Loading...
HomeMy WebLinkAboutWESTONpt-MICHIGANrd-C6.3PANEL GENERAL 1.1 SCOPE OF WORK A. The work performed under this section includes but a not limited a the supply PP v and installation of High Density PolymM1vlene (HDPE) Pipe firings; and fning as shown. I. Provide HDPE pipe and fittings complete with all necessary jointing facilities and materials, specials, mechanical joint adapter Kira and order appurtenances required for installation in and completion of the water papallnes to be constructed. 2. Provide HOPE son ice tubing complete with all necessary jointing facilities and materials, and Omer appurtenances required for Irradiation in and completion of the water services w be constructed. A- Related Supplemental Sections: I. HORIZONTAL DIRECTIONAL DRILLING 12 QUALITY ASSURANCE A. Commaods Qualifications: I. CONTRACTOR or SUBCONTRACTOR performing any fusion (beat or determination) on the HOPE pipe shall be able to provide evidence and references for satisfactory at least 3 projects of similar ry se references page diameter for and wib beforeimilar the contra types These refrences may be asked for and approved beforeehe contract's awarded. 1.3 SUBMITTALS A. Shop drawings and manufacturer's literature for all CONTRACTOR .suppbed brands shall b promptly submitted to the OWNER fora ravel P P > PP D. I he following pate shalt be submitted before delivery of HDPE PPa, tubing or fittings. L Pipe: SDRI I Certification by the manufacturer that be HDPE material and pipe was manufactured and tested In accordance who American National Standards Institute (ANSI)/American Water Works Association (AWWA),C-906. 2. Smoke Tubing: Certification by the manufacturer that the HDPE maunial and tubing was manufactured and tested in accordance with ANSVA W WA, C-901. US I PART t GENERAL L1 SECT' ION INCLUDES A. The work specified in this Section documents the approved construction methods, procedures, and materials for l horizontal Dri fling HDO pr g( ). L2 QUALIFICATIONS A. The contractor or sub- contractor performing the DIED work shal l be a common y that has been in continuous operation in this area of work for at least three (3) )ears. B. Thu contractor or sib-contrauor shell have performed at least five (5) BOB p Jams of similar pipe diameter and length In be last three (3)your. PART2 PRODUCTS All MATERIALS A. See Relates Sections for papa maiSrAke pyTmaAili6rvVld$i6jB6f. T& EQUIPMENT REQUIREMENTS A The Contractor sh II ensure that t t s roe led to facilitate PP p t P p M1 instal ltint rhllb trimmed the size pipe diameter A p PP b d e g have ei p eery d thtp 116 kcapacity for ethe d emener and lwb'canth the tended radius sections.The proposed will ensure bet the drill rod can meet the bad radius required forme proposed installation. 2.3 DRILLING FLUIDS A. A mixture of anlonite clay or other approved slurry and potable water shall be used as be cutting and sail stabilization Raid. The viscosity shall be varied to bat fit be sou conditions associated. Water shall be dean and fresh. No other chemicals or polymer surfactant 1s or be used In the drilling fluid without the written consent of the Engineer and attar a determination Is made that me chemicals to be added arc not harmful or corrosive to the facility and are eta vonmemally cart. TS-6 CITY OF CARMEL WATER UTILITY Developer tamped Water Mains Check List 1) no Developer will submit two (2) ads of prclfmintryplatu for be proposed development so no City of Carted Water Utility can determine the main location and sizing, location of hydrates, service lines and valves to conform to be City of Cama<1 Water Utility' s standards and specifications. 2) Developer will provide plans that conform to the City of Camel Water Utility' s standards for main extensions. In general, be City of Cvm<I Wets Utility will respond within ten (10) business days. 3) Contractors shall call City of Carmel Water Utility for an on-shepde-morstmetiw meeting before work begins. Contractor must have approved plans on -sloe and At materials to be used most be approved by a City of Camel Water Utility imperial. 