Loading...
HomeMy WebLinkAbout(18) E3-1011 1 2 1 3 1 4 1 5 1 6 r 8 1 9 Q DRAWING NOTES R U W W W M O C a ym O rn e n m E D .E U 2 (L a` a RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and focal Codes City of Cannel DATE: 10/31/19 n FIRST FLOOR -LIGHTING ``% 1/8"=1'-0" NORTH n PARKING LEVEL - LIGHTING �� 118,-1, NORTH 1 PROVIDE (2) 1" CONDUITS FROM LIGHTING CONTROL PANEL STUBBED OUT TO JUST OUTSIDE BUILDING FOR FUTURE EXTERIOR LIGHTING. COORDINATE WITH SITE DRAWINGS. 2 REFER TO DETAIL #1/E-501 FOR LIGHTING CONTROL PANEL REQUIREMENTS. 3 MOUNT TYPE Z1 OR Z2 FIXTURES ON STORE FRONT ABOVE DOOR. COORDINATE WITH STORE FRONT CONTRACTOR. 1 2 NORTH KEY PLAN W®®LPE CST IRCRITEETYREjINGINEERIN616EMATIAL 7635 Interactive Way Suite 100 G Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 F E II• 10 L] NO Kl1M47 STAI E OF W OL O U � .J �^1 W � U F (n o p €cam Q my Una c `o W m co o c �U Q Issuances: REv DEscanmoN MTE 0 Issued For Building 3 Review 10/12/18 1 Issued For Building 3 Permit 06/10/19 Prom. No.: 074904 Date: 08/08/18 A Sheet Name: LIGHTING PLAN - PARKING AND FIRST FLOOR E3=101