HomeMy WebLinkAboutA5.6 Load DetailsRELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Camel
DATE: 08/19/19
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER.
EIFS SYSTEM SEE ELEVATIONS
FOR REVEAL LOCATIONS
CONTINUOUS DRIP REVEAL
CONTINUOUS DRIP REVEAL
EIFS COMPATIBLE BACKER ROD
AND SEALANT
2" EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER, TAPE AIR BARRIER JOINTS
VERSETTA STONE PANEL
N
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
-
GALVANIZED SEAT. ATTACHMENT
'
T.O.WALL
METHODS AND AMOUNTS MUST BE
SEE SECT
COORDINATED WITH COPING
ue
MANUFACTURER.
WOOD NAILEI
TRT'D. WOOD,
EIFS SYSTEM SEE ELEVATIONS
—
CONTIN000S, OR TWO
FOR REVEAL LOCATIONS
LAYERS OF TREATED
Jj" PLYWOOD. STUD
CONTINUOUS DRIP REVEAL
—
FRAMING
TUBE STEEL, SEE
STRUCTURAL
C
EXTEND MEMBRANE
,n
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
CONTINUOUS DRIP REVEAL
—
NAILER.
EIFS COMPATIBLE BACKER ROD—
F.R. PLYWOOD
AND SEALANT
SHEATHING AT
SOLDIER COURSE BRICK
—
BACKSIDE OF
PARAPET
EXTRUDED RIGID INSULATION, PROVIDE
—
6" METAL STUD
MANUFACTURER'S JOINT TAPE.
FRAMING AT 16" O.C.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
MODULAR BRICK VENEER—
ALTER
FOR CORNICE TO
/1L PROVIDE ALTERNATE FOR C RNICE
BE ALL E
TAIL 9/A5.6
FOAM, SEE DETAI
0 i
2" EXTRUDED RIGID INSULATION,
2" EXTRUDED RIGID INSULAPION,
PROVIDE MANUFACTURERS JOINT TAPE.
RS JOINT TAPE.
PROVIDE COVER
COVER WITH AIR INFILTRATION
EXTERIOR SHEATHING
WITH
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
6" METAL STUD FRAMING
BARRIER. TAPE AIR BARRIER JOINTS
MEMBRANE FLASHING
AT 16" O.C. FILL SOLID
MEMBRANE FLASHING
ARCHITECTURAL PRECAST PANEI
WITH BATiS INSU. SEE
SPECS.
CONCRETE SEDGE
STAINLESS STEEL DRIP EDGE
VAPOR BARRIER, in GYP.
STAINLESS STEEL DRIP EDGE
J" EXPANSION AND SEALANT
BD. BY TENANT
i" EXPANSION AND SEALANT
CONCRETE SIDEWALK, SEE CML
ALIGN INTERIOR SIDE OF
CONCRETE SIDEWALK, SEE CML
DRAWINGS
WITH
STUD FRAMING WITH
DRAWIN
1..
INTERIOR SIDE CMU
FINISH FLOOR
ti FINISH FLOOR
SEE °.
a
a
SEA .a
4" CMU
GROUT CAMPY SOLID TYP
SEE STRUCTURAL DRAWINGS FOR ALL
FOUNDATION AND FOOTING INFORMATION.
ALL ELEMENTS ARE SHOWN HERE FOR
REFERENCE ONLY
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER.
EIFS SYSTEM SEE ELEVATIONS
FOR REVEAL LOCATIONS
CONTINUOUS DRIP REVEAL
CONTINUOUS DRIP REVEAL
EIFS COMPATIBLE BACKER ROD
AND SEALANT
EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
VERSETTA STONE PANEL
DETAIL %
I In^= I'-0"
PROVIDE ALTERNATE FOR CORNICE TO
BE ALL FOAM, SEE DETAIL 9/A5.6
PREFINISHED. PREFABRICATE ( A J
METAL COPING WITH CONTINUOUS SLOPE Y
GALVANIZED SEAT. ATTACHMENT
a
4
a d d
SEE STRUCTURAL
FOR ALL SLAB,
AND SUBGRADE
REQUIREMENTS.
2" RIGID
4 PERIMETER
INSULATION.
EXTEND TO
BOTTOM OF
d FOUNDATION.
6
11/2"= L-0"
T.O. WALL
SEE SECTIONS 'r
WOO NAILER-2X
TRTD. WOOD,
CONTINUOUS, OR TWO
LAYERS OF TREATED
I" PLYWOOD. STUD
FRAMING
TUBE STEEL, SEE
STRUCTURAL
EXTEND MEMBRANE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
NAILER.
F.R. PLYWOOD
SHEATHING AT
BACKSIDE OF
PARAPET
6" METAL STUD
FRAMING AT 16" O.C.
