Loading...
HomeMy WebLinkAboutM0.2 Shell Mechanical SpecsCOMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Prided llNorm,'In Emyv Goa: 911(21007) sumac Mnl.Hna: WESTON POINTE RETAIL Loriellon womm. Indiana ClanwasZone. as Preaa)ma: NEW construl Sim canwhydert NORTMEMMKOHIWH ROM IOrl pride Carmen anME,IN our OEVELOMENT, LEE Curran nnnlcernre IN 57193LAWTON LOOP E OR. IFARe1 RDFOEVELOPMENT.COM 6216 ONEWO-0 eE lx Mechanical Bya S List Y...TV 6Yabm Typ, 6 onsnlWm 6 our 1, T a6(apple Sued NO call w�� havarall applies pyley - 74 kintah. Andsodeal Cummnr ,,Sygw Now Fnot 29 z I5Mu]ma): many 1 cn - goer Gec Cooly - to re W n NO crears' cat 1l Poual Oxon CPoxkv- 0 verse, AnstadW CpMmeei MCPceee E�inLpew- tz.m EER, Ramose Emda.,y. t Mao EER Fan6„Iap: New z t5isimle Zdwb wason I call Other Go,, Newly -64 k6a,m peon- 3e x6N,m. Scroll Commet hil Now Pi aLSend ZION HINIn 1 will (and, Al Pibly 6M ours Ed all 9glec ieaa o Ln6, Dapmv-s Canyon... ��.ed effica�ce- tSW SEER R.mn.d Effi ry: 1z.m SEER Fan9vamn: Now MwM1anlul Compliance Si mwt Comylhnu statement, The pmpmea mechanical design represented In this document Is consistent with the Wlmly plans, SENClfiea nee with the permN apdireum. The Standard reaehOm lent¢ re teen deagnetl IN n old i (NoonStandard regutr.manta In COMmick Vemm 4.1.2.0 and w comply with any a hand mamawry equipment, dated in the lauxamIon Cbeadin. WESTON POINTE RETAIL I Ferri date 05119119 Cate fllmeme: l2TESFSOIRESdiliEIN VEArthNMmeWemMI IN RtteitEnlrcebn [tenluMKUII BUIWi Po 31<wn[NecMCOMCNECKENLOFE 1fi0l]3.xk 9 gV1e Mate lol 9 /COMcheck Software Version 4.1.1.0 Inspection Checklist V Energy Code: 90.1 2007 Standard add RCDOireme Co: 100.0%were oohs column n is provided d b COMCM1e[k wRware reM'm[M1e"Caeuser erfifimphes at Y' colu Inn iszrement by the uulinthe COMCNNkumeited, or tscreen.For NdI Stein claimed. Where compliance Is Itemizcode ed in a separatelhe nubt cable,areferenced how toetbattable provided,hat an exceptlm Plan llwMl Counda ] CmmntyRswnlpabna 6per Ee Dmpnea Regunma II . be mat. .akulationasprovide all irearmadon Dow, (^ZI'wth which managers can towdetermined I;a onm Deaarvame I,, the oxotApptaable rtwnederm newe mine: mme mnuyno.re delmre, that per on ptable Icard :emimuka° sranama and au, I Plans, acecicaepns. anew C 'reells I Regulrcmmt all Inn. 741 ukulatlom prevke all inbtmeupn DOOR Net IMUIs with which compliance can M DxosOdxrvede Obm"ble 'I Itlmnnined For the servou water I beating systems and equ l pment and Not I document where exceIons b the „at warnedpystion : waepmaanufacs ; 9c ocomphm ;Requltem.ntwlt be man IPRp� commissioning ce Done I car project. oxo e soaoprtRsp om eppn�bl Additional CommentirAssumptions: Persorl WESTON POINTS RETAIL Far t eae: osr19n9 Wta fllmame: WESF501\TEY6mtACurtan Arbooedwenspar l IN RetaiNEngineetln9Vlechanhuhipwall bond 9e 300 9 3Kwnche[MCOMCHECKENVEIOPE1602]3.xk RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes CiityLLGF Centel �VT�t�G1t141WML DATE: 08/19/19 Lawr rce M. Thomas, PE 6� C �5/28/19 w ons,. W NPOINTE RETML Rpprtmm: W39rt9 OA fllmame:\REYSELOTEScIIenCKunder, [NMCemIN IN