RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 10/31/19
SECOND FLOOR PLAN - PLUMBING
1/6" = 1'-0"
1/8" = 1'-0"
O DRAWING NOTES
I PIPING STUB PROVIDED UNDER GARAGE
PACKAGE. CAP BELOW NEW FLOOR LEVEL
UNDER BUILDING #3 WORK.
2 PROVIDE CONNECTION TO PIPING STUB
PROVIDED UNDER GARAGE PACKAGE.
3 PROVIDE COLD WATER STUB FOR RETAIL
SPACE.
4 PROVIDE ACCESS PANEL.
5 STUB VENT PIPING AT 1ST FLOOR CEILING.
HOLD AS HIGH AS POSSIBLE.
6 COLD WATER SUPPLY TO UPPER FLOORS.
7 DASHED LINES INDICATE CHASE OPENING
PROVIDE INDIVIDUAL SUPPLY TO EACH
MECHANICAL CLOSET.
9 RISE GAS PIPING TO UNDERSIDE OF SECOND
FLOOR.
10 STUB 2-1/2" GAS PIPING AT UNDERSIDE OF
SECOND FLOOR FOR RETAIL SPACE.
11 RISE 2" GAS PIPING TO JANITORS CLOSETS
TO SERVE MECHANICAL UNITS.
12 2" GAS RISER FROM FIRST FLOOR.
13 EXTEND 3/4" GAS FROM RISER TO
INSTANTANEOUS UNIT. PROVIDE VALVE AT
CONNECTION AND DIRT LEG AT BASE OF
RISER.
14 EXTEND 1-1/2" GAS RISER TO THIRD AND
FOURTH FLOORS.
15 PROVIDE DOMESTIC HOT WATER FROM
HEATER TO MOP BASIN MB-1.
16 GAS RISERS TO SECOND THRU FOURTH
FLOORS.
1k1/
W®®LPE RT
IRCRITEETYREjINGINEERINGICEMATIAL
7635 Interactive Way
Suite 100
G Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
F
E
n�
W
D
OL
nO
\W\
n/
_ W
E
U �
C J '—
.J �^1
W �
U
� cn
o �
co €
p nM
U
W `o m
co
o c
U m
B GU
Q Issuances:
REV
oacREmuN
MTe
0
Issued For Building 3 Reviee
10/12/18
1
Issued For Building 3 Permit
06/10/19
2
ASI#10
09/11/19
Prom. No.: 074904
Date: 06/10/19
A Sheet Name:
PLUMBING FIRST AND
SECOND FLOOR
PLANS