4 Contractor will allow inspection City of Water Utili inspectors during be construction of the water main P ry esP 8 extension workmanship ip and City of Carmel Water Utility' s request Ed Waterldmlrangubman exremafwsn location, workmanship end materiels as they refere ro City of Wemel Wirer Utility standards and specifications. *All Ductile Iron water mains shall be bedded in Wand, fmm be bottom of be trmeh to 12" above be pipe. *Moe RaB ive slamming Tam must be installed 18 " above all water mains. Tmeer wire must be installed with all water main laid in Camel. 5) The Contractor will have water main extortions pressure tested per City of Carmel Utility specifications and witnessed by City of Cancel Water Utility' a Importer.* 6) The Contractor will conduct the disinfection of water main extension, with direct supervision by a City of Cmmd Water Utility Doodler. The Contractor will also be responsible frthe de-Mlorh ation of thin watrflushed off during disinfection process. RELEASED FOR CONSTRUCTION Jhldyslabamtarytesnng,and two (2)set of r ce carried wafer utility, will be wonder he Subject to compliance with all regulations of State and meal Codes lab services. City id Capped �VT�kJI�D*VAWM<_ DATE: \ 08/19/19 3. All water main piping and components shall be certified for conformance to ANSI/ National Sanitation Foundation (NSF) International Standard 14, and NSF Standard 61, Drinking Water System Cemponents - Health Effects, except Section 9, Mechanical Plumbing Product The piping and components must display the ANSFNSF 61 seal. 3. Manufacturer's recurrent instruction and I1tamWre m the CONTRACTOR so that manufacturers recommended procedure and practice of instal I'ng p pe and filings are followed. 1.4 MANUFACTURERS A. HDPE Pine. HDPE papa shell be as manufactured by Performance Pipe, North American Pipe Company, CSR Poly Pipe Industries, Charter plastics, W. L. Plastics, Flying W. Plastics, LM. Eagle. PART PRODUCTS 2.1 PIPE MATERIAL A. HDPHHDP=Pip HDPE pipe shall conform to the latest edition of ANSI/AWWA C901 and C906. Material used in the manufacture of I IDPE pipe shall conform to He HDPE Standard Code PE3408. All HDPE pipe SDRII shall have the same outside diameter as DI pips. 1. Dimensions. The pipe shall have ductile iron pipe (DIP) equivalent outside dimensions for the nominal size indicated, 2. Working Pressure Rating (WHO. The pipe ball have a wall thickness dimension ratio DR Il for 6-inch through24' n' diameter 1 Pp 3. Pipe Identification.6ashall Each pipe length shall II b marked -n accordance with AWWA Cria and Lengths. Pipe n colorw th proposed striping 4, ape um on 0 fed in. Pape unless o her"oca a ro fused theOW anal be a minimum of 20 feel in length unless olnerwisca roredb�bcOWNER. g approved by the FITTINGS A. Pipe Things, All standard fmngs (tees, bends eta) shall be ductile iron conforming to ANSI/AWWA Cl IWA21- Ductile iron fittings shall be suitable for be 350 pound working pressures unless chemise noted. The fittings shall the coated a rM1 an asphalt coating in accordance w ith ANSUAW W A CI10/A21.10 and lined inside with cement mortar and coal coated in accordance with ANSVAW WA C104/A21.4. The cement lumber lining shall be double thickness. TS-2 L All ductile iron fittings shall be connected to the HDPE man by a means of mechanical restraint as noted in Suction 2.3. Mechanical Joints, Including accessories, shall conform to ANSPAW WA Cl I I/A21.11. All mwhanlealjoints shall No Made With Tagalogs e. HDPE Fittings. HOPE Fittings shall b same de from the resins and materialdesignations, 11 I l t rectos(minimumoli1psied pressure bet and d Tens o s as me HDPE pipe permitted HDPE fittings are lined below 1. Elesuffusion Service Saddle. For service connections to a HOPE main. Saddle must be fused bledrofusion) to the HDPE main, and may NOT be mechanically deans. Saddle shall also accommodate standard City of Carmel Water Utility corporations. 