HomeMy WebLinkAboutWESTONpt-MICHIGANrd-C6.1TYPICAL SANITARY SEWER SPECIFICATIONS
TO BE USED FOR PRIVATE SEWER DEVELOPMENT
WITHIN
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
REVISED 3/1/2007
1. Standard specifications of Clay Township Regional Waste District (the District) and
Department of Transportation (INDOT) shall apply for all work and materials. Sanitary
sewer pipe shall be installed in accordance with Section 715 of the current INDOT standard
specifications handbook.
2. San nary sewer gravity pipe, unless pressure rated pipe required per IAC or directional drilled
pipe, shall be Polyvinyl Chloride (PVC) in accordance with ASTM D3034-89 with a
minimum wall thickness designation of SDR 35 and installed per ASTM D2321-89
specification. PVC a used shall be grooved bell spigot end and gasketed. The a shall
P PP 9 P2 9 PP
be made of PVC plastic having a cell classification of 12454B.
3. PVC sanitary sewer gravity fittings shall also Conform to the requirements of the ASTM
D303489 specification. All fittings shall be molded in one piece with standard pipe
bells, gasketed elastomeric joints, and spigot ends. Single piece molded PVC with
standard pipe bells, gaskets, and spigot ends for back -tor -back tee wyes are acceptable.
Wall thickness of all fittings shall have a minimum designation of SDR 26. Gaskets for
elastomeric joints shall be molded with a minimum cross -sectional area of 0.20 square
inches and conform to ASTM F477 specification.
4. All sanitarymanholes shall be racast concrete manholes in accordance with ASTM C478
P
and Section 720 of the current f Kent standard equivalent
shall hm be handbook. 0-rings shall
Conform to n rise Double row of Kent Seal or equivalent shall also be applied to all joints
and between riser rings and castings. Manhole step spacing shall be no more than arinches.
Manholes shall be air tested for leakage in accordance with ASTM sC1 244-02,(Vacuum)
Standard Test
Method for Concrete Sewer Manholes the Negative Air Pressure acuum Test.
by g N )
A. Installation and operation of vacuum equipment antl indicating devices must be in
P9
accordance with provided
ctu y the manufacturer
and accepted
pted by the District
Engineer.
Pspecifications
which have been r entm b the manufacturer and aces etl b the District En ith er.
P Y Pt Y 9
The vacuum equipment must be capable of testing the entire manhole, including the
CBSfln and /ISBN rings.
9 9
B. With the vacuum tester set in place:
1. Connect the vacuum um to the outlet port with the valve open.
pump p P
2. Draw a vacuum often (10) inches of HE. (5 psi) and close the valve.
C. Accepted standards far leakage will be established from the elapsed time for a
P 9 P
negative pressure change from ten for
f inches to nine inches mercury. The
maximum allowable leakage rate for a four (4) foot diameter manhole
le must be in
accordance with the following:
Minimum Elapsed Time for a:
Manhole Depth Pressure Change of 1 Inch Hg
10 feet or less 60 seconds
>10 feet but <15 feet 75 seconds
>15 feet but <25 feet 90 seconds
For manholes fives 5 feet in diameter, add an additional fifteen 15 seconds and for
manholes six for feet in diameter, add an additional thirty (30) seconds to the time
requirements forfour
he foot diameter manholes. For all manholes deeper than
twenty-five (25) feet, the Engineer will determine the applicable minimum elapsed
time.
D. If the manhole fails the test, necessary repairs must be made. The vacuum test and
repairs must be repeated until the manhole passes the test.
E. If manhole joint sealants are pulled out during the vacuum test, the manhole must be
disassembled and the joint sealants replaced.
F. Manholes will be subject to visual inspection with all visual leaks being repaired.
5. Butyl rubber coating with plastic wrap shall be applied around each manhole joint from 3-
inches above to 3-inches below each joint. The appropriate primer shall be applied prior to
applying the rubber coating. Inside joints to be filled with premat plug material. Entire
exterior surface of sanitary sewer manholes shall be sprayed with a bituminous coating and
all exterior gap exposure of riser rings shall be back plastered or grouted with nonshrink
grout.