METHODS AND AMOUNTS MUST BE > TO. WALL
COORDINATED WITH COPING h SEE SECTIONS
MANUFACTURER,
WOOD NAILER-2x
EIFS SYSTEM SEE ELEVATIONS Ti WOOD,
FOR REVEAL LOCATIONS CONTINUOUS, OR TWO
LAYERS OF TREATED
CONTINUOUS DRIP REVEAL ^ 3 PLYWOOD, STUD
EXTERIOR SHEATHING SLOPE
I
CONTINUOUS DRIP REVEAL
EIFS COMPATIBLE BACKER ROD
AND SEALANT
2" EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS B" 9 I/2"
MODULAR BRICK VENEER
DETAIL H
FRAMING
TUBE STEEL, SEE
STRUCTURAL
EXTEND MEMBRANE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
NAILER,
F.R. PLYWOOD
SHEATHING AT
BACKSIDE OF
\ PARAPET
—` 6" METAL STUD
FRAMING AT I6" O.C.
SLOPE O
T.O. WALL h
SEE S�
W000 NAILER-2X
WOOD, CONTINUOUS.
.
CONTINUOUS, OR TWO
LAYERS OF TREATED
PLYWOOD, STUD
F STUD
FRAMING
TUBE STEEL, SEE
STRUCTURAL
EXTEND MEMBRANE
UP BACK OF C U R R A N
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
NAILER.
SHEATHING AT ARCHITECTURE
SHEATHING AT
BACKSIDE OF
PARAPET 5719 LAWTON LOOP E. DR. #212
6' METAL STUD INDIANAPOLIS, IN 46216
FRAMING AT 16" O.C. O :: 317. 288 .0681
F :: 317. 288.0753
I
I/2" = 1' O"
i0 � �
-EXTERIOR SHEATHING
-6" METAL STUD FRAMING
AT 16" O.C. FILL SOLID
WITH BATTS INSU. SEE
SPECS.
-VAPOR BARRIER, in GYP.
BD. BY TENANT
ALIGN INTERIOR SIDE OF
STUD FRAMING WITH
INTERIOR SIDE OF CMU
4" CMU J /---
GROUT CAMtt SOLID ttP. a 4
SEE STRUCTURAL DRAWINGS FOR ALL 4
FOUNDATION AND FOOTING INFORMATION. a
ALL ELEMENTS ARE SHOWN HERE FOR
REFERENCE ONLY ° d d
DETAIL Li 2
1 la" = I'-0'
EXTRUDED ALUMINUM
STOREFRONT
SHIM AS REQUIRED.
PROVIDE SEALANT AND
BACKER ROD AT
INSIDE AND OUTSIDE
OF FRAME.
CONTINUOUS SEALANT
EXPANSION JOINT AND
SEALANT
FINISH FLOOR
SEE SECTIONS I°. - a eA
a 94
°
CONCRE7SIDEWALK.EE
GS °
°
y
e
Qa
'SEE STRUCTURAL
FOR ALL SLAB,
AND SUBGRADE
REQUIREMENTS.
2" RIGID
PERIMETER
INSULATION.
EXTEND PO
BOTTOM OF
SEE STRUCTURAL
FOR ALL SLAB,
AND SUBGRADE
REQUIREMENTS.
7
a d
a
d
°
O
SEE STRUCTURAL DRAWINGS FOR ALL < °
FOUNDATION AND FOOTING INFORMATION.
ALL ELEMENTS ARE SHOWN HERE FOR
REFERENCE ONLY 4 °
4
DETAIL 3
I Ill" = I'-0'
PREFINISHED, PREFABRICATED
METAL COPING WITH CONTINUOUS
GALVANIZED SEAT. ATTACHMENT
METHODS AND AMOUNTS MUST BE
COORDINATED WITH COPING
MANUFACTURER.
2' EXTRUDED RIGID INSULATION, PROVIDE
MANUFACTURER'S JOINT TAPE.
COVER WITH AIR INFILTRATION
BARRIER. TAPE AIR BARRIER JOINTS
MODULAR BRICK VENEER
2" RIGID
PERIMETER
INSULATION.
EXTEND TO
BOTTOM OF
FOUNDATION.
AT STOREFRONT
LOCATIONS,
EXTEND
HORIZONTALLY
UNDER SLAB
4'-0" MIN.
WOOD NAILER-2X
Til WOOD,
SLOE CONTINUOUS, OR TWO
LAYERS OF TREATED
IJ" PLYWOOD, STUD
FRAMING
T.O. WALL
SEESEE S
DETAIL U 4
L
TUBE STEEL, SEE
STRUCTURAL. DO NOT
PROVIDE TUBE STEEL AT
UDDER DETAIL
EXTEND MEMBRANE
UP BACK OF
PARAPET, OVER
NAILER AND SECURE
AT FRONT FACE OF
NAILER.
F.R. PLYWOOD
SHEATHING AT
BACKSIDE OF
PARAPET
6" METAL STUD
FRAMING AT 16" O.C.
111i111i
V l PROJECT
LOCATION
KEY PLAN
THIS DRAWING AND THE IDEA$ Dii
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF NRRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED. WHOLE OR
IN PART W1140lT1' THE WRITTEN
CONSENTOF CURRAN ARCHFFECTORE.
0 C0`Y T2019.CVRRANA"1TECFWtE
WESTON POINTE
RESTAURANT
4425 WESTON POINTE DRIVE
CARMEL INDIANA
CARMEL RESUBMITTAL 04,07,17
PERMIT SET 07.17,17
Qi ADDENDUM 01 09,22.17
Qz PERMIT SET 05,21,19
170026
DETAILS
Al