MMII1 911 MnMNxhwk tell BUIMI Page 201 9 P.CenMe[xt WHE ENVELOPE 160273.uk MECHANICAL SPECIFICATIONS L GENERAL PROVISIONS A.GENERAL CONDITIONS, CODES 8 STANDARDS 1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND ANY OF THE OWNER'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE. 2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS REGARDING; SAFETY, COORDINATION 8 COOPERATION, WORKMANSHIP, PROTECTION, CUTTING AND PATCHING, DAMAGE TO OTHER NARK, PRELIMINARY OPERATIONS, STORAGE, ADJUSTMENTS, CLEANING, ETC. 3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL, STATE, AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE OWNER REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. 4. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND INSPECTIONS REWIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REWIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS. B.SCOPE OF WORK 1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE MECHANICAL AND PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE OWNER A COMPLETE, CODE APPROVED AND OPERATIONAL MECHANICAL AND PLUMBING SYSTEMS. 2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH ALL TRADES' WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID INTERFERENCES. MY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER BEFORE NARK IS COMMENCED. 3. CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS, NOTE THE EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED, AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NO ALLOWANCE SHALL BE MADE TO THE CONTRACTOR BY REASON OF THIS FAILURE TO HAVE MADE SUCH EXAMINATION OR OF MY ERROR ON HIS PART. 4. ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE OWNER. 5. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS WITH THE GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL DUCT AND LOUVER OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. 6. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND OWNER. WHERE AN EQUIPMENT MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT. C. DOCUMENTS 1. THE DRAWINGS ME DIAGRAANATIC ALL WORK SHALL BE PERFORMED AS INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES, THESE CHANGES SHALL BE MADE WITH NO ADDITIONAL COST TO THE OWNER, 2. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID. 3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH. 4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR BETWEEN ME SAME, W BETWEEN THE FIGURES ON ME DRAWINGS, AND ME SCALE OF SAME OR BETWEEN THE LARGER AND SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS SHALL BE REFERRED TO THE OWNER FOR REVIEW AND FINAL DECISION PRIOR TO THE BID WE DATE. 5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL AND MUST BE SUBMITTED AS SPECIFIED IN THE ARCHITECTURAL DOCUMENTS. 