Loading...
HomeMy WebLinkAbout(14) P3-1001 2 3 0 5 0 7 C I) Na RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel DATE: 10/31/19 SECOND FLOOR PLAN - PLUMBING 1/6" = 1'-0" 1/8" = 1'-0" O DRAWING NOTES I PIPING STUB PROVIDED UNDER GARAGE PACKAGE. CAP BELOW NEW FLOOR LEVEL UNDER BUILDING #3 WORK. 2 PROVIDE CONNECTION TO PIPING STUB PROVIDED UNDER GARAGE PACKAGE. 3 PROVIDE COLD WATER STUB FOR RETAIL SPACE. 4 PROVIDE ACCESS PANEL. 5 STUB VENT PIPING AT 1ST FLOOR CEILING. HOLD AS HIGH AS POSSIBLE. 6 COLD WATER SUPPLY TO UPPER FLOORS. 7 DASHED LINES INDICATE CHASE OPENING PROVIDE INDIVIDUAL SUPPLY TO EACH MECHANICAL CLOSET. 9 RISE GAS PIPING TO UNDERSIDE OF SECOND FLOOR. 10 STUB 2-1/2" GAS PIPING AT UNDERSIDE OF SECOND FLOOR FOR RETAIL SPACE. 11 RISE 2" GAS PIPING TO JANITORS CLOSETS TO SERVE MECHANICAL UNITS. 12 2" GAS RISER FROM FIRST FLOOR. 13 EXTEND 3/4" GAS FROM RISER TO INSTANTANEOUS UNIT. PROVIDE VALVE AT CONNECTION AND DIRT LEG AT BASE OF RISER. 14 EXTEND 1-1/2" GAS RISER TO THIRD AND FOURTH FLOORS. 15 PROVIDE DOMESTIC HOT WATER FROM HEATER TO MOP BASIN MB-1. 16 GAS RISERS TO SECOND THRU FOURTH FLOORS. 1k1/ W®®LPE RT IRCRITEETYREjINGINEERINGICEMATIAL 7635 Interactive Way Suite 100 G Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 F E n� W D OL nO \W\ n/ _ W E U � C J '— .J �^1 W � U � cn o � co € p nM U W `o m co o c U m B GU Q Issuances: REV oacREmuN MTe 0 Issued For Building 3 Reviee 10/12/18 1 Issued For Building 3 Permit 06/10/19 2 ASI#10 09/11/19 Prom. No.: 074904 Date: 06/10/19 A Sheet Name: PLUMBING FIRST AND SECOND FLOOR PLANS P3=100