HomeMy WebLinkAbout(08) S3-1031 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9
R
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
DATE: 10/31/19
--
16.71 17 17 61 17 9 18 18 618 8' 19 19.61 20 20.6 21 21.41 21.7 22 22.81 23
Y Y
I I I I I I I I
8'-9114" 18'-6314" T-512" 18'-6314" 4'-212"let lee lee le
5'-5314" 18'-6314" 9'-8114" 18'-6314" 9'-8114" if'-1" 9'-8" T-IF 24'-4" 5'-8"
1'-23/4"
BLDG 3 = THIRD FLOOR FRAMING PLAN NORTH
SCALE : 1/8' = V-0"
3RD FLOOR FRAMING PLAN NOTES
1. TYPICAL WOOD FLOOR CONSTRUCTION: 3/4" GYP-CRETE TOPPING ON 3/4" SHEATHING. SEE TYPICAL FLOOR SHEATHING LAYOUT AND
ATTACHMENT DETAIL ON S3-201. SEE GENERAL NOTES FOR MORE INFORMATION.
2. SEE THE ARCHITECTURAL DRAWINGS FOR THE ACTUAL LOCATIONS OF ALL WALLS AND FLOOR OPENINGS. COORDINATE SIZE AND
LOCATION OF ALL FLOOR OPENINGS WITH ARCHITECTURAL, MECHANICAL AND ELECTRICAL DARW INGS. TRUSS SUPPLIER SHALL PROVIDE
SUPPLEMENTARY FRAMING, HEADER AND INCREASED CAPACITY REQUIREMENTS OF ADJACENT MEMBERS AS NECESSARY TO SUPPORT
INTERRUPTED FRAMING.
3. FLOOR FRAMING MEMBERSARE 18" DEEP PRE-ENGINEERED PARALLELCHORD PLATED FLOOR TRUSSESATTO BE SPACED 24' ON
CENTER (MAX.) UNLESS NOTED OTHERWISE. EXACT FLOOR TRUSS/JOIST LAYOUT AND DIMENSIONS ARE THE RESPONSIBILITY OF THE
TRUSS FABRICATOR AND FRAMING SUBCONTRACTOR. TRUSS/JOIST LAYOUT SHALL BE COORDINATED WITH THE MECHANICAL,
ELECTRICAL AND PLUMBING SUBCONTRACTORS PRIOR TO SUBMISSION OF TRUSS SHOP DRAWINGS, FABRICATION AND INSTALLATION TO
ENSURE THE PROPOSED LAYOUT PROVIDES NECESSARY CLEARANCES FOR THE MECHANICAL, ELECTRICAL AND PLUMBING TRADE
ELEMENTS, FIXTURES, DUCTING AND PIPING.
EXACT FRAMING LAYOUT SHALL BE COORDINATED WITH ALL OTHER TRADE SUBCONTRACTORS PRIOR TO INSTALLATION OR ITEMS
INCLUDING BUT NOT LIMITED TO: ELECTRIC PANELS, ELECTRIC FIXTURES (INCLUDING CAN LIGHTS), FIRE EXTINGUISHER CABINETS,
MEDICINE CABINETS, CONTROL JOINTS, DOOR FRAMING AND HVAC DUCTS/SOFFITS. IF THE LAYOUT IS CHANGED SUCH THAT THE
LOADING ON HEADERS/BEAMS IS INCREASED, THE FRAMING SUBCONTRACTOR SHALL SU BMIT A REVISED SCHEDULE OF THOSE
HEADERS/BEAMS STAMPED BY AN ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED.
4. TOP OF FINISHED FLOOR ELEV. = 872'-11 7/8"
5. SEE S3-000 SERIES SHEETS FOR GENERAL NOTES & SPECIFICATIONS.
6. HEADERS INDICATED ON PLAN REPRESENT HEADERS BELOW THE FLOOR AT THE TOP OF WINDOWS OR DOOR OPENINGS, TYP.
COORDINATE ELEVATIONS WITH ARCHITECTURAL DRAWINGS.
7. SEE WALL STUD SCHEDULE ON SHEET S3-501 FOR TYPICAL AND SPECIAL WALL FRAMING.
B. CONTRACTOR TO COORDINATE ADDITIONAL LOADING FOR BUILDING EQUIPTMENT SYSTEMS TO FLOOR TRUSSES/JOISTS WITH FLOOR
TRUSS MANUFACTURER.
9. PROVIDE TRIPLE WALL BEARING STUDS AT EACH END OF ALL HEADERS CROSSING THE CORRIDOR, THE STUDS SHALL BE CONTINOUS
DOWN TO THE STEEL LEVEL.
10. FLOOR TRUSS DESIGN LOADS AND CONSTRUCTION REQUIREMENTS ARE PROVIDED IN GENERAL NOTES ON SHEET S3-001.
11. "S-1, S-2, S-3 ETC." WALLS DESIGNATED ON PLANS ARE TO BE SHEAR WALLS: SEE APPROPRIATE SHEAR WALL ELEVATIONS ON S3-200
SERIES SHEETS AND ASSOCIATED SECTIONS AND DETAILS.
12. ALL GS14 STRAPS SHALL BE BY SIMPSON STRONG -TIE OR APPROVED EQUIVALENT.
13. THE NUMBER MARKED IN PARENTHESIS (XX) NEXT TO STRAPS INDICATES THE MINIMUM NUMBER OF FASTENERS FOR THAT SEGMENT OF
THE SPAN. ALL FASTENERS SHALL BE ED SCREW #N1 1/2" BY SIMPSON STRONG -TIE OR APPROVED EQUIVALENT. FASTENERS SHALL BE
EQUALLY SPACED ALONG THE SPAN OF THE STRAP. PROVIDE 2z BLOCKING UNDERNEATH THE STRAP AND INSTALL THE STRAP DIRECTLY
BENEATH THE FLOOR SHEATHING.
14. - DENOTES JACK STUDS.
-Y
-Y
HEADER LEGEND: SEE SHEET S3-501 FOR
HEADER SCHEDULE
HL3-9.5/21I.T13
` # OF KING STUDS ADJACENT TO JACK STUDS
L # OF JACK STUDS UNDER EACH END OF HEADER
HEADER SIZE - SEE HEADER SCHEDULE FOR ACTUAL SIZE
NOTE:
ALL JACK AND KING STUDS TO BE 2X SPRUCE
PINE FIR NO 1/NO2
WALL LEGEND:
DENOTES S"CMU
- DENOTES SHEAR WALL S-X LOCATIONS,
REFER S3-201 FOR SHEAR WALL SCHEDULES
M
M8)
M.9)
74,/
WOOLG ERT
MCNITECTNE IENGINEw11NCmCECWATIAL
7635 Interactive Way
Suite 100
G Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
F
E
D
C
B
a--+
E
cam
nO
W
n�
W
E
J
•�
J
�^,
W
U
VI
�
c
CL
K
a
O
�
L
c
>
G
C O
W
Q
(Y")
t co
my
�
C
U �
Oleo
o c
L
=
N N
0E
U
m
= m
U
Q Issuances:
Prom. No.: 074904
Date: 10/12/18
A Sheet Name:
BLDG. 3-THIRD
FLOOR FRAMING PLAN
P*2R11K