6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF MY RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. D.00ORDINATION 1. CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT MY EXISTING SERVICES WHICH ME REWIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE, 2. EACH CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS OR HIS SUB -TRADE'S PERSONNEL. ALL PATCHING, REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE OWNER BY THE CRAFTSMEN OF THE TRADES INVOLVED, THE COSTS OF SUCH WORK SHALL BE PAID BY ME CONTRACTOR CAUSING ME DAMAGE. E. METHODS 1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAY OUT. PIPING SHALL BE LAID W AN APPROPRIATELY GRADED 6' BED OF CLEAN AND WY SAND. ENGINEERED FILL SHALL BE USED TO BA09ILL TO 6' ABOVE ME PIPING. BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE OWNER. IF THE EXCAVATED MATERIALS ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL THE REMAINDER OF THE TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN By LIFTS WITH ALL LIFTS COMPACTED TO 95% PROCTOR. PATCH FLOOR TO MATCH EXISTING. 2. EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM MY CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL ENGINEER. 3. ALL ROOF PENETRATIONS, FLASHINGS AND COUNTER FLASHINGS SHALL BE PERFORMED BY THE OWNER'S ROOFING CONTRACTOR AT THE REQUESTING CONTRACTORS COST. F. SUBMITTAM 1. SHOP ORAWINGS SHALL BE PROVIDED TO THE ARCHITECT OF ALL EQUIPMENT AND ACCESSORIES PROVIDED FOR ME PROJECT WHETHER SPECIFIED HERE -IN OR ON THE DRAWINGS. REVIEW OF ME SHOP DRAWINGS SHALL BE FOR GENERAL DESIGN CONCEPT AND ADHERENCE WITH THE SPECIFICATIONS. QUANTITY OF SHOP DRAWINGS SUBMITTED SHALL BE AS SPECIFIED BY THE ARCHITECT, SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR SHOWING LOCATIONS AND MEASUREMENTS FROM COLUMNS OF ALL CONCEALED AND EXPOSED PIPING, DUCTWORK, CONCH IT, EQUIPMENT, ACCESSORIES, ETC., AND SUBMITTED PRIOR TO INSTALLATION. THE OWNER MAY MARE REPRODUCIBLE COPIES OF THEIR DRAWINGS AVAILABLE FOR USE IN PREPARATION OF SHOP DRAWINGS, HOWEVER THE OWNER SHALL NOT BE HELD RESPONSIBLE FOR NOT CONFIRMING ALL INFORMATION ON THE DRAWINGS PRIOR TO FABRICATION AND/OP INSTALLATION. 2. PROJECT RECORD DOCUMENTS - MAINTAIN AT THE JOBSITE WE COPY OF ALL CONTRACT DOCUMENTS CLEARLY MARKED AS 'PROJECT RECORD COPY". THESE DRAWINGS ME TO BE MAINTAINED IN GOOD CONDITION, UPDATED DAILY FOR CHANGES ENCOUNTERED AND AVAILABLE AT ALL TIMES FOR INSPECTION BY THE OWNER. DO NOT USE FOR FIELD CONSTRUCTION! PROJECT RECORD DOCUMENTS ARE TO BE KEPT CURRENT WITH EXACT DIMENSIONS OF ALL WORK, EQUIPMENT, PIPING, VALVES, DUCTWORK, ETC. MARK ALL INFORMATION IN RED LINES AND NOTES SO AS TO BE EASILY IDENTIFIED FROM THE BASE WANING. UPON COMPLETION OF THE WORK, ONE SET OF THESE DOCUMENTS SHALL BE TURNED OVER TO THE OWNER AS ONE QUALIFICATION FOR FINAL PAYMENT. 3. AFTER THE BALANCING AND ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER, THREE COMPLETE SETS OF AS -BUILT DOCUMENTATION SHALL BE PROVIDED. IT SHALL INCLUDE, BUT NOT BE LIMITED TO ACCURATE PLAN DRAWINGS, SYSTEM AND CONTROL SCHEMATICS, SEQUENCE OF OPERATION, WIRING DIAGRAMS AND OPERATION AND MAINTENANCE MANUALS. IT. INSULATION A.GENERAL 1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. 2. CLEAN AND DRY SURFACES PRIOR TO INSULATING. 3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, HANGERS AND SIMILAR PENETRATIONS. 4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. S. