HomeMy WebLinkAbout(08) S3-1011
2
3
4
5
I
7
I
0
R
-
16.71 17 17.6 17.9 18 18 61 18 81 19 19.61 20 20.6 21 21.4 21.71 22 22.8 23
Y Y Y
I II II II I I I I I I I I I
28.-3" 28,-3" 28-3P 28,-3P 28-3P
1 8'-9114" 18-6314" 8'-511 -23/4" 18'-6314" 4'-212"I 5'-5314" 18'-6314" 1 9-8114" 18'-6314" 9-8114" 11'-1" 9-8" T. 6" 24'-4" I 5'-8"
2T-4" 28'-3" 28'-3" 26-3" 7-111/ "
re
1 ary I If
PENIN �.4 4 Aq TYP.
..101
3-30
A III
oL .I
I ° P 0 ENING -
(9 ` J - of . 25'-11112I <
ry
9
^
^P+ ) I q 4 Iq
+^� + +,� +,� f •' �' .14+ +�'
^P
�• �" II I
- - - - - - - - - - - - L
1
9 ^ d - Y CONTRCVL.JOINTS �3-301, TYP.
°^1 ro -1• (TVP.) �� OPNG. +b
s
TYP14
'1
N +y+^tPl
----� - 1'-e"WORK POINT
At y, -
oR
3-30 I I • P+ P+ I P+ � F
+
P v
9. - _ ��s� L -
F/
M.1fi
+ +^� +�" +� +ati �- - - - -1- M.9
L IT
I I I I I I I I I I I h1b I I I I �y� I I I N.1
+TTT 3 3 30
TYR 1 1
8'-51/2' l'-2314" 1T-63/4" 4'-2la' I 5'-53/4" 1 18'-63/4" 1 9-81/4" 2'-0 T-113/4" LOWT-112" 9'-81/4" 16-6" 11'-9" 1 117 15/8" T-15B" 14'-8314" 6-T51T
1'-112"
16.7 17 17.6 17.9 18 18.61 18.8 19 19.61 20 20.1 20.3 20.41 20.6 21 21.6 22 22.11 22.4 22.6122.71 23
BLDG. 3 - FIRST FLOOR PLAN
sent vva^=rs^
1. STRUCTURAL PODIUM ELEVATION = 846'-8". SEE SHEET S3-301 FOR TYPICAL COLUMN BASE PLATE REQUIREMENTS. USE
BASE PLATE AB-1 FOR ALL WF COLUMNS AND BASE PLATE AB-2 FOR ALL TUBE COLUMNS. SEE PLAN FOR COLUMN
SIZES AND LOCATIONS.
2. INTERIOR SLAB SHALL BE 4" LIGHTWEIGHT CONCRETE REINFORCED WITH 3# / CY FIBERMESH 650 OVER 4" RIGID
INSULATION. SEE DETAILS ON SHEET S3-W1 FOR TYPICAL FLOOR CONTROL JOINT AND CONSTRUCTION JOINT DETAILS.
CONTROL JOINTS SHALL NOT EXCEED 12'-0" SPACING BETWEEN CONTROL JOINTS. PROVIDE (2) #4x3'-0" LONG BARS AT
ALL RE-ENTRANT CORNERS.
3. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR EXTENT AND FINISH OF CONCRETE
FLOOR SLAB AND ANY FLOOR DEPRESSIONS, UNDERFLOOR CONDUITS, DRAINS ETC.
4. VERIFY ELEVATOR AND STAIR OPENING WITH PODIUM DRAWINGS AND ELEVATOR SUPPLIER BEFORE FORMING
OPENING IN CONCRETE SLAB AND INSTALLING MASONRY WALLS.
5. SEE CIVIL DRAWINGS FOR ALL GRADE REQUIREMENTS OUTSIDE OF CONDITIONED BUILDING FOOTPRINT.
6. SEE S3-000 SERIES SHEETS FOR GENERAL NOTES & SPECIFICATIONS.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Cannel
',"1
DATE: 10/31/19
NORTH
r
F
E
�;
1110
■1
In.,
74,E
WOOLG EUT
MCNITEMMIENOINEw11NOmOEOVATIAL
7635 Interactive Way
Suite 100
Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
W
E
cam
_O
E
U
�
J•�
J
�^,
W
U
o
Of
a
(D
L.L
C O
W
t0 V
W
C
o nt
C 9
00
a-
L
-
m E
C.)C)
m
= U
Dlssuances:
Prom. No.: 074904
Date: 10/12/18
Sheet Name:
BLDG. 3-FIRST
FLOOR FRAMING PLAN
S3=101