6. The manhole chimneys, including all riser rings shall be sealed using flex rib internal
chimney seal manufactured by Cretex, NPC, or a District approved equal. The flex rib
internal chimney seal shall extend from a minimum of 3-inches below the top of the Cone
section to 3-inches over the manhole Casting frame or per manufacturers installation
procedures if directed otherwise. Internal Chimney Seal shall be installed after manhole
vacuum testing and prior to final acceptance. Water test may be done, per manufacturer or
Districts recommendation, to provide assurance that internal chimney seal is watertight.
7. The casting elevations are set by plan, however, the castings are to be adjusted in the field by
the District's representative should a discrepancy occur between plan grade and existing
grade. New manhole rings) and Cover shall be installed to establish grade. Maximum
height of adjusting rings shall be 12-inch on existing structure adjustment and 10-inch
maximum on new construction.
8. Backfill around all installed or proposed manhole structures, sidewalks, bike paths and/or all
paved areas shall be made with granular material (b-bmrow)or No. 8 stone, up to 18-inches
below crosssection thickness (which shall include "Ns,. 53" stone depth). If more stringent
backfill requirements are set out per city, town, county, or District specifications those
standards shall be followed. Trench opening within 5-feet of the back of the curb of
paved roadways, shall be backflled with granular material or No. 8 stone in accordance with
Section 211 of the current INDOT standard specifcations handbook.
9. The Contractor shall be responsible for verifying that all state highways, city, and county
permits have been obtained by the developer prior to start of Construction.
10. Initial asbuilts shall be presented to the inspecting engineer prior to final submittal to the
District for review, otherwise Contractor shall be required to furnish the developer's
Engineer with a set of prints showing actual sewer locations and inverts including lateral
location, depth, and length. Such asbuiit prints must be received by the Engineer before
the final contract payment can be authorized. Asbuilts shall be submitted per the Districts
cu rent standard which can be fan nd at wwW.chwd.org.
11. The sanitary sewer laterals and stubs termination shall be indicated on the surface with a
detectable metal post set immediately above the said termination point if full connection
is not immediately made.
12. All sanitary sewer lines upon Completion will be required to pass a low pressure air test.
Said test shall be conducted according to ASTM F1417-92, and shall be witnessed by a
District employee or the Districts representative. The testing shall be in accordance with
Table 1 as follows with 0.5 psi being added for each foot of waterabove the sewer line
being tested. Sewer lines shall be subject to visual leak inspection at downstream
manholes with all visual leaks being repaired and subject to televising requests by the
District.
13. Prior to final deflection test (mandrel test) all mainlines shall be cleaned and free of any
debris. Deflection tests shall be performed on all flexible' pipe after the final backfill has
been in place at least 30 days. No pipe shall exceed a vertical deflection of 5%deflection
test results. ('The fallowing are considered non -flexible pipes: concrete pipe, ductile iron
pipe, and Cast iron pipe). The deflection test shall be performed with a nine -point
mandrel. Proving rings shall be available at time of test otherwise no testing will be
allowed. All mandrel testing shall be witnessed by a District employee or the Districts
representative.
14. The ends of all laterals are to be plugged watertight with a gasketed cap capable of
withstanding a law pressure air test without leakage. Laterals shall be subject to visual
leak inspection at downstream manholes with all visual leaks being repaired
15. Bedding for flexible pipe and rigid pipe shall be No. 8 Crushed stone from 6-inches below
RELEASED FOR CONSTRUCTION .)a placed on no leas than 6-inches of No. B
Subject to compliance with all regulations
of State and Local Codes
City of Camel ((��
�vmlUAIILTr1�nDAaL
DATE: \ 08/19/19
16. Water line, utility, and legal drain crossings and separations shall be in accordance with
the mare stringent of the two: 327 IAC 3-6-9 or the Districts standard drawings.
17. The trench shall be opened sufficiently ahead of pipe laying to reveal obstruction, and
shall be properly protected and/or barricaded when left unattended.
18. No water shall be permifled to flow into the sanitary sewer system during Construction.
Contractor shall utilize a pump to keep the water level below the pipe. Pump discharge
shall be directed to a storm outlet in accordance with state and federal laws and
regulations 327 IAC 3-6-20 . An a entering existing sewers shall be plugged with
9 ( ) YPP 9 9 P 99
screw type mechanical, braced plug until such time as all tests on the sewers and all
punch list items are complete.
