HomeMy WebLinkAboutWESTONpt-MICHIGANrd-C4-EROSION>eSOYlYo�
/ k /
(XrE
HiY %
/
55
---� RU.E&U.E,
S89-4900"E
466.83(M & R)
\\ L [ [ STTgID7CON SEE DE'
WESTON-MICHIGAN REALTY, LLC
A\ z \ INSTR. NO.2016-55540
4
V A \ \ \ m
\\ S
\?\ it
It
it
\\ 4 II
\ 1
\ p yl
E
III
\•.. •: E \ \ III\��.
\ II
\ I N
s \ \\ \ II
NOW OR F\ERLY \ \ \`{` II
STATE OF INDTANA \ \ \` II
RE-RECORD
Nalloel \
STIRNa e Q \ S
INSTR. No. 20 -69568 \
DATCHFAA\A)
i
D=3-11'42"
R=17187.91' (M & R)
1r958.45' (M & R)
T-47) 35'
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
�N;4\�3tD,A�,DA�1
DATE: 08/19/19
4
Di
R=17137.91' (M;
R=17280.68'(R)
1�944.44' (No
V 1�944 ]2� (R)
\ Ty 72.34'
\\ N18°17\15"W \
\p 43.00' & R)
\ \ P.O B. 4.027 Ac. It,
�g It
E
'i
L
— - WESTON POINTE
SECTION ONE
INSTR. No. 2004-67374
P.C. 3, SLIDE 489
FPFP YB'-BHFFFVAR��\
{ETBACK LINE \ L
$TER 'ON -BOARD'
TYPE
W
W W
4V
IIIII
�
o
\
•`\9
�a
.J
'OUT
RETAIL BUILDING "
13,860 sq.R.
/r
STABILIZED CONS
FF.E.-904.74'
EXIT & FIRE SSE
4425
DETAIL 1 SHEET C5.1
70
rr
\ THE`
WES'
\ SEC
INSTR
\ P.C.I
It
O` \
M \
R° It
� 2 \
C
y(4
Yc
cc \
\\ RESTAURANT \
� n
` \ 5,175 s%ll
F.F.E.=904.50' • c.
�I M LINE FF R iNF NOW OR FORMERLY \\
0`0"G `'F'j/ INSTR.SNo.. 2005-69773 I
j -1 4S 1 \
Oo3g a'I"E 3945ts lM & F1 I
\\
\\\ \.
PERSON RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF EROSION CONTROL MEASURES
DEVELOPER:
JDF DEVELOPMENT
JOE FARR
jf o rrOjdfdevelopme ni.com
14074 TRADE CENTER DRIVE SUITE 229
FISHERS, IN 46038
317-509-7388
THIS PLAN IS FOR CONCEPTUAL EROSION
CONTROL PURPOSES ONLY. DO NOT
SCALE, SEE SHEET's CI / C3
INSTALL SILT FENCE & REMAIN IN PLACE
UNTIL 100% VEGETATIVE COVER IS
ESTABLISHED
EROSION CONTROL SEQUENCE SCHEDULE
1. PRECONSTRUCTION ACTIVITY:
A WORK AROUND AND LOCATE ALL EXISTING ABOVE AND BELOW GRACE UTILITY LINES: CONTACT IND"
UNDERGROUND PLANT PROTECTION SERVICE ('HOLEY MOLEY) 1-800-382-5544.
B. CONTACT PUN REVIEWING/INSPECTION AGENCY($).
C. INSTALL SILT FENCE AROUND PERIMETER OF AREA(S) TO BE PROTECTED/PRESERVED.
D. PROTECT AREAS SUITABLE FOR USE AS VEGETATIVE FILTER STRIPS.
2. CONSTRUCTION SITE ACCESS:
A. PROVIDE STABILIZED OF CONSTRUCTION ROUTES, CONSTRUCTION VEHICLE STAGING AND MAINTENANCE
AREAS, DESIGNATED EMPLOYEE PARKING AREAS, ETC., TO PREVENT OR MINIMIZE TRACKING OF SEDIMENT
ONTO PUBLIC OR PRIVATE ROADWAYS.