2. Mechanical Joint Adapters For mechanical connections on an HDPE mainline. M1 adapters shall be butt fused onto the HDPE main. 3. Fuse - A Carp. For I.5" or larger service or connections A a HDPE main. C. Stainless Steel lmserVSfferer. All non fused connections shall require the use of stainless steel inserts inside the end of the HDPE pipe. Inserts bnl be as follows: L HOPE Pam, At HDPE pipe connections to Nlinge and/or other use materials the inside of the HOPE shell be reinforced b insertin atwo P g and wedged by stainless nctureel er for actual Ivied shallbe meterpropand and approved by the manetadma for actual HDPE pipe stammer ana wall thickness (DR) being utilized. 2. HDPE San ice Tubed At HDPE pipe connections to fittings and/or other onematerial the'd of the HDPE a shall be reinforced b nschin a pipe Y g piece se stainless feel risen. Insert shall be properly sized and approved by be maned Ins rt the h shot HDPE tubing diameter and wall thickness ecomp bein rotting, have se length should ensure re pro er tend the end of g gt r m<cote re on and have one eta Earea m ensure r learn into end p ssi g, proper g of I1DPE tuning and be designed for use col@ compression style connections 2.3 PIPE AND FITTING JOINTING/CONNECTIONS A. Bulk Fusion. The Bun or Heat Fusion vashmalue shall be used tojoin ad HOPE f and caned HDPE shall a the HOPE TM1-jointsshall PP gs PP conforml ASTM D2657 and patio s. p rf d strict accordancewith the pipe manufactures « conditions ens The bur the equipment should be capable of meeting , temperature recommended by the 0 degrees including but not limited h temperature requirements of 4VI rig t i M1eill produce and an weld strength fusion pressure oCat psi. The fusion joining shall Produce a joint add strength equal to or 6ree[en than the tensile strength of the pilx itself. IS-3 F. After completing installation oftM1e induct the work site shall be restated. P g P B. The Contactor shall identify the sour" o[fresh ward for mixing the drilling The work site shall he cleaned ofvll excess slurry left on the ground. Removal mud, The Contactor shall be responsible for approvals and permits required for aed final disposition of excess slurry or spoils as the product Is Inooduccd shall be• than sources as streams, fivers, ponds, or time hydrants. Any water souse other the responsibility of the CONTRACTOR. than Potable water may require a pH Tested Excavated areas shall be restored in accordance waM1 me Cary Specifications. The cost of remaining damaged sidewalk, SI curb,faced C. the there u ate re Tit g g pumping ,p pressures, viscosity, denit an other facilities dismays, lawns, some dams, landscape, and Omer facilities is faced by the and is ire d ing the pilot one density is required during the pilot bare, back taming, and pipe installation CONTRACTOR. Wages, tovee swbehy of thet as removalec suitsa II. ) not shown on the Drawings erg utiWNER and can be used y toings M1ole. Relief holes can to believe xc pressure down hole. down h tick, red, notify m o notpro dons ree notify be OWNER and do not proceed until insam acted. nimizehear the r w is d minimize heaving during pullback, she pull bad ate is determined in order to l back N obtainW. NotlCy to<OWRJER If sprin8s or runnin8 water are encountered. cos mambo M1 f cuttingswithoutbuilding dawn File entryexcess and prey E drillingov dr shalthel rental at entry and exit points unit they eczeto orremoveabombe Entry and efTdsandshall sufficient sizes contain the expected ruuvp of drilling fluids and soil musings. soil cuttings. 