19. All sewer laterals installed shall be bedded the same as the main line sewer.
20. Forty-eight (48) hours notice shall be given to the District prior to the start of sewer
construction. Also, 48 hours notice shall be given prior to doing any testing on the
sewer.
21. Manhole Castings shall be stamped SANITARY SEWER (Neenah Casting R-1772 or
East Jordan 1022Z1GS) and be sel(sealing type. The casting flange shall be 34 inches
and the clear opening shall be min. 20-13116 inches. Watertight castings shall be bolt -
down East Jordan 1022Z1 PT and also stamped SANITARY SEWER.
22. The minimum slope of the sewer shall be
Size of Pipe
Minimum Constructed Sid
8-inch
0.40 %
10-inch
0.28 %
12-inch
0.22 %
15-inch
0.15 %
18-inch
0.12 %
23. The Contractor shall provide measurements of the slope of the sewer for each manhole
P P
section r Constructionprogresses. Such measurements shall be certified b a Registered
Y 9
Land Surveyoro than
beavailable oon-site for aonstrute by the District's
Inspector. en mare than three manhole sections can be constructed in advance of such
measurements.
24. In the event the Contractor does not meet the minimum slopes, the sewer section and any
other affected sewer sections shall be reconstructed to meet such minimum slopes.
25. Laterals are to be installed with a minimum 14 gauge tracer wire tram the wye to the
terminus. Upon lateral completion the contractor for the building or home will extend the
wire from this temlinus to the building cleanout adjacent to the building.
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. Only one building may connect to the sewer main per lateral mleaS otharv4Se approved by TRON.
2. Foundation drains, sump drains, downspouts and otharstamwaterdmins Mall Never be mnNeded tothesanitary Sewer. site devwtering Systems
Shall Never be discharged to Me sanitary server,
3. The existing sewer lire tram the beh irg to Me sepfic tank may Only be mused N it 6 located under a buildimaddilion, patio, pereM1«paved
driveway, and Me line passes an air tesflhet is obrervetl by TriGY C rut TrC We more idom:afion about air telling requirements. The properly
martens responsible for testing casts.
A TriC Mail inspect allnew lateralsor lateral repairs in their Andres. Final connection to the Sanitary Sewer must the observed byl-rim The property
owner or contractor mustmtify TWo Fria to heckflliFg.lnspectiwNnust beaMeduled m least 24 Hours in advance. N an inspection fails and
Subsequent inspectionsare required, or Nthe contractor is Feet on site for the scheduled inspection, a $100fee will he assessed and From be
k rlorto whadulung the reins
5. se -ra stem COMeMs or shall never be dsche etl to sanNa sewer. aeatlVisetl that put healthce mmeMre uktesx c
IW r m ry ro r pa q ati
systems. Upon camactiOn toaanitarysew«, a septictank mumypirally be abandoned,pumped clean,and filled competaly wind earthen material.
Comas your county health departr mnfor more intolmmimm SRI system am abandonment requirements, am to natty Me depanmant of
anyabandonment.
6 Th PVC pipe SDR3lor8DR SASToruseingnavilyserver lale21ins1allaliOn orrepair:
PVCpipe sOR 3s «sOR 2s, ASTM D3o3a, s' stammer
PVC pipe, pressure rated SDR 21, ASTM D2241, 6" diameter
PVC restrained joint pipe far directional drilling: Cartago GrAmIireSDR 21,ASTM D2241, W diameter
All gasketed joints Shell meat ASTM D3212
All finings Shall be SDR26 or baiter
Ductile Goon meManical jant fangs ANY proper be river n
BEAR 26 gasketed repair Sleeves or Indiana Beal shear gwN
Fence, and similar flexible couplings re only aoce table in and shell Trot be used without Order oval tram TWo
a Y P P PP
Gkareuls: 6" threaded PVC caps
Bedding. Use 98CNsided more or tortured face aggregate
The Following materials an amepubk for use in low rea mwer aterainstallatlon or mPr
HOPE pipe f«diredmalruling: ORn In Lzs"diaaterPEwic
Conneaene stall he made via eleaMusiOn or using polypmpyene or stainless steel compression fittings
Eedrauaw high Mduma tapping tee,raed 200 psi, M4710
1251PB full Part1/4tum fusible PEb II valve,rateel 200 psi
Tibrearded 9chede valve 316 stainless sterelinited 200
per
Caused T Cofaac ble u setiOnmaterials,mend u antl other r requirements
repro a s,P P cops
], F it and b systems, the I I th building Mallnot exceetl 3 'n length before a tleanoul must he atltletl and the line
g y pressure y rg g gl
istrensitionedt 8"diameter SOR35 WC Glued' Man rid allayed after No addaaal load flM a narrowed heMeen Ma building
PPa g g a 9
and the lransMbNcbamM For all gravity lines aeaomS shall net bee acad more than 0(YaParthewethe bNH' gand Ma sewer man Sea
Tiros standard castings RYr more intwmww tiaeanan m inallatim.