3. PERIMETER CONTROLS:
A. DIVERT STORMWATER RUNOFF FROM UP -SLOPE PROPERTIES AWAY FROM THE PROJECT SITE.
B. INSTALL SEDIMENT TRAPS/BASINS AT LOCATIONS WHERE STORLWATER MAY DISCHARGE FROM PROJECT
SITE.
C. DIVERT STORM WATER RUNOFF AWAY FROM THE ACTIVE CONSTRUCTION ZONE.
4. INITIAL LAND CLEARING AND GRADING ACUITIES:
A SAW CUT AND REMOVED ASPHALT AND ALL DELETERIOUS MATERIALS FOR THE INSTALLATION OF
SIDEWALKS AND FOOTINGS.
5. SECONDARY LAND GRADING ACTIVITIES:
A CONSTRUCT PRIMARY SEDIMENT TRAPS AND BASINS DOWN SLOPE OF ACTIVE CONSTRUCTION ZONES.
B. STABILIZE OUTLETS FOR STORMWATER DRAINAGE SYSTEM WITH RIP-RM OUTLET PROTECTION AND TURF
REINFORCEMENT ARTS FOR BASIN OUTLETS, STORM DRAIN OUTLETS, OPEN CHANNEL OUTLETS AND
CULVERT PIPE OUTLETS.
C. PROTECT OF STORM DRAIN INLETS WITH DROP INLET PROTECTION AND/OR CURB INLET PROTECTION.
6. TEMPORARY SURFACE STABILIZATION:
A. STABILIZE ROUGH GRADED AREAS WITH TEMPORARY SEEDING MID MULCHING ON ALL ROUGH GRADED
AREAS THAT WILL BE INACTIVE FOR A PERIOD OF SEVEN DAYS OR MORE.
B. STABILIZATION OF AREAS AT FINAL GRADE NTH PERMANENT SEEDING AND MULCHING FOR
DETENTION/RETENTION BASINS, DRAINAGE SWALES.
7. INSTAL PAVEMENT INFRASTRUCTURE:
A. INSTALL STORM SEWERS AND STRUCTURES, PROVIDE PROTECTIVE MEASURES.
B. INSTALL UTILITIES AND PROVIDE TEMPORARY SEEDING AND MULCHING.
8. BUILDING CONSTRUCTION:
A. PROTECT EXISTING STORM DEAN INLETS
B. MAINTAIN AND STABILIZE SITE ACCESS WITH STABILIZED INGRESS/EGRESS ENTRANCE AT ALL POINTS
WHERE VEHICLES ENTER AND EXIT THE SITE.
C. MAINTAIN PERIMETER PROTECTION
D. PERFORM EXCAVATION FOR FOUNDATION AND/OR FOOTINGS
E CONSTRUCT BUILDINGS/STRUCTURES
F. PRUDE DOWNSPOUT EXTENDERS ONCE DOWNSPOUTS AND GUTTERS ARE INSTALLED.
9. FINAL SIMPING/bANOSCABNG/STABILIZATION:
A PROVIDE FINAL SITE STABILIZATION FOR ALL REMAINING UNVEGETATED AREAS.
10. MAINTENANCE OF EROSION AND SEDIMENT CONTROL MEASURES:
A REMOVE ALL TEMPORARY STORMWATER MANAGEMENT MEASURES AND STABILIZE ALL REMAINING
UNVEGETATED AREAS DISTURBED WHEN REMOVING TEMPORARY STORMWATER MANAGEMENT MEASURES.
EROSION CONTROL BIMKET NOTES
1. ALL PERMANENT SLOPES SHALL BE SEEDED NTH A MIXTURE OF MULCH (3000 I) IODD LEIS 12-12-12
FERTILIZER PER ACRE, AND FED FESCUE AT THE RATE OF 40 LITI PER ACRE, AND 40 LBS. BLUE GRASS
PER ACRE FROM MARCH I TO MAY 15 AND AUGUST 10 TO OCTOBER 15.
2. ALL SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CLEANING AND GRUBBING OPERATIONS
AND SHALL BE MMNTANED UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
3. ALL SEDIMENT CONTROL MEASURES SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE POUR AS
APPROVED BY THE CITY OF CARMEL.