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. SEAL ALL PENETRATIONS OF ME VAPOR BARRIER BY STAPLES, HANGERS OR WHERE OTHERWISE DAMAGED. 6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. 7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE. B.HVAC PIPING 1. PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ABMISSL), a. INTERIOR APPLICATION (1) CONDENSATE WATER PIPING - 1/2 INCH THICK 2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING COVER. C. HVAC DUCTWORK 1. INTERNALLY INSULATE WITH 1 INCH THICK, 1-1/2# DENSITY ACOUSTICAL INSULATION (AIR SIDE BLACK COATED TO MEET NFPA) ALL DUCTWORK NOTED AS REQUIRING SUCH. INTERNAL INSULATION SHALL BE INSTALLED PER THE REQUIREMENTS OF ME SMACHA GUIDE AND THE MANUFACTURER'S RECOMMENDATIONS. DUCT SIZES NOTED ON DRAWING ARE SHEET METAL DIMENSIONS. 2. ALL UNEXPOSED SUPPLY DUCTWORK SHALL BE WRAPPED WITH 1-1/2 INCH OF 0.75 LB/CU.FT. FIBERGLASS, FOIL BACKED DUCT WRAPPING. 3. ALL KITCHEN HOOD EXHAUST DUCTWORK SHALL BE INSULATED WITH ETS FLAME SHIELD FIRE STOP BLANKET OR 3M FIRE BARRIER BLANKET. D.PLUMBING 1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ASJISSL). a. DOMESTIC HOT AND COLD WATER PIPING - 1 INCH THICK. b. NON -VERTICAL (INCLUDING ELBOWS) RAINWATER LEADERS, OVERFLOW RAINWATER LEADERS, WIN AND MIES - 1 INCH THICK 2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING COVER. 3. SEE FIXTURE SPECIFICATIONS FOR BARRIER FREE REQUIREMENTS. III. PLUMBING q, :R6LD.1E 1. THE ENTIRE PLUMBING INSTALLATIONMATERIALS EQUIPMENT ETC. SHALL CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING CODE, ME INTERNATIONAL PLUMBING CODE, THE AMERICAN DISABILITIES ACT GUIDELINES, AND ANSI A117.1 REQUIREMENTS FOR THE PHYSICALLY CHALLENGED AND THE UNIFORM FEDERAL ACCESSIBILITY STANDARDS DFAS). CONTRACTOR TO VERIFY ALL PLUMBING ROUGH IN DIMENSIONS MEET ME ABOVE NOTED REQUIREMENTS. VERIFY FINAL ROUGH IN WITH ARCHITECT PRIOR TO BACKFILLING OR WALL INSTALLATION. 2. TEST ALL SEWER AND WATER PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. 3. FURNISH ACCESS DOORS FOR WALL CLEAN OUTS AND VALVES IN WALLS. 4. ALL FIXTURES AND EQUIPMENT NOT SPECIFIED HERE -IN ARE BEING PROVIDED BY OTHERS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ROUGHING IN ALL SERVICES FOR ALL EQUIPMENT WHETHER PROVIDED BY THIS CONTRACTOR OR OTHERS. CONTRACTOR SHALL COORDINATE HIS INSTALLATION WITH THE APPROPRIATE EQUIPMENT SUPPLIER FOR PROPER ROUGH IN INFORMATION AND SHALL REVISE ME DESIGN AS REQUIRED TO MATCH THE EQUIPMENT BEING SUPPLIED. THIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS INCLUDING BUT NOT LIMITED TO; ALL WATER OR NATURAL GAS CONNECTIONS FROM APPROPRIATE STOP OR VALVE, ALL DIRECT SANITARY CONNECTIONS, ALL INDIRECT WASTE CONNECTIONS TO FLOOR GRAINS OR SINKS FROM SINKS OR EQUIPMENT, WALK-IN COOLER AND FREEZER COIL CONDENSATE WAIN PIPING, ETC. 5. FIRE STOPPING - REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL CONSTRUCTION DESIGN NUMBER, FOR RATED MASONRY WALL AND FLOOR ASSEMBLIES, PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER C-Ai-1175. FOR RATED GYPSUM BOARD