Loading...
HomeMy WebLinkAbout(08) S3-201u 2 3 5 1� 7 �i fi SHEAR WALL 3-1 FLOOR SHEATHING EDGE FASTENER SPACING END STUDS HOLD DOWNS SHEAR FASTENERS ROOF 4th FLOOR 15/32' APA RATED EXP 1 8d @ 6' O C. (2) 2x6 HDU4-SDS25 w/ 5/8' DIA. THREADED ANCHOR RODS 1/2' DIA. THRU BOLTS @ 32' O.C. 3rit FLOOR 15/32' APA EXP 1 8d @ 6' O.C. (3) 2x6 HDUB-SDS2.5 w/ 7/8' DIA. THREADED ANCHOR RODS 5/8' DIA. THRU BOLTS @ 32' O.C. F7�RATED 2ntl FLOOR 15/32" APA RATED EXP 1 8tl @ 4' O C. 6x6 POST HDU14-SDS25 w/ 1" DIA. THREADED ANCHOR RODS 5/W DIA. THRU BOLTS 32' O.C. NOTES 1. HOLDOWN REQUIRED AT END STUD, TYP. SEE PLAN FOR SHEARWALLTYPE 2. HOLDDOWNS REQUIRED ATEACH END OF SHEARWALL. INSTALL HOLDOWNS USING HARDWARE RECOMMENDED BY MANUFACTURER 3. SEE PLAN FOR SHEAR WALL TYP. 4. STRUCTURAL SHEAR WALL SHEATHING SHALL BE CONTINUOUS BETWEEN FLOORS AND CONTINUE ALL THE WAY TO THE ROOF DIAPHRAGM. DO NOT STOP SHEATHING IN THE FLOOR OR ROOF TRUSS SPACE SHEAR WALL S•1 NOTES 1. PROVIDE DOUBLE BEARING WALL STUD LAYOUT PER SCHEDULE, HEADERS AND SILL PER PLAN. 2. PROVIDE SIMPSON BP(X) BEARING PLATES AT ALL BOLTS AND ANCHOR BOLTS; ABOVE AND BELOW CONNECTION BETWEEN SOLE PLATE AND DOUBLE TOP PLATES OR BETWEEN TRUSS SHEAR PANELS. ►STeTeT� V V SH SE FOURTHFLOOR DC x x 7// SH BE THIRD FLOOR DC SI SI r Y\V y y SECOND FLOORx I 1 _AR FASTENERS, TYP. :SCHEDULE. JBLE TOP PLATE :AR FASTENERS, TYP. :SCHEDULE. JBLE TOP PLATE TEAR FASTENERS, TYP. E SCHEDULE. C7 S3-404 TYPICAL SHEAR WALL OVER JOISTS ELEVATION snAl P Irla^ = r-n• NOTES 1. PROVIDE DOUBLE BEARING WALL STUD LAYOUT PER SCHEDULE, HEADERS AND SILL PER PLAN. 2. PROVIDE SIMPSON BP(X) BEARING PLATES AT ALL BOLTS AND ANCHOR BOLTS; ABOVE AND BELOW CONNECTION BETWEEN SOLE PLATE AND DOUBLE TOP PLATES OR BETWEEN TRUSS SHEAR PANELS. AR FASTENERS, TYP. SCHEDULE. IBLE TOP PLATE EAR FASTENERS, TYP. E SCHEDULE. IBLE TOP PLATE R FASTENERS, TYP. IHEDULE. maFmFesFmm�mrrnucrRmicnriu:AL SHEAR WALL OVER BEAM ELEVATION _o Subject to compliance with all regulations of State and Local Codes City of Camel SHEAR WALL 3-2 FLOOR SHEATHING EDGE FASTENER SPACING END STUDS HOLD DOWNS SHEAR FASTENERS SHEAR PANEL 4th FLOOR 15/32' APA RATED EXP 1 Bit @ 6' O C. (2) 2x6 HDU4-SDS25 w/ 5/8" DIA. THREADED ANCHOR RODS 12' DIA. THRU BOLTS @ 32" O.C. 3d FLOOR 15/32' APA RATED EXP 1 Bit @ 4' O.C. 6X6 POST HDU11-SD82.5 w/ 1' DIA. THREADED ANCHOR RODS 1/2' DIA. THRU BOLTS @ 16" O.C. 2ntl FLOOR 15/32' APA RATED EXP 1 Sol@ 4' O C. 6X6 POST HD19 w/ 1 1/4" DIA. THREADED ANCHOR RODS 12" DIA. THRU BOLTS @ i6" O.C. NOTES 1. HOLDOWN REQUIREDAT END STUD, TYP. SEE PLAN FORSHEARWALLTYPE. 