRIP REVEAL —
EIFS COMPATIBLE BACKER ROD —
AND SEALANT
MODULAR BRICK VENEER —
2" EXTRUDED RIGID INSULATION, PROVIDE —
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
0
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT, ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER.
2" EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
MODULAR BRICK VENEER
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08/19/19
O
PREFINISHED, PREFABRICATED
O
SLOPE
METAL COPING WITH CONTINUOUS
SLOPE
GALVANIZED SEAT. ATTACHMENT H
T.O. WALL h METHODS AND AMOUNTS MUST BE >
SEE S� COORDINATED WITH COPING �n
TO WALL h
— _
_
___
SEE SECTIONS
WOOD Ni MANUFACTURER.
WOOD NAILER-2X
TRT'D. WOOD,
TRT'D. WOOD,
CONTINUOUS, OR TWO
CONTINUOUS, OR TWO
LAYERS OF TREATED =
LAYERS OF TREATED
J" PLYWOOD. STUD CONTINUOUS DRIP REVEAL
in PLYWOOD, STUD
FRAMING
FRAMING
TUBE STEEL, SEE
TUBE STEEL, SEE
STRUCTURAL EIFS SYSTEM SEE ELEVATIONS
STRUCTURAL
EXTEND MEMBRANE FOR REVEAL LOCATIONS 10
EXTEND MEMBRANE
SLOE
UP BACK OF
UP BACK OF
PARAPET, OVER
PARAPET, OVER
2"
NAILER AND SECURE CONTINUOUS DRIP REVEAL
NAILER AND SECURE
AT FRONT FACE OF
AT FRONT FACE OF
NAILER. —
NAILER.
F.R. PLYWOOD CONTINUOUS DRIP REVEAL
j
F.R. PLYWOOD
4
SHEATHING AT
SHEATHING AT
BACKSIDE OF
BACKSIDE OF
PARAPET EIFS COMPATIBLE BACKER R00
PARAPET
8" METAL STUD AND SEALANT
8" METAL STUD
FRAMING AT 16" O.C.
FRAMING AT 16' O.C.
L 6" METAL STUD MODULAR BRICK VENEER
3 5/8" METAL STUD
I'-3 1/2"
FRAMING 2" EXTRUDED RIGID INSULATION,
9 "
3"
10"
FRAMING
B.
PROVIDE MANUFACTURER'S JOINT
nnin—
DETAIL
9 TAPE. COVER WITH AIR
DETAIL
5
INFILTRATION BARRIER. TAPE AIR
BARRIER JOINTS
SLOPE
TO. WALL
\ SEE SECTIONS 'r
`WOOD NAILER-2% zic
TRYD. WOOD,
CONTINUOUS, OR TWO
LAYERS OF TREATED
I" PLYWOOD, STUD
FRAMING
EXTEND MEMBRANE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
\AT FRONT FACE OF
NAILER.
m naUL yr JL LZJPARAPET
17/771 8" METAL STUD
FRAMING AT I6" O.C.
DETAIL 10
I Ill" = I' 0"
INTERIOR GYP. BD. TO DECK
COLUMN, SEE STRUCTURAL
STUD FRAMING WITH
BLOCKING, TYPICAL
STOREFRONT FRAMING,
TYPICAL
CAULK, TYPICAL
EXTERIOR SHEATHING
DETAIL BRAKE METAL WRAP
1 Ill" = I' 0"
2" EXTRUDED RIGID INSULATION,
PROVIDE MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
MEMBRANE FLASHING
CONCRETE BLOCK
STAINLESS STEEL DRIP EDGE
LX" EXPANSION AND SEALANT
CONCRETE SIDEWALK, SEE CIVIL
4"
GROUT CAVITY SOLID
C Vii ' Q
DETAIL
EXTRUDED ALUMINUM
STOREFRONT
SHIM AS REQUIRED.
PROVIDE SEALANT AND
BACKER ROD AT
INSIDE AND OUTSIDE
OF FRAME.