8. BeddingmaterialShellhe laced Water bimheS below l2 include the i ewrtace.The trench Shallbea minimum of l8'4AdewiM at
P PP
least 6" of clearance On both sides of the pipe.Mmer6lShall be placed over the pipe and tracerwire aNerinspectiOn.Boq unstable or unsuitable
material found belcev and near the lateralIncluding any fill or foundation backfill maternal must be removed and roplaosel w8 alone The
Contractor 6 wely responsible for esWbl6lirg stable pipe bcdd' gConditions,
9, w101 sdtl Copper tracerwireshall Word On top of and Fun the Mire length of the lateral. AN Elkirg of timerwire shall use3M splice kit
model DBRIYEY RUNS Innwa homer conn Direct Bury Lug Aqua Ww03 N9622oor TrKo approved equal.
10. Laterals Shell ter installed at least2C tared water wells unless PVC pressure grade pipe is used. My pmposad'nstallation requiring pressure pipe
Shellherev awed by TnCo pnorM nmallm w Wren a transition is made between BEAR 35 pipe and pressure grade BEAR 21 pipe, a ductile Iran
gasketedmechanical couplings must be used.
11, Laterals less than 5 deep shall be st least 24" ham the property line. Laterals more than 5 deep all be at least Sol Man the property lire. WTere
the lateral more in dope proximity to the property line the prcpMy cMl«s must be accurately maMtl by a professional land surveyor pilot to
Inspection.
12. Laterals running parallel to a building or stmaunahell he at least 36" tram Me farm da crawl Space or SET on grade founaton and 6P fain the
face of a basement foundation wall. Spacing requirements also apply whh respect to Me anallary unt dura's fouMa4on depth. Ancillary structures
(e g. window wells) and other utili es shell net he placed over or Near Me lateral. TriCo may adjust retwernems ARM fMun access to the lateral
mayheobstmaedbydherutiftie.TheamtraaasheuMFalltodiswssfdrt rNhe/shebelievesthiswuMheanissue.
13, All intrastructure ConNeaed to TaCo's Reversysternm betened in ed atelevised at TaCcEdimretiOn and mum remain accsssibleand a p
PmP Y tl maintained.
14. Call 811 «1-ec0a825.544bef«e you rig. For rtwn information go to www.indiana811.oFg.1f you have any queatbnaoM you waMM request an
exception M standards and spreaffirations, pease contain TriCadming mural bu®Ness hours at 317A44-9200 prior to mnpleing the voh and
scheduling aninspaction. Go tosomatrooecmo view standard drawings and specifications.
Revised NIBGO19
1 1
ra r r-rr r
(11PIC4)
TOP VIEW
WE:
SS ROWTOF aN pEO ( SE SEADED RENT 3 Ns, flu MAEMRM
mnLMRE MM RSN CONCRETE xaawT 6MM
FMINC To ASTM 990
WE:
MrptVRY CONCRETE PFCgUCTi, INC
APPROXIMATE KOM
BASE SECTOR 9375 be
MAR SEtDw 7659 be
TOP SUB non Itu
STRUCTURE MIGHT MT& MM Fa
DFfAt
1
44�'
-
{,1, III` �✓Il�ll'J'.RR��s1Nj5
yy .y MM a
�
_ Y�.�i .• It
Ica � IP
Y
H
�_
��
�mNN IEI
NNNW�Ia:
' I•I
��•�
1� _ r r r rrMiYri;
Ip• r
W��
li I I TT-r-�o_✓
I
L_ C
rrr rrrrrr rr rrY rrrrrr'}rrrrrr'r
IF Zee;t - rr r'It; ift r rrrrrr i-rrrrrr: i,
MUM, �i!RiMi01iirifli fi
•
r
•1
(4) 3/bC x J" AANIE55 STEEL 1'-5" IN.
