Loading...
HomeMy WebLinkAbout(08) S3-504F 1 1 2 EXTERIOR OR SHEAR WALL SHEATHING; SEE PLAN FOR WALLTYPE FINISH FLOOR SEE PLAN DOUBLE TOPPLATE BRICK VENEER; REF. ARCH. WOOD STUDS PER WALL SCHEDULE STEEL LOOSE LINTEL, REF. S3-001 HEADER PER PLAN WINDOW SYSTEM; REF. ARCH. TRUSS BEARING BELOW TOP OF HEADER RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel ',"16 DATE: 10/31/19 3 1 4 1 5 1 6 1 7 4x10 BLOCKING EACH SIDE OF HSS-5.5x5.5 COLUMN AS SHOWN TOP /GYPCRETE 3nd FLOOR- 873'-4" 4th FLOOR = 884'-4" 6-0" SIMPSON STRAP C---__•_• �— ----- PRE-ENGINEERED FLOOR TRUSS PLAN VIEW 4X10 BLOCKING ATTACHED TO HSS-5.5x5.5 COLUMN WITH (3) 5/8" DIA. THRU-BOLTS AS SHOWN(TYP.) 8' 0" (2) SIMPSON CS14 x V-0" LONG FILL EVERY OTHER HOLE WITH lodFILL NAILS 3/4" GYP-CRETE (TYP.) APA RATED SHEATHING - PRE-ENGINEERED - FLOOR TRUSS (TVP.) #4x CON 2nd FLOOR 862'-4" C OF CONCRET � e4ra^ TOP OF PODIUM 4 846E 8' SECTION AT SIGN SUPPORT SCALE : 1"- V-0" 8 I EAC I E OF COL SI CONT. 2x4 1 312" I I I 81 HSS6 1/2"x5 1/2"x5/16" COLUMN WITH BASE PLATE AT THE PODIUM LEVEL AND SHALL BE FULL HEIGHT OF BUILDING. COLUMN SHALL BE BRACED TO THE W24 AT THE SECOND FLOOR. SEE ARCH DRAWINGS FOR ACTUAL COLUMN LOCATION WITHIN WALL. SIGN ATTACHMENT BY OTHERS. PROVIDE MINIMUM OF (5) CONNECTIONS TO STRUCTURE AT4'-0" MIN. SPACING — PROVIDE 2x HORIZONTAL BLOCKING AT EACH SIGN ATTACHMENT POINT. 10'-0" MINIMUM TOTAL LENGTH OF BLOCKING. — SIGN ATTACHMENT BY OTHERS. PROVIDE MINIMUM OF (5) CONNECTIONS TO STRUCTURE AT4'-6" MIN. SPACING - — (2)2x TOP PLATE EACH SIDE OF COLUMN SHEATHING — MASONRVVENEER MAY OCCUR, SEE ARCH. WOOLG ERT MCHITEMMIENGINEEIINGIGEOVATIAL 7635 Interactive Way Suite 100 O Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 F E wifEENJ A� D E cam E U � C J '— J �^, W Jib"IN WALL. U FART AT PODIUM � rn �+ NUE UP TO THE t= V/ VEL. CL of4GS FOR O O 4 WITHIN WALL €o N V � U � C o CR m O C U La m on B S Q Issuances: Prom. No.: 074904 Date: 10/12/18 A Sheet Name: WOOD FRAMING DETAILS R*1&711z1A]