3.2 SPECIFIC REQUIREMENTS D. The Contractor shall tenure mat all drilling nuids are disposed offer mcyckd in a A. Back Ream Hole Diameter manner acceptable to the approp ew local, state. or federal regulatory agencies. When drilling In suspected wnrymmaed ground, the drilling Hurd shall be tested The back ream hole diameter shall be no greeter than the sum option maximum For contamination and disposed of appreciatively. Any excess material shall be Produce outside diameter (OD) plus six inches(g) removed upon completion of the bore, B. Testing E. Restoration for damage to any transportation facility or non -cramp oration facility used by heaving, settlement, escaping drilling Fluid (fte o n or the directional When there is any indication a pipe has sustained damage and may leak, the work drilling operation, is the reducibility of the Contractor. Any pavement heaving is to be stopped and the damage investigated. The City may require a pressure r settlement damage squires reaoration/replacement of the pavement per lest. The testing may consist cycle of the following methods but shell always applicable City standards. meet or exceed City's testing requirements 1. Manufacturers pressure testing recommendations for the type of pipe PART EXECUTION beinginstalled are followed. The Cit'sR Representative shall be notified eP e and brpreent during net test forte be test results for liunw. 3.1 GENERAL CONSTRUCTION REQUIREMENTS Q Wurs tl 'b' t t' f 24 M1 A The re test shall within P s Pe ( ) oath (car It shall f hdcath C R tai s b coPY ry p A. Th shall beinstalled b I 1 d[ [h I' si rode p peg it be pipe' � t compliance with specifications, the City may require it m led drawings. bcl llW inn ❑oweble rill. B. e ens Provide for testing ndeleanup as won aspracticable,cleanup do and gad do not farbehindpipe installation. alkfilli Perform preliminarycleanup and grading 2. Product meet pressure wA operations immediately after backfilling. copy of theestmust quiremats setmaim the Owvee. AwpY of snots shall requirements theO tie to the it li Plpuosnotit compliance [vmlanedtuthe Clry's RepCity C. All surfaces shall be finish graded tuoriginal and ground cover. with specifications[he City may require ittu be filled with ❑owable all. may require it neatly materials delivered ro the Pmjed shall neatly stored. Excavated mBADatey material which is not removed from the it,Exportwrdss es be stockpiled C Locating and hacking achess so astoruse as inconvenience to theproperty owners as possible. beet Driveways and streetrentry, e must bekept clot. aewdbeme menoerP looming and tradingmedellhead The Cache Excvallbcfor enrry,acordanewits, slurry sump my other recovery pit tshall bare. The Cary marquotherszewa erna with ore during egrid roved ex ovation shall accordance with Standard Sump out Specificationslist surface grid verification, tie Engbeep as the asyme Ennd gineer. or any other system as re r quendard for applicable wed. Sump areas or M1OIdinK tank$ are required to contain drilling work thodsaatlon, eccepte0 methods oPracking directional bores. TM1n IoraMg and tracking system The locating in Raids. TS-J TS-8 CITY OF CARMEL WATER UTILITY Iu1G11uUlu6YGP177:1It1Y�731L7:\NIRCeRIY�li 111 WA 0 94) g a A IoRill FIT a 1 R 1YJ/t11I p:i.Y I.W k a S IN I. Design drawings shall have a north snow and the drawing scale indicated. The name of the development as wells the name and address of be Developer and Engineer will be shown on the drawings. Site clwation information will be shown when dictated by simpme mute topography which will allow adequate assessment of the main being installed. Drawings will show be location, size and We of existing sanitary servers, storm drains, water dlver s, power lines, gas lines and other existing surface stmctwes. Drawings will also lluchate be layout, type and size of proposed utilities and compares such as water mains, water servicelines, sanitary laterals and mains, storm mains, diverts, other drainage Warrants, sized improvements, gas and power lines. Drawings shall have a separate sheet showing the water and switary sewer plan. Include detail sheet for water and sanitary sewer. 2. Include an overall location and key map for the entire project. 3. Fee minimum specific requirements for items show„ on water main drawn s as follows: P8 is a) R-O-Wwidn, centerline of road and Street No=. b) Back of deb with dimension. c) Dedicated exclusive or drainage and utility casemena.