ANCNR Sam (APICAL) 1P Ron NRR
MNMiau' pjs(ima.)
UANl
AIR aIRfFN NL avR a0 ALL KUM SiVL ME SEALED By A
FlFInBE B111L REM D EE YAUHT (ROPE) CNFOWNG TD AM C Ws,
D]PB M AND NMNMS OF NATEP.IAL SHALL Cf DEPENDENT M SEASR OF
WT.ND M AND AS pFEDTED BY ENGNEG. CONTRACTOR SHALL GROUT NL
INTERNAL MANNRE AMIR We WN-SBRVN CNWT.
EACH MANHOLE SECWW SHALL BE SAVED won M EYTERNAL
Kew Sand OF INRl GAUGE MAP a MMmACR.wED
Br YNNO M1EN5, Mc. ME (9) INCH MN
TG UNIRBItWED EARTH ge
'CLENC Ras a M TO I1nL
NOW:
1)E meo S PER CODE OR LOCALL 9 I RaEmB. ra MM
ALL ME APIVtlh➢ W MOM
2) ME FOR
ORiENTATON NU BE DE MOM UPON THE
3) P SHOP GRANTED MUST BE SUBMITTED nl TRILo FOR RE4EM
AND APPROVAL.
EXTERIOR INTERCEPTOR/SEPARATOR DETAIL
INIS
MANHOLE CASTING TABLE
wGWw
MCOD. COVER
m xa ream 6.6
ra.-„ro ® cam
4y RAN IF MTL pm
MAN
OF
our m l�n Never,wIY smF
UD
MERWP
IE1Tmmo
RTAL
# DISTANCE MAY BE IXOEA4D
BASED ON THE m nUMM
OF THE WASTE mu ROK
C WLT rare Hamm BIM
MAN%SL U&
# # NNIWM UQUO WITH MAY BE
RDIMYD OR A CASE -BY -CASE
Miss a IFFP BY TIME
NOTE,
1) INWMPrw/ MARNI SMI tllliwY
To ASTW core unuj 4,000 Pm WHx
IxsTAUAnw w r z WNMT OR CAST MIN..
SRIl WTm S/ MARNS &WL ONLY BE INSTALLED 1119w
A mmm
N" FOR MED
CORE RIM OPENING SP NNNw
NM RSUENT CwMCTUB
jIOR W OJBT N ROUGE AiOC m�
llnroICK RNL4 R RIIEIRARXS�
�rp CpH 1,1L BF p_ MM Rrc¢T UE
Y O N ll"Ci UI IEWAALRIA7 G"
STNXLtss CBS- SMART MWM
FOR B PVC PIPE
flu INnutm Br mHEes (Ica)
SE ART DETAIL
WANMIM
aMF1E
IY MINIMUM Mar WASHED 08 SEE MAT
FOR ILIflIXG AND SUPPORT
TMCO mR
- won To
Mum SEAL` No4 PREMIUM _ PRECAST @E1EEE
MADE 9JM RUBBER SEALANT NM UNG ME
e';jIPF�n
n OUNT BALL CON WNMEIE CR FLANS fi
COUNT (RmE) cMFASIM Tc :::"P cMRN
ASTM R90 `,:i : •� ,
TRICO DETAILS
)p •PEGIS Rf0 %IS a
-,
PEBBQ932
STATE OF :.�Q S
/st II
do we
do we
S a4
O Br m tl
Mar
w 4 u z
w ad
V
Per
NW
W ry
ao ON Ca Ce C4
F
W
O
wI
a
F
U �
I
O � E
N
a
F w 5 q, a
M
'N
� e E
41
�a S
d Z o ry
W Z
w0 z
- ofNif
O n ,f1
W N Ed
W WI
0
IYI Ci a cad n a
5
d
zD
`o
is
0-
1�
L.La i
3
w 5
E
w
_ m
th
S �
O
Is O
9 �
c ad
�I p
A�1QA�A o
+N z
z
V
m
U
vl F
W
O
r,✓t Z
C
G
W F
z
r O Z
I+y a -
z
re 2
DO
� U
DRAWN BY: TEN
CHECKED BY: ALD
PROJECT No.
1610-024
SHEET No.
C6e]