CONTINUOUS SEALANT
2 EXPANSION JOINT AND
SEALANT
FINISH FLOOR
SEA' E SECTIONS d
EXTERIOR SHEATHING
8" METAL STUD FRAMING
AT 16" O.C. FILL SOLID
WITH BATTS INSU. SEE
SPECS.
3 5/8" METAL STUD FRAMING
VAPOR BARRIER, I" GYP.
BD. BY TENANT
ALIGN INTERIOR SIDE OF
STUD FRAMING WITH
INTERIOR BIDE OF CMU
No
No 11
moo 11
1101
1'
.'
MEMO
1101
omem
no
no
1
1 1
PREFINISHED, PREFABRICATED —
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE =
COORDINATED WITH COPING n
MANUFACTURER.
CONTINUOUS DRIP REVEAL -
EIFS SYSTEM SEE ELEVATIONS
FOR REVEAL LOCATIONS 1c
CONTINUOUS DRIP REVEAL
EIFS COMPATIBLE BACKER ROD
AND SEALANT
VERSETTA STONE PANEL
2" EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
2" EXTRUDED RIGID INSULATION,
PROVIDE MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
MEMBRANE FLASHING
ARCHITECTURAL PRECAST PANEL
STAINLESS STEEL DRIP EDGE
{" EXPANSION AND SEALANT
CONCRETE SIDEWALK, SEE CIVIL
DRAWINGS
FINISH FLOOR
SEES
4" CMU
GROUT CAVITY SOLID TYP.,
SEE STRUCTURAL DRAWINGS FOR ALL —
FOUNDATION AND FOOTING INFORMATION.
ALL ELEMENTS ARE SHOWN HERE FOR
REFERENCE ONLY
DETAIL
PREFINISHED, PREFABRICATED —
= METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER. -
SEE STRUCTURAL
FOR ALL SIPS,
AND SUBGRAIDE
REQUIREMENTS.
e i
d a I
e g
d° d Qa
d 4
d> ° d
I
CONCRETE SIDEWALK, SEE °
CIVIL DRAWINGS 4
d
° 4
SEE STRUCTURAL DRAWINGS FOR ALL d e
FOUNDATIONTIONAND FOOTING INFORMATION.
d
ALL ELEMENTS ARE SHOWN HERE FOR °
REFERENCE ONLY 4 °
4
DETAIL %
r� 1 112" = P-D"
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER.
CONTINUOUS DRIP REVEAL
EIFS SYSTEM SEE ELEVATIONS
FOR REVEAL LOCATIONS
EXTERIOR SHEATHING
CONTINUOUS DRIP REVEAL
EIFS COMPATIBLE BACKER ROD
AND SEALANT
VERSETTA STONE PANEL
2" EXTRUDED RIGID INSULATION, PROWDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
2" RIGID
PERIMETER
INSULATION.
EXTEND TO
BOTTOM OF
FOUNDATION.
AT STOREFRONT
LOCATIONS,
EXTEND
HORIZONTALLY
UNDER SLAB
4'-0" MIN.
SLOPE
T.O. WALL h
rift—
SEE SECTIONS
WOOD Ni
TRT'D. WOOD,
CONTINUOUS, OR TWO
LAYERS OF TREATED
i" PLYWOOD. STUD
FRAMING
TUBE STEEL, SEE
STRUCTURAL
EXTEND MEMBRANE
SLOPE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
1"
AT FRONT FACE OF
NAILER.
F.R. PLYWOOD
SHEATHING AT
BACKSIDE OF
PARAPET
8"
9 1/2"
B" METAL STUD
FRAMING AT 16" O.C.
3 5/8" METAL STUD
DETAIL
O FRAMING
11!2' = 1'-0: .....