2. HOLDDOWNS REQUIRED AT EACH END OF SHEAR WALL. INSTALL HOLDOWNS USING HARDWARE RECOMMENDED BY MANUFACTURER 3. SEE PLAN FOR SHEAR WALL TYP. 4. STRUCTURAL SHEAR WALL SHEATHING SHALL BE CONTINUOUS BETWEEN FLOORS AND CONTINUE ALL THE WAY TO THE ROOF DIAPHRAGM. DO NOT STOP SHEATHING IN THE FLOOR OR ROOF TRUSS SPACE SHEAR WALL S-2 nr Al r VA. _ r-n• SHEAR WALL 3-3 FLOOR SHEATHING EDGE FASTENER SPACING END STUDS HOLD DOWNS SHEAR FASTENERS SHEAR PANEL 4th FLOOR 15/32' APA RATED EXP 1 8tl @ 6' O.C. (2) 2x6 HDU4SDS25 w/ 5/8" DIA. THREADED ANCHOR RODS 1/2' DIA. THRU BOLTS @ 32" O.C. 3d FLOOR 15/32" APA RATED EXP 1 8tl @ 4" O.C. 6x6 POST HDU11-SD82.5 w/ 1' DIA. THREADED ANCHOR RODS 1/2" DIA. THRU BOLTS 16' O.C. 2ntl FLOOR 15/32' APA RATED EXP 1 8tl @ 4' O.C. 6x6 POST HDWI SDS25 w/ 1' DIA. THREADED ANCHOR RODS 1/2' DIA. THRU BOLTS @ 16" O.C. NOTES: 1. HOLDOWN REQUIRED AT END STUD, TYP. SEE PLAN FOR SHEARWALL TYPE. 2. HOLDDOWNS REQUIRED AT EACH END OF SHEAR WALL. INSTALL HOLDOWNS USING HARDWARE RECOMMENDED BYMANUFACTURER 3. SEE PLAN FOR SHEAR WALL TYP. 4. STRUCTURAL SHEAR WALL SHEATHING SHALL BE CONTINUOUS BETWEEN FLOORS AND CONTINUE ALL THE WAY TO THE ROOF DIAPHRAGM. DO NOT STOP SHEATHING IN THE FLOOR OR ROOF TRUSS SPACE SHEAR WALL S-3 arAlr 1fW_1 -W SHEAR WALL S-4 FLOOR SHEATHING EDGE FASTENER SPACING END STUDS HOLD DOWNS SHEAR FASTENERS SHEAR PANEL 4th FLOOR 15/32" APA RATED EXP 1 10d @ 6" O.C. (3) 2x6 HDU8SDS2.5 W/ 7/8" DIA THREADED ANCHOR RODS 5/8' DIA. THRU BOLTS @ 32" O.C. 3rd FLOOR 15/32" APA RATED EXP 1 10d @ 4' O.C. 6x6 POST HDU14-SDS2.5 w/ 1' DIA. THREADED ANCHOR RODS 5/8" DIA. THRU BOLTS @ 16' O.C. 2ntl FLOOR 15/32" APA RATED EXP 1 10d @ 3' O.C. (6) 2x6 (2) HDU14-SDS2.5 W/ 1" DIA THREADED ANCHOR RODS 5/8' DIA. THRU BOLTS @ 16" O.C. Ullt�. 1, HOLDOWN REQUIRED AT END STUD, TYP. SEE PLAN FOR SHEARWALL TYPE. 2. HOLDDOWNS REQUIRED AT EACH END OF SHEAR WALL. INSTALL HOLDOWNS USING HARDWARE RECOMMENDED BY MANUFACTURER 3. SEE PLAN FOR SHEAR WALL TYP. 4. STRUCTURAL SHEAR WALL SHEATHING SHALL BE CONTINUOUS BETWEEN FLOORS AND CONTINUE ALL THE WAY TO THE ROOF DIAPHRAGM. DO NOT STOP SHEATHING IN THE FLOOR OR ROOF TRUSS SPACE SHEAR WALL S•4 SCALE. 10 = V-0" II II II II II II II II II I I II I I I II II II II II I I I II II I I II II II I I I II II II II II II II I I I II II II I II I II II I I II II I II II II II II I I I II II II II II II I II I I I II II II II I II II I I II I II II II II II I I II I II I II II II II II I I II II I II I II II II II I II II II II I II II II II II II II II II II II II II I II II I I I II II I I II II II II II II II II II II II II II II I II II II I I II II II II II I I I I I I II II I II