(Installation w public R-O-W is typically not allowed. d) Property lines, lot numbers, and house numbers. e) Length, type, size, class or pressure rating of water main most be shown. Location and dimension to main within easement and relative to back of curb and R-OW. IN Depb of cover over main. h) Show all finings, firebobans, valves and other appurlmanees along with method oflestam, ) Crossings beneath existing streets must be shown as open tat or bore per local and state requirements, Crossings made by boring shall have a detail showing casing size, type wall thickness, length and location of The proposed casing in conformance with the City of Carmel Water and Wastewater's standard detail. A profile detail shall be included. D Stream dosslngs must show type of material used beneath the waterway and the fioodway. D.J. restrained joint pipe will be required beneath be waterway. Casing shall be used where needed. City of Carmel Utilities will determine when casing is needed k) Where l Cyprus horizontal separation and IR--inch vertical separation cannot be mdntalned between water Imes and century and/or storm sewers, me location most be identified on are wrier line drawings for review and approval by me City of Carmel Utilities and Indiana Department of Environmental Management as she time water or wastewater main drawings am submitted for review. Generic details which allow be field contremor to iwtall water and sewer mains closer than these separations "as advised" will not be allowed. 4) Exclusive or utility and drainage easement (U.D.E.) along with necessary access casement will be provided for main installation. The mmimum width of easements required shall be as stated below. Due to specific site comments, be Company may require wider easements than sated. a) Exclusive orDD,E-20fed wide b) Access Earment-20feetwide 5) Entire project should be one drawing, if not it must have corresponding match lines. 6) Water Service line size and location shall be shown for each lot. Final As- built Submission Format At project completion as Wilts must pave all can actions made and submitted in the following digital and paper farmers • Piles must be submitted on a dl-rota in aPaw at eau labeled with Englander Company name, project name, and date be oil was bunted w/o using file compression in AnoCi d version 2009 or earlier foram. These should be one drawing labeled as water becomes with only water imposed information. •Cenlfied as -Wilts shall accurately reflect all field design. Asbuilts must be stamped "field verified" and signed by be developers registered professional engineer or land surveyor. • Disc file names shall be clearly labeled and easily identifiable to all users. • Projection shall be referenced to nad83, Indiana State Plane Coordinate System, East Zone, using U.S. Survey Feet and per Hamilton County damm. • All parmant drawing elements will reside in bit primary drawing fits. Them shall be no cells, nodes, blocks, or reference files attached to the drawing. • Tic area section comers in bit Indiana Start Plant Coordinate System or insumproper odfrnLition. • All underground fittings shall be marked win lath or p.v.c pipe and identification for g.p.s. capturing. • Must show measurements b<twttn all fittings with each fining identified, and water mains identified by size and material • Service line measuremema from property linty serviceline most be shown • The as -bull, bon paper and digital, most be revised to show tie exact location of all wirer mains, laterals constructed, hydrants, valves, smite lines as fittings as installed with measurements from a permanent stromne (e.g. fire hydrant) • Afro installation, actual point membrane locations for all hydrwa,viams, fillings, eta shall be expanded using B. Sidewall Fusion. the StEwall (or Heat) Fusion technique shall be used to connect HDPE fittings to the HDPE pipe. The joints shall conform to ASTM D2657 and shall be performed In strict accordance with the pipe nufacture's recommendations . The