PROVIDE
ALTERNATE FOR CORNICE i0 —BEI
CONTINUOUS DRIP REVEAL —
DIES SYSTEM SEE ELEVATIONS —
FOR REVEAL LOCATIONS .-
SLOPE
EI
WALL hSESEWONAILER-1%TR. WOOIN
D.COINUOUS. OR TWOLAS OF TREATEDj"YWOOD, STUDFRNGTUSTEEL, SEESTTURALE%D MEMBRANE CURRAN
p1[UPACK OFPAET, OVERNAR AND SECUREATONT FACE OFF.RNAILEP. ARCHITECTURE
F.RLYWOODSHHING AT 5719 LAWTON LOOP E. DR. #212
BAIDE OFPAET INDIANAPOLIS, IN 4626
8"TAL STUD O :: 317. 288. 0681
FRNG AT 16" O.0 F :: 317. 288.0753
3 8" METAL STUDFRING
EXTERIOR SHEATHING 0
'8" METAL STUD FRAMING
AT 16" O.C. FILL SOLID
WITH BATTS INSU. SEE
SPECS.
3 5/8" METAL STUD FRAMING
'VAPOR BARRIER, r GYP.
BE. BY TENANT
ALIGN INTERIOR SIDE OF
STUD FRAMING WITH
INTERIOR SIDE OF CMU
it
SEE STRUCTURAL
FOR ALL SLAB,
AND SUBGRADE
REQUIREMENTS.
a 2" RIGID
a d PERIMETER
ICI
k0JIr 1 1
°AyIN CO, h�
a
yt,Q'.p F ucx .Q
INSULATION.
EXTEND TO
No.
a BOTTOM of
-• AR19600043'. •
44 a FOUNDATION.
-
—
i. SiAIE !f
onnJ CONTINUOUS DRIP REVEAL 3"
EIFS COMPATIBLE BACKER ROD
AND SEALANT
SOLDIER COURSE BRICK
2" EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS 4" I1"
MODULAR BRICK VENEER w
SLOPE
1 1I2' = T-T
T.O. WALL
SEE SECTIONS 'r
WOOD Ni
TRITE. WOOD,
CONTINUOUS, OR TWO
LAYERS OF TREATED
J" PLYWOOD, STUD
FRAMING
TUBE STEEL, SEE
STRUCTURAL
.—EXTEND MEMBRANE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
NAILER.
BACKSIDE OF
PARAPET
8" METAL STUD
FRAMING AT 16" O.C.
THIS DMWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTIAL PROPERTY
OF CURRAN ARCHRECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN MCHRECIURE.
O WPY T 2019. CLAWNAROIITEMPE
WESTON POINTE RETAIL
WESTON POINTE DRIVE
4455 WESTON POINTE DRIVE
CARMEL INDIANA
PROVIDE ALTERNATE FOR CORNICE TO BE I 112"= 1 0°
ALL FOAM TYPICAL. SEE DETAIL 12 A5.6
2" EXTRUDED RIGID INSULATION,
PROVIDE MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION EXTERIOR SHEATHING
BARRIER. TAPE AIR BARRIER JOINTS I 8" METAL STUD FRAMING
MEMBRANE FLASHING I AT 16" O.C. FILL SOLID
CONCRETE BLOCK I WITH BATTS INSU. SEESPE.
STAINLESS STEEL DRIP EDGE I CARMEL RESUBMITTAL 04,07,17
VAPOR BARRIER, �" GYP.
}" EXPANSION AND SEALANT BD. BY TENANT CARMEL COMMENTS O4.27,17
CONCRETE SIDEWALK, SEE CIVIL I ALIGN INTERIOR SIDE OF PERMIT SET 07.17,17
DRAWINGS I STUD FRAMING WITH
INTERIOR SIDE OF CMU QBID SET 08.31,17
A FINISH FLOOR J QADDENDUM 01 09.22,17
SEE SECTIONS >
° d PERMIT SET 05.21,19
4
SEE STRUCTURAL
FOR ALL SLAB,
AND SUBGRADE
4" CMU REQUIREMENTS.
GROUT CAVITY SOLID TYP. 4 2" RIGID
160273
SEE STRUCTURAL DRAWINGS FOR ALL Ll PERIMETER
FOUNDATION AND FOOTING INFORMATION. INSULATION. DETAILS
ALL ELEMENTS ARE SHOWN HERE FOR a EXTEND TO
REFERENCE ONLY 4 a BOTTOM OF
4 4 FOUNDATION. •
DETAIL 4
I Ill" = T-Om