ASSEMBLIES, PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER W-L-1003. B.PIPING 1. PIPE HANGERS FOR ME PLUMBING SYSTEM SHALL BE ADJUSTABLE CLEVIS HANGERS WITH APPROPRIATE CLAMP. ALL PIPING SHALL BE SUPPORTED ON A MAXIMUM SPACING OF: a. 6' CENTERS FOR PIPING 3/4e AND SMALLER. D. 8' CENTERS FOR 1" PIPING. C. 10' CENTERS FOR PIPING LARGER THAN 1'. d. PIPING ABOVE THE ROOF SHALL BE SUPPORTED PER THE DETAIL ON THE DRAWINGS. e. PIPE HANGERS FOR INSULATED PIPING SYSTEMS SHALL BE SIZED FOR THE GROSS OUTSIDE DIMENSION OF ME PIPE AND INSULATION. SEE INSULATION SPECIFICATIONS FOR INSULATION REQUIREMENTS. C. SAN ITARY AND VENT 1. ALL PIPING SHALL PITCH TO ITS APPROPRIATE RAIN AT NO LESS THAN 1/8' PER FOOT SLOPE. 2. UNDERGROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON HUB AND SPIGOT PIPE WITH COMPRESSION GASKET JOINTS OR SCHEDULE 40 M PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. 3. ABOVE GROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON NO -HUB PIPE WITH STAINLESS STEEL BANDED JOINTS AND BE HUNG PER C. I.S.P.I. REQUIREMENTS OR SCHEDULE 40 GWV PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. a. PVC PIPING SHALL NOT BE INSTALLED IN A RETURN AIR PLENUM. 4. SANITARY PIPING EXTERIOR TO ME BUILDING AREA SHALL BE SCHEDULE 80 DWV PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. S. ALL ABOVE GROUND GREASY WASTE PIPING SHALL BE SERVICE WEIGHT CAST IRON NO -HUB PIPE WITH STAINLESS STEEL BANDED JOINTS AND BE HUNG PER C. I.S.P,I. REQUIREMENTS. ALL PIPING SHALL PITCH TO THE GREASE TRAP AT NO LESS THAN 114e PER FOOT SLOPE. D. DOMESTIC WATER 1. CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER AND ME LOCAL WATER COMPANY FOR ME INSTALLATION OF A NEW WATER SERVICE. THIS SHALL INCLUDE ME FEES/COSTS AND INSTALLATION OF A NEW WATER METER AS SHOWN ON THE PLANS AND THE ASSOCIATED REMOTE READER, THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL WATER COMPANY. LOCATE REMOTE READER AT BUILDING OWNER'S AND WATER COMPANY'S DIRECTION. 2. TEST WATER PIPING TO HYDROSTATIC PRESSURE OF 100 PSIG. FOR TWO HOURS. STERILIZE ALL DOMESTIC WATER PIPING IN ACCORDANCE WITH A.W.W.A. STANDARDS. 3. UNDERGROUND WATER PIPING, 2-1I2- AND LARGER, SHALL BE DUCTILE -IRON PIPE AND FITTINGS CONFORMING TO ANSI A21.51 AND ANA C111 RUBBER GASKET JOINTS. 4. UNDERGROUND WATER PIPING, 2- AND SMALLER, SHALL BE TYPE "K" SOFT COPPER TUBE OR HARD DRAWN PIPE WITH SILVER BRAZED JOINTS (SIL-FOS 15). 5. ABOVE GROUND WATER PIPING, 4- AND LARGER, SHALL BE SCHEDULE 405 ASTM A120 GALVANIZED STEEL PIPE WITH MECHANICAL GROOVED PIPE COUPLINGS AND FITTINGS. 6. ABOVE GROUND WATER PIPING, 3- AND SMALLER, SHALL BE TYPE 'Is HARD DRAWN COPPER PIPE WITH WROUGHT COPPER FITTINGS AND 95-5 SOLDERED JOINTS. AS AN ALTERNATE THE CONTRACTOR MAY UTILIZE COPPER PRESS FITTINGS (PROPRESS SYSTEM) AS MANUFACTURED BY VIEGA. FITTINGS SHALL CONFORM TO THE MATERIAL AND SIZING REQUIREMENTS OF ASME B16.18 OR ASME B16.22. 0-RINGS FOR FITTINGS SHALL BE EDPAI. INSTALLATION OF FITTINGS SHALL CONFORM TO CODE AND THE MANUFACTURER'S SPECIFICATIONS/REQUIREMENTS. WATER PIPING JOINTS BETWEEN DIFFERENT MATERIALS SHALL BE PER ME _COOLLY ENFORCED PLUMBING CODE SECTION 605.22. 