sidewall patient heating irons shall have air inside diameter equal to the outside diameter of the HDPE pipe and shall he 9 inch wider than the size of the ruin ben attached. The f shal produce B g he aim weld strength to or renter than the tensile h fbe meta J fort 9 6 strength pipe C. Poe Mechanical tonne Mechanical joining haft be used to make connections to ductile iron fittings and/or von HDPE pope. Perm aed methods of IMPS joining are listed below. HDPE to be joined using HARVEY TYPE ADAPTERS PARTS EXECUTION 3A INSTALLATION A. Installation Method The HDPE pipe shall be installed using the horizontal directional drilling method as Far Carmel Utility Standards practices noted bedew. Locations where pipe material transitions are required Ia(HDPEOIP)may be installed by open cut. B. Pipe Joining I. The HDPE a shall be assembled and' d the site using the butt pp g fusion indhodn a provide a leak prossfjpermitted. ' t. I headed d andsolvent-cement procedures it a dures used and connections are not permitted All with and ufoeedur's read men at used b shalt compliance wan n< manufacturer's Technician. Fusin shall a to accomplished Tel pained as equim technicians by a manufacturer of polyethyld personnel end/or fusing equiPmehL e 2. S rM1 ri b the f tF ti n I. I me 9 pp ) 6 B machine,'pilot meet squarely 5 nat the entire be ea is covered. The d tin make r contact oit hout applyingP to the hex Too. Theheatpitn pen shall he as Printed by the pipe manufacturers recommendations The Ipipe Fall be according to pipe diameter and as recommended by the pipeannnewrer. Pipe ends shall be cemnY moved awn bate Weer law once One withoutate melt bead s achieved The p ha ends wall li n nee quickly without slamming. 'brie ficadssre jn nt shall the true of aed shall have uniformessu tall back beads resulting from the use of poling time before and pressure. The joint shall j allowed bMomarree wand cooling time before removal of pressure. "the fused joint shall be werertigM1t and TS-4 shall be capable of ensuring mar the proposed Installation is installed as intender. The locating and tracking system shall provide information on: L Clock and pitch Information. 2, Depth. 3. Battery status. 4. Position b,y). 5. Azimuth, where direct overhavd readings(walkover) are not possible (i.e. subaqueous or limited access tanspartation facility.) 6. Alignment readings or plot points stall be taken and recorded every five (5) feet. J. Beare commencement of atlrectonal sing ling operation proper calibration of the equipment (f required) shall be undertaken. O All facilities shall be installed in such a way that heir location can be readi It ddmnlnca by nationals designation after Installation. For nameonauctive Installations this shall be accomplished by attackmea t of Owing wire, as per City of Cannel Technical Specifications. 3.3 QUALITY CONTROL A. Arepresentative of the Contractor must bein control ofthe operation at all times. The representative must have borough knowledge of the equipment and the procedures to be performed, and must be preenr at be job site during the installation. B. The City must be notified forty-sight(48) jobs in advance ofstafing work The installationgees shall not beginuntil the have representative is present at the job site and agrees that proper preparations have been made. 3A TESTING AND CLEANUP A Previde for t d cleanup rh Ions do not g up as soon asp lag far behind pp installation. stern Perform preliminarydanup and grading opweti m immediately aRcrbackfilling. B. All surfaces shall be finish graded to original contours and ground cover. A. All surplus excavated material shall be disposed of off -site In a legal manner by He Container. RE? Survey Grade G.P.S. wit. • Please vast City of Carted Specs to view full set of requirements, hhp:llwww.ci.rap tin.uslservaceslwataopaadonslwate W5.html It is important to have secede submitted correct) to avoid delays an future ro eats. 0 Y Y Y P j Should you have any questions, Please fee free to contact Steve