II II II II II I I I I I II II II II I I II II II I I I II II I I II II II I I II II II II II II II I I I II II I II II II II I II II I I II I II I I II II I II I I I II II II I II II I I I I I I II I I II II II II I I II II II II II I I I II II II II I II I I II II I III II I II I II II II II I N II II II I I II II II I II II II II II I II II II II II I II I I I II II II I I II II I II II I I I I II I II II II II II II II II II II I I I II I I II II II II II II I II II II I I II II II II II I I I I I II II I II II II I I II II I II II II I II II II I II I II I II II II II I II I II I II II I II I I II I I I II II II II II I II II I II II I II I II II I II II I I I II I I I II II I II II I II II I I II I I I II I I II II I I I II I I II I I II II BOUNDARY NAILING @ T O.C. (TYP') FLOOR SHEATING NOTES FLOOR SHEATHING SHALL BE GLUED AND NAILED TO FLOOR FRAMING WITH 3' 10d COMMON NAILS WITH 1 11T MIN. EMBEDMENT. EDGE NAILING (ROOF) @ 6' O.C. (FLOOR) @ 6' O.C. ROOF SHEATHING NOTES: ROOF SHEATHING SHALL BE NAILED TO ROOF FRAMING WITH 212' 10d COMMON NAILS WITH 112" EMBEDMENT TYPICAL SHEATHING LAYOUT FRAMING - SEE PLAN (TYP.) 3/8" MIN. EDGE DISTANCE FOR NAILS (TYP.) STAGGER SHEATHING JOINTS LONG DIMENSION OF SHEATHING TO RUN PERPENDICULAR TO FRAMING INTERMEDIATE NAILING (ROOF) @ 6" O.C. (FLOOR) @ 12' O.C. r SHEATHING MINIMUM SHEATHING SHEET IS 2'x4' (TYP.) SHEAR WALL SHEATHING WITH SPECIFIED ATTACHMENT IS REQUIRED ON ONE FACE OF THE WALL ONLY. EXTERIOR FACES AND NON -CORRIDOR FACES SHALL RECEIVE SHEATHING. SEE PLANS FOR SHEAR WALL LOCATIONS. SEE S34)01 FOR ADDITIONAL SHEAR WALL SHEATHING REQUIREMENTS. NOTES 1. EXTERIOR WALL SHEATHING REFERENCE S3-001. 2. AT WALL LOCATIONS WHERE MULTIPLE STUDS ARE REQUIRED TO SUPPORT VERTICAL LOADS, A CONTINUOUS LOAD PATH SHALL BE PROVIDED TO SUPPORT THOSE LOADS THROUGH THE STRUCTURE TO THE FOUNDATIONS. THIS MAY BE ACCOMPLISHED THROUGH THE USE OF RIM JOISTS, SQUASH BLOCKS OR OTHER APPROPRIATE MEANS BASE ON LOCATION AND DETAILING CONSIDERATIONS. 3. PROVIDE A MINIMUM ONE STUD FOR EACH STUD OCCURRING ON THE FLOOR ABOVE UNLESS ADDITIONAL STUDS ARE ALSO REQUIRED. 4. SEE SHEAR WALL SCHEDULE FOR ADDITIONAL REQUIREMENTS. 5. AT EXTERIOR WALLS PROVIDE FIRE RETARDANT TREATED SHEATHING 4'-0" EITHER SIDE OF INTERSECTING 2 HOUR RATED WALLS, SEE ARCH. \,/ WOOLG ERT MCNITEOUE IENGINEE INCmCEWPATIAL 7635 Interactive Way Suite 100 O Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 F E L Ito �j U � J•� J �A K U � cn o a � L co €W W N W C o nt C 9 � LOE U � m = U wLlssuances- Prom. No.: 074904 Date: 10/12/18 A Sheet Name: SHEAR WALL ELEVATIONS S3=201 DATE: 10/31/19