HomeMy WebLinkAboutA5.6 Load DetailsRELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel DATE: 08/19/19 PREFINISHED, PREFABRICATED METAL COPING WITH CONTINUOUS GALVANIZED SEAT. ATTACHMENT METHODS AND AMOUNTS MUST BE COORDINATED WITH COPING MANUFACTURER. EIFS SYSTEM SEE ELEVATIONS FOR REVEAL LOCATIONS CONTINUOUS DRIP REVEAL CONTINUOUS DRIP REVEAL EIFS COMPATIBLE BACKER ROD AND SEALANT 2" EXTRUDED RIGID INSULATION, PROVIDE MANUFACTURER'S JOINT TAPE. COVER WITH AIR INFILTRATION BARRIER, TAPE AIR BARRIER JOINTS VERSETTA STONE PANEL N PREFINISHED, PREFABRICATED METAL COPING WITH CONTINUOUS - GALVANIZED SEAT. ATTACHMENT ' T.O.WALL METHODS AND AMOUNTS MUST BE SEE SECT COORDINATED WITH COPING ue MANUFACTURER. WOOD NAILEI TRT'D. WOOD, EIFS SYSTEM SEE ELEVATIONS — CONTIN000S, OR TWO FOR REVEAL LOCATIONS LAYERS OF TREATED Jj" PLYWOOD. STUD CONTINUOUS DRIP REVEAL — FRAMING TUBE STEEL, SEE STRUCTURAL C EXTEND MEMBRANE ,n UP BACK OF PARAPET, OVER NAILER AND SECURE AT FRONT FACE OF CONTINUOUS DRIP REVEAL — NAILER. EIFS COMPATIBLE BACKER ROD— F.R. PLYWOOD AND SEALANT SHEATHING AT SOLDIER COURSE BRICK — BACKSIDE OF PARAPET EXTRUDED RIGID INSULATION, PROVIDE — 6" METAL STUD MANUFACTURER'S JOINT TAPE. FRAMING AT 16" O.C. COVER WITH AIR INFILTRATION BARRIER. TAPE AIR BARRIER JOINTS MODULAR BRICK VENEER— ALTER FOR CORNICE TO /1L PROVIDE ALTERNATE FOR C RNICE BE ALL E TAIL 9/A5.6 FOAM, SEE DETAI 0 i 2" EXTRUDED RIGID INSULATION, 2" EXTRUDED RIGID INSULAPION, PROVIDE MANUFACTURERS JOINT TAPE. RS JOINT TAPE. PROVIDE COVER COVER WITH AIR INFILTRATION EXTERIOR SHEATHING WITH COVER WITH AIR INFILTRATION BARRIER. TAPE AIR BARRIER JOINTS 6" METAL STUD FRAMING BARRIER. TAPE AIR BARRIER JOINTS MEMBRANE FLASHING AT 16" O.C. FILL SOLID MEMBRANE FLASHING ARCHITECTURAL PRECAST PANEI WITH BATiS INSU. SEE SPECS. CONCRETE SEDGE STAINLESS STEEL DRIP EDGE VAPOR BARRIER, in GYP. STAINLESS STEEL DRIP EDGE J" EXPANSION AND SEALANT BD. BY TENANT i" EXPANSION AND SEALANT CONCRETE SIDEWALK, SEE CML ALIGN INTERIOR SIDE OF CONCRETE SIDEWALK, SEE CML DRAWINGS WITH STUD FRAMING WITH DRAWIN 1.. INTERIOR SIDE CMU FINISH FLOOR ti FINISH FLOOR SEE °. a a SEA .a 4" CMU GROUT CAMPY SOLID TYP SEE STRUCTURAL DRAWINGS FOR ALL FOUNDATION AND FOOTING INFORMATION. ALL ELEMENTS ARE SHOWN HERE FOR REFERENCE ONLY PREFINISHED, PREFABRICATED METAL COPING WITH CONTINUOUS GALVANIZED SEAT. ATTACHMENT METHODS AND AMOUNTS MUST BE COORDINATED WITH COPING MANUFACTURER. EIFS SYSTEM SEE ELEVATIONS FOR REVEAL LOCATIONS CONTINUOUS DRIP REVEAL CONTINUOUS DRIP REVEAL EIFS COMPATIBLE BACKER ROD AND SEALANT EXTRUDED RIGID INSULATION, PROVIDE MANUFACTURER'S JOINT TAPE. COVER WITH AIR INFILTRATION BARRIER. TAPE AIR BARRIER JOINTS VERSETTA STONE PANEL DETAIL % I In^= I'-0" PROVIDE ALTERNATE FOR CORNICE TO BE ALL FOAM, SEE DETAIL 9/A5.6 PREFINISHED. PREFABRICATE ( A J METAL COPING WITH CONTINUOUS SLOPE Y GALVANIZED SEAT. ATTACHMENT a 4 a d d SEE STRUCTURAL FOR ALL SLAB, AND SUBGRADE REQUIREMENTS. 2" RIGID 4 PERIMETER INSULATION. EXTEND TO BOTTOM OF d FOUNDATION. 