Cook at 733-2855, CARMEL WATER: POINT FEATURE LOCATION CAPTURE STANDARDS: After installation of the distributes system in a new development, actual point womards loatiws Oi of the following fwares most be expanded hydrants, valves, tees, bends, reducers, and fittings. Subsurface fatties such as tees, limits, reducers, and firings most have their coordinate locations either captured prior to burial, marked by stake protruding tram be surface a be captured after betel or other method to be approved by Carmel Water Dept Sail Enforce such as hydrants and valves can he raptured post installation. Pile format for final delivery shouted bedevils dons or slry file on ad our 2 copies (can be headed with digital As -Built submission). Point symbolgY must not include calls. Poona will beall ibuted with feature type Cosmic mordinatee most be referenced to NAD83, Indiana State Plane Coordinate System, East Zone, using U.S. Saney Feet Locations most be accurateto within I foot of actual mM location THE HYDRANT PUMPER NOZZLE SHALL RE OF ONPIECEDESIGN, COMPATIBLE WITH b STORZ HOSE COUPLING. THE NOZZLE SHALL BE AN INTEGRAL PART OF THE FIRE HYDRANT AND MUST BE FURNISHED BY THE MANUFACTURER OR AUTHORIZED DISTRIBUTOR DESIGNATED BY THE MANUFACTURER. MUELLER MODEL 290220 FOR CASTING AND 290221 FORCAP. STORZ ADAPTERS WILL NOT BE ACCEPT LD. BLUE REFLECTIVE WARNING TAPE MUST BE INSTALLED 18" ABOVE ALL WATER MANS. TRACER WIRE MUST BE INSTALLED WITH ALL WATER MAN LAID IN CARMEL. POSUCAPS OR THE EQUIVALENT ARE NOW REQUIRED ON ALL WATER VALVE INSTALLATIONS. CONTRACTOR TO CALL FOR PROCONWITH INSPECTOR PRIOR TO WATER MAIN INSTALLATION. CARMEL WATER UTILITY INSPECTORS HAVE THE AUTHORITY TO MAKE CHANGES IN THE FIELD IF CONDITIONS ARE WARRANTED. shall have tensile strength equal to that of the pipe. All joints shall be subject toieuptanec al the Engineer prim aced at 3. All defective joins shall it cut out and replaced at no cost s be Owner. Any section of the pipe with a gash, buns, abrasion 10% sir, he "all deleterious fault tNgreater used 1m depth than ten percent the si of the well a defetishall notbeused and must be removed fromthe site. However, a randance area of me be t dd and n i head m pipe Y 1 suotewithpmeedura smtd b I addition, n of having r ohm roughness, Tim such as concentrated rdg .s discoloration, cos ve spot maturing Timing, variable wall thickness or any other defae of eject repress to handlinve shall as carded and of the Engineer rdfor nr. project representative shall be discarded and not used. C. Pressure Testing 1. Under no circumstances shall HDPE pipe be pressure rested when the temperature of One pipe is above 80 degrees Fahrenheit. 2. I PAT pipe holds pressure by developing stress in its walls, muss the pipe will increase slightly in diameter when under high pressures. The procedure for pressure testing HDPE main should take in account be expansion ofthellDPE main Thereaommendedpracedurelsto: Initially pressurize the main to the standard test pressure (150 psi) and let a majority of the main expansion take place, which should occur in 2-3 hours. It After the above expansion time period, the main should be pressurized again to test pressure f150 psi) and the Pressure Test is concluded for the two (2) hour paned The HDPE pipe will continue to expand during the test itself and the following table contains maximum allowarces for this ex a expansion. p Alto" once for Expansion under Test Pressure (U.S. Gallons per 100 R. of pipe) NOMINAL PIPE DIA. TWOHOUR TESI' 0,25 6 0,60 8 I.00 12 230 3. Under no c ro distances shall be I IDPE main remainunder test pressure (125 psi) for longer than eight (8) hour. If the test'net completed due to leakage, equipment falters, ate., be HDPE shall h allowed or'relax" for eight (8) hours prior to retesting. TS-5 Gry of Carmel Water UNiry Approved Lit ofcomt-mnMaterials Updated July 16, 2015 Effmfive August 1. 2015 1. Watermain:Shall beductile iron laeasureclass 350 and domestically manufactured byus pipe, Machine pipe, Clow/mcwwe, griffin pipe or approved equal. 