7. DOMESTIC WATER VALVES SHALL BE AS FOLLOWS: a. 2e AND SMALLER SHALL BE MILWAUKEE VALVE #BA-100 OR lIBA-150 BALL VALVE b. 2-1I2' AND LARGER SHALL BE MILWAUKEE VALVE III GATE VALVE. E. NATURAL GAS SYSTEMS 1. GENERAL a. CONTRACTOR SHALL COORDINATE WITH THE LOCAL GAS COMPANY TO PROVIDE A NEW SERVICE FOR THE BUILDING. THIS SHALL INCLUDE THE INSTALLATION OF A NEW REGULATOR AND METER (AS REQUIRED) WITH A NEW HOUSE LINE. THE ENTIRE INSTALLATION SHALL CONFORM TO ME GAS COMPANY REQUIREMENTS. ALL FEES AND/OR COSTS ASSOCIATED WITH THE GAS SERVICE AND METER SHALL BE PAID BY ME CONTRACTOR. 2, PIPING a. NATURAL GAS PIPING MATERIAL, JOINTS AND INSTALLATION SHALL MEET THE REQUIREMENTS OF THE LOCALLY ENFORCED INTERNATIONAL FUEL AND GAS CODE, THE UTILITY COMPANY REQUIREMENTS AND ANY OTHER AUTHORITIES HAVING JURISDICTION. D. ALL ELEVATION CHANGES AND CONNECTIONS TO EQUIPMENT SHALL HAVE A 6' DEEP DRIP LEG, c. PROVIDE A FULL SIZE GAS SHUT-OFF VALVE AND GROUND JOINT UNION AT ALL CONNECTIONS TO GAS FIRED EQUIPMENT. d. IN NO CASE MAY A VALVE BE INSTALLED IN A RETURN AIR PLENUM. e. ABOVEGROUND NATURAL GAS PIPING SHALL BE: (1) 2' AND SMALLER: SCHEDULE 40 BLACK STEEL PIPE WITH THREAD JOINTS AND MALLEABLE IRON FITTINGS. (2) 2-1/2' AND LARGER: SCHEDULE 40 BLACK STEEL PIPE WITH WROUGHT STEEL BUTEWELD FITTINGS. f. GAS SHUT-OFF VALVES SHALL BE: (1) 1' AND SMALLER: 125 LB. IRON BODY WITH BRONZE PLUG WASHER. CRANE # 320 OR HOMESTEAD At 601. (2) 1-1/4' AND LARGER: LUBRICATED PLUG COOK. NOROSTRUM # 142 OR HOMESTEAD 602. (3) W APPROVED EQUAL VALVES BY NIBOO, LUNKENHEIMER, STOOKHAM OR POWELL. IV. HVAC A. GENERAL 1. THE PROJECT CONSISTS OF THE INSTALLATION OF ROOFTOP UNITS AND ALL RELATED MECHANICAL COMPONENTS AND DUCTWORK. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, ETC. MUST BE FIELD VERIFIED FOR EXACT LOCATION. B. PIPING 1. OUTDOOR CONDENSATE PIPING SHALL BE TYPE PLO COPPER CONDENSATE WAIN FOR THE ROOFTOP MOUNTED AIR CONDITIONING UNIT, INSTALLED PER THE MANUFACTURERS REQUIREMENTS AND DETAILS. DRAIN SHALL DISCHARGE INTO A ROOF DRAIN. 2. FIRE STOPPING - FOR INSULATED PIPES THROUGH RATED MASONRY WALL AND FLOOR ASSEMBLIES, PROVIDE A UL APPROVED THROUGHPENETRATIONSIIU INTUMESCENT FIRE STOP SYSTEM #C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER W-L-1003. OR OR PRODUCTS BY NATIONALLY APPROVED MANUFACTURERS AS USG AND HILTI. 3. AFTER INSTALLATION IS COMPLETED REMOVE5 CLEAN AND REPLACE STRAINER SCREENS, ISOLATE EQUIPMENT THAT IS NOT SUBJECTED TO TEST PRESSURE FROM PIPING. SUBJECT PIPING SYSTEM TO HYDROSTATIC TEST PRESSURE THAT IS NOT LESS THAN 1.5 TIMES THE DESIGN PRESSURE. CHECK JOINTS AFTER 10 MINUTES OF TESTING AND ELIMINATE LEAKS. REPEAT TEST IF LEAKS WERE REPAIRED. AFTER CLEANING, FLUSHING AND TESTING, BUT BEFORE BALANCING, REMOVE DISPOSABLE FINE -MESH STRAINERS IN PUMP SUCTION DIFFUSERS. FILL SYSTEM 30% ETHYLENE GLYCOL AND PERFORM INITIAL CHEMICAL TREATMENT. C. DUCTWORK AND AIR DISTRIBUTION 1. DUCTWORK (ROUND OR RECTANGULAR OR SPIRAL) SHALL BE OF GALVANIZED STEEL CONSTRUCTION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE Bill MANUAL