6 11/2"= L-0" T.O. WALL SEE SECTIONS 'r WOO NAILER-2X TRTD. WOOD, CONTINUOUS, OR TWO LAYERS OF TREATED I" PLYWOOD. STUD FRAMING TUBE STEEL, SEE STRUCTURAL EXTEND MEMBRANE UP BACK OF PARAPET, OVER NAILER AND SECURE AT FRONT FACE OF NAILER. F.R. PLYWOOD SHEATHING AT BACKSIDE OF PARAPET 6" METAL STUD FRAMING AT 16" O.C. METHODS AND AMOUNTS MUST BE > TO. WALL COORDINATED WITH COPING h SEE SECTIONS MANUFACTURER, WOOD NAILER-2x EIFS SYSTEM SEE ELEVATIONS Ti WOOD, FOR REVEAL LOCATIONS CONTINUOUS, OR TWO LAYERS OF TREATED CONTINUOUS DRIP REVEAL ^ 3 PLYWOOD, STUD EXTERIOR SHEATHING SLOPE I CONTINUOUS DRIP REVEAL EIFS COMPATIBLE BACKER ROD AND SEALANT 2" EXTRUDED RIGID INSULATION, PROVIDE MANUFACTURER'S JOINT TAPE. COVER WITH AIR INFILTRATION BARRIER. TAPE AIR BARRIER JOINTS B" 9 I/2" MODULAR BRICK VENEER DETAIL H FRAMING TUBE STEEL, SEE STRUCTURAL EXTEND MEMBRANE UP BACK OF PARAPET, OVER NAILER AND SECURE AT FRONT FACE OF NAILER, F.R. PLYWOOD SHEATHING AT BACKSIDE OF \ PARAPET —` 6" METAL STUD FRAMING AT I6" O.C. SLOPE O T.O. WALL h SEE S� W000 NAILER-2X WOOD, CONTINUOUS. . CONTINUOUS, OR TWO LAYERS OF TREATED PLYWOOD, STUD F STUD FRAMING TUBE STEEL, SEE STRUCTURAL EXTEND MEMBRANE UP BACK OF C U R R A N PARAPET, OVER NAILER AND SECURE AT FRONT FACE OF NAILER. SHEATHING AT ARCHITECTURE SHEATHING AT BACKSIDE OF PARAPET 5719 LAWTON LOOP E. DR. #212 6' METAL STUD INDIANAPOLIS, IN 46216 FRAMING AT 16" O.C. O :: 317. 288 .0681 F :: 317. 288.0753 I I/2" = 1' O" i0 � � -EXTERIOR SHEATHING -6" METAL STUD FRAMING AT 16" O.C. FILL SOLID WITH BATTS INSU. SEE SPECS. -VAPOR BARRIER, in GYP. BD. BY TENANT ALIGN INTERIOR SIDE OF STUD FRAMING WITH INTERIOR SIDE OF CMU 4" CMU J /--- GROUT CAMtt SOLID ttP. a 4 SEE STRUCTURAL DRAWINGS FOR ALL 4 FOUNDATION AND FOOTING INFORMATION. a ALL ELEMENTS ARE SHOWN HERE FOR REFERENCE ONLY ° d d DETAIL Li 2 1 la" = I'-0' EXTRUDED ALUMINUM STOREFRONT SHIM AS REQUIRED. PROVIDE SEALANT AND BACKER ROD AT INSIDE AND OUTSIDE OF FRAME. CONTINUOUS SEALANT EXPANSION JOINT AND SEALANT FINISH FLOOR SEE SECTIONS I°. - a eA a 94 ° CONCRE7SIDEWALK.EE GS ° ° y e Qa 'SEE STRUCTURAL FOR ALL SLAB, AND SUBGRADE REQUIREMENTS. 2" RIGID PERIMETER INSULATION. EXTEND PO BOTTOM OF SEE STRUCTURAL FOR ALL SLAB, AND SUBGRADE REQUIREMENTS. 7 a d a d ° O SEE STRUCTURAL DRAWINGS FOR ALL < ° FOUNDATION AND FOOTING INFORMATION. ALL ELEMENTS ARE SHOWN HERE FOR REFERENCE ONLY 4 ° 4 DETAIL 3 I Ill" = I'-0' PREFINISHED, PREFABRICATED METAL COPING WITH CONTINUOUS GALVANIZED SEAT. ATTACHMENT METHODS AND AMOUNTS MUST BE COORDINATED WITH COPING MANUFACTURER. 2' EXTRUDED RIGID INSULATION, PROVIDE MANUFACTURER'S JOINT TAPE. COVER WITH AIR INFILTRATION BARRIER. TAPE AIR BARRIER JOINTS MODULAR BRICK VENEER 2" RIGID PERIMETER INSULATION. EXTEND TO BOTTOM OF FOUNDATION. AT STOREFRONT LOCATIONS, EXTEND HORIZONTALLY UNDER SLAB 4'-0" MIN. WOOD NAILER-2X Til WOOD, SLOE CONTINUOUS, OR TWO LAYERS OF TREATED IJ" PLYWOOD, STUD FRAMING T.O. WALL SEESEE S DETAIL U 4 L TUBE STEEL, SEE STRUCTURAL. DO NOT PROVIDE TUBE STEEL AT UDDER DETAIL EXTEND MEMBRANE UP BACK OF PARAPET, OVER NAILER AND SECURE AT FRONT FACE OF NAILER. F.R. PLYWOOD SHEATHING AT BACKSIDE OF PARAPET 6" METAL STUD FRAMING AT 16" O.C. 111i111i V l PROJECT LOCATION KEY PLAN THIS DRAWING AND THE IDEA$ Dii AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF NRRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED. WHOLE OR IN PART W1140lT1' THE WRITTEN CONSENTOF CURRAN ARCHFFECTORE. 0 C0`Y T2019.CVRRANA"1TECFWtE WESTON POINTE RESTAURANT 4425 WESTON POINTE DRIVE CARMEL INDIANA CARMEL RESUBMITTAL 04,07,17 PERMIT SET 07.17,17 Qi ADDENDUM 01 09,22.17 Qz PERMIT SET 05,21,19 170026 DETAILS Al