2. Rel ive warring tape: Shall be installed 18" above pipe, be a minimum of 3" in width and 4.5 Suits thickness, blue in color meeting be requirements of mwa color coding for potable water and shall have be words "caution buried water line below" imprinted in bold solid black lettering on be ape: and made For high grade polyethylene with a foil backing detwrble at I K' to 24" below grade by non -forgers locating equipment. 3. Trading wire: Shall be as follows', a. For direct bury applications tracer wire shall be a minimum K10 awg solid strand ham drawn copper wire, jacketed In I'd blue ply thyl jacket 30 mile thick minimum and recommended for direct basal applications. THHN red Pace is t accepandra, F. For directional drilling applications tracer ware shall be a minimum M 10 an solid strand copper clad steel ware jacketed in a solid blue polyethylene jacket 30 mils thick minimum and recommmded for directional rolling applications: and as manufactured by copperhead. THHN rated wire is not acceptable. 4. Firehydrrtes: Shall be Mueller or American Darling (Safety Yellow, M.A.B. #0433291 m shadwin wlliams ND5Za2) (Cannel Clay Spec Hydrates shall be apat right and shall have a factory applied safety blue shipe round thin hydrerd bonnet). The hydrant pumper nozzle shall be of one-piece design, compatible win 5" store hose coupling. The nozzle shall be an integral part of be fire hydrant and must befumished by the maufortumr or authorized distributor designated by the mawfacmrer. Mueller model 9290220 for casting and 9290221 for cap. Store "admtrs" will not be accepted. 5. Valves: Shall be resilient seat gate valves, Mueller or American (Carmel Clay Spec. Valves shall be open right). Butterfly valves shall be used for sizes over 12". G Fittings: Shall be union rylx or "domestic" star fittings added apri116, 2011. T. Mechanical Ices: Shall be made with me else s ti fittings added a tart 0 3000 ad "domestic" ve star goes 4000 added b 6 6 4rP P 6 P aprid 18 2011 S. Valve boxes: Shall be Union Tyler orEast lemon Imn Weeks. D. Pea Caps rBox Logo: Shall be installed with each gate valve. (not to be used on butterfly valves) to. Curb boxes: Shall be union tyar. 11. Tapping sleeves: Shall be smart blab, mmaq jcm or foot full seamless steel sleeves wan stainless steel bolts and nuts. 12. Repair clamps: Shall be full circle stainless steel sleeves win stainless steel bolts and ruts. Smith Blair 261, 262 and 263, foot Ral, ❑n2 and Ray; join 131; brands sal, say and say. 13. Tapped repair clamps: (for 'L",1",1 Y", and 2" Lips on me and 2" ductile iron taps and all ductile Iron service reform) shall be full circle stainless steel sleeves with stainless steel bola and aua. Smith bleb 372; foot fs313, E323 and S333: join 502; romm 305 and 306. 14. Sample stations: Shall be installed at be utility's request and shall be kuphole mean guard 466 sampling station. IS Service lines: Shall be'L",1",IA"and 2" type it copper. 13 Underground "Mr line valves and RNings: All and MrwW service line Valves, fiWngs, seMce sadaes and meta setters shal ha reted for High Pressure and corrfam to tte mutant eride of awwa dirt) O. Bmss: Shall be no -lead compression Fittings, Pack Joints not allowed. (see over pit specs. For make and mode 4) Ido Joint restraints: Shall be field lop gaskets or mechanical bell joint restraints. 19. HDPE Sleeves: Shall be used fat service Imes that cross under city or Private streets es"& hall P service lines suse 3"hdpc elms. * 1 S" ffi 2" service lines shell use $"hope sleeve 20. Add Renal kickers: Shall be solid concrete block. No poured concrete. CARMEL WATER DETAILS PEB80932 ATE OF �r � 3 � O ie ce � � � w r U V V w � _ < o 0 F W 0 O% E ti a a _ Q � u M rt F e W d a 'N � e E oI Wsn o w Z a Wy�w�� W C; IYI Ci a too a a 5 d ZZ ^�^ O 1� Od C) 0 F•I••� i 3 w I� Q w g W _ m C1 �13 I O i n s s a c PJ �1 G Z z O Z t� F W O s,✓t Z C W F Z O Z O � � U PRAWN BY: TEN CHECKED BY: ALD PROJECT No. 1610-024 SHEET No CO