AND THE FOLLOWING PRESSURE / SEAL SCHEDULE: a. SUPPLY AIR DUCTWORK - 2- W.G. POSITIVE PRESSURE, SEAL CLASS B. N. RETURN DUCTWORK - 2e W.G. NEGATIVE PRESSURE, SEAL CLASS B. 2. FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF THE RTU. INSTALL FLEXIBLE CONNECTIONS WITH 3- WIDE DOUBLE NEOPRENE COATED FLAME RETARDANT, NFPA 90A APPROVED, FIBERGLASS FLEXIBLE CONNECTION. FLEXIBLE CONNECTION TO HAVE A MINIMUM OF 24 GAGE, 3- WIDE SHEET METAL COLLARS PERMANENTLY ATTACHED TO EACH SIDE. 3. PROVIDE 3ex3exllate ANGLE FRAMING AROUND ME ROOF OPENINGS FOR THE SUPPLY AND RETURN AIR DUCTWORK. 4. SUPPORT ALL SHEET METAL AND EQUIPMENT FROM ANGLE IRON CONNECTED TO STRUCTURAI STEEL. CO NOT SUSPEND DUCT OR EQUIPMENT FROM METAL DECK OR JOIST BRIDGING. V.HVAC EQUIPMENT A. GENERAL 1. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH ME MANUFACTURER'S INSTALLATION INFORMATION AND INSTRUCTIONS, REQUIREMENTS AND ANY ADDITIONAL GUIDELINES. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL REQUIRED ACCESSORIES REQUIRED TO COMPLETE ME INSTALLATIONS. 2. HVAC EQUIPMENT SHALL BE 'STARTED UPe BY A FACTORY TRAINED AND AUTHORIZED SERVICE TECHNICIAN. 3. ALL FACTORY STARTUP FORMS SHALL BE COMPLETED AND TURNED OVER TO THE OWNER WITH ALL COMPLETED WARRANTY CARDS PRIOR TO FINAL APPROVAL. B.PACKAGE ROOFTOP HEATING AND AIR-CONDITIONING UNITS 1. SEE DRAWING FOR INDIVIDUAL UNIT PERFORMANCE REQUIREMENTS. 2. UNIT SHALL BE OF ONE-PIECE PACKAGED CONSTRUCTION COMPLETELY ASSEMBLED, WIRED AND FACTORY TESTED. 3. WIRING SHALL COMPLY WITH LATEST EDITION OF ME NEC AND SHALL INCORPORATE 3-LEG OVERLOAD PROTECTION FOR THE COMPRESSOR(S). 4. UNIT SHALL BE COMPLETE WITH PRESSURE SAFETY CONTROLS, ANTI -SHORT CYCLE PROTECTION AND CONTROLS (WHEN SPECIFICALLY NOTED ON THE DRAWINGS). VIII. LABELING A.SUMMARY 1. SECTION INCLUDES NAMEPLATES B.REFERENCES 1, ASME A13.1 (AMERICAN SOCIETY OF MECHANICAL ENGINEERS) - SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS. C. NAMEPLATES 1. PRODUCT DESCRIPTION: LAMINATED THREE -LAYER PLASTIC WITH ENGRAVED BLACK LETTERS ON LIGHT CONTRASTING BACKGROUND COLOR. D.PREPARATIOM 1. DECREASE AND CLEAN SURFACES TO RECEIVE ADHESIVE FOR IDENTIFICATION MATERIALS. E.INSTALLATIW 1. INSTALL IDENTIFYING DEVICES AFTER COMPLETION OF COVERINGS AND PAINTING. 2. INSTALL PLASTIC NAMEPLATES WITH CORROSIVE -RESISTANT MECHANICAL FASTENERS, OR ADHESIVE. CURRAN ARCHITECTURE 5719 LAWTON LOOP E. DR. #212 INDIANAPOLIS, IN 46216 O :: 317.288.0681 F :: 317.288.0753 DRAWN BY: JES CHECKED BY: KW *T/E/S ENGINEERING 25760 First Street Cleveland, OH 44145 P 440 8712410 F 440 8717954 tesengineering.com :W ac % •. STATE OFP. a W T Z2� 0 H N AI AY THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE IXQUMVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECT AND ARE NOT TO BE USED OR REIRODUCED, WHOM OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHTECTURE � cCPY0.Kifiiol6.CUiWNAR(HIIECNPE WESTON POINTE RETAIL WESTON POINTE DRIVE NORTH MICHIGAN ROAD CARMEL, INDIANA SHELL MECHANICAL SPECIFICATIONS CARMEL RESUBMITTAL 04.07.17 CARMEL COMMENTS O4.27.17 ADDENDUM 1 09.22.17 PERMIT SET 05.21.19 160273 M=0.2