4. THE CONTRACTOR SHALL PRUDE ADEOUATE EROSION PROTECTION MEASURES DURING CONSTRUCTION SUCH
AS, BUT NOT LIMITED TO: SILTATION BASINS, SILT TRAPS, STRAW BALE DAMS. SOIL CEMENT, MULCH AND
SEEDING. SOIL STABILIZATION FABRIC. AND JUTE NETTING.
5. EROSION CONTROL BLANKET BY "NORTH AMERICAN GREEN' (OR EOUAL). ANCHOR ALL EROSION CONTROL
BLANKETS AS REOUIRED PER MANUFACTURER NORTH AMERICAN GREEN 'S 150 ON' 100% BIODEGRADABLE
(48- LONG) STAPLES SHALL BE 11 GOUGE U-SHAPED, 6- LONG, AND MINIMUM I- CROWN. DRIVE STAPLES
VERTICALLY INTO GROUND AND USE (4) STAPLES AT ENDS OF ROLL. FOR SLOPE INSTALLATION, STAPLE
ALONG LENGTH OF ROLL AT 6 FOOT INTERVALS. FOR SWALE LINER, STAPLE ALONG LENGTH OF ROLL AT 4
FOOT INTERVALS. ANOTHER ROW OF STAPLES SHALL BE PLACED IN THE CENTER OF THE BLANKET
ALTERNATELY SPACED FROM STAPLES AT EACH SIDE OF ROW.
6. ANY GRADES ESTABLISHED BETWEEN MAY 15 TO AUGUST 10 SHALL PRUDE TEMPORARY SEEDING
CORSISPNG OF 40 IRS. PER ACRE OF ANNUAL WE GRASS.
7. FOR ANY SEEDING THAT TAKES PLACE BETWEEN OCTOBER 15 TO MARCH 1, EITHER WE OR WHEAT MAY BE
SUBSTITUTED AND SPREAD AT 3 BUSHELS PER ACRE. IF GRAINS WE USED THEY SHALL BE CUT AT THE
TIME OF PERMANENT SEEDING. COVER SEED WITH MULCH I - 1-1/2- DEEP.
B. IF TEMPORARY SEEDING 6 ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH MAY BE ELIMINATED
EXCEPT FOR EXPOSED AREAS.
PROPOSED
EROSION LEGEND
INLET PROTECTION SEE DETAIL ON SHEET
C5.1
SILT FENCE OR FILTER SOCK SEE
DETAIL ON SHEET C5.1
TREE PRESERVATION SEE DETAIL ON
SHEET L2
STABILIZED CONSTRUCTION EXIT SEE
DETAIL ON SHEET C5.1
EROSION CONTOL BLANKET SEE DETAIL
ON SHEET C5.1
PERMANENT SEEDING SEE DETAIL ON
SHEET C52
LEGEND
UNDERGROUND TELECOMM,
G UNDERGROUND GAS
E UNDERGROUND ELECTRIC
W UNDERGROUND WATER LINE
UNDERGROUND STORM SEWER
PROPERTY or R/W LINE
- - — CENTERLINE
SETBACK LINE
EASEMENT
o PROPERTY CORNER MONUMENT
O 0 STORM INLETS
CHIP Z139- UTILITY POLE
UTILITY PEDESTAL
m ELECTRIC BOX/RISER
CONCRETE
PROPOSED ASPHALT
EROSION CONTROL PLANIII
GRAPHIC SCALE
90 150
IN FEET )
I inch = 00 ft.
Tn% 4re•In9 is not lmenae4 to be reweseme4 as 0 Revocemem or Oryinel Boundary Surrey, o Rowe So..eY, o 0 5... eyol Lncm.on Renoo.
m
3 0
rc a w
O
W w 4 uZO
cs
Q Q Q Q Q Q
ec ry _
<Ct
o
o ry
O�
C 'n
ICE.
MM+y o
Fil ot 'e m
W ot
M
K ^
Fr y jz
rc z c �
W -
w Z <
p � N
E
o /,', �
ICI G.i �C U p Q
z°
P-4
O 4
w
Q
w m
i l0
M
n
O
i O
s b
o L9
O
OX�Y o
F� C
a
V
O u
F—
�1 F
W C
z
r✓C Z
con
PIT
W zZ
ANY O Z
—
O Zm
x f f
DRAWN BY_ TEN
CHECKED BY: ALD
PROJECT No.
1610-024
SHEET No.
C4