HomeMy WebLinkAbout(04) C200a
a
0
d
0
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
�AfT�tDwV1(AQA�
DATE: \ 10/31/19
Z
0 40 80 120
GRAPHIC SCALE IN FEET
L�-----------------" C
------------------------------- _
— r-- — — — — — {--�
-E)j-END PROPOSED R/W -eU J —
I
VETERANS WAY — IT1
N (vulMc a1aLE0 PROPOSED R/W n \
_ ro52
25, DUKE
ELECTRIC ESMT '.:. 10%A.
II L
—TT
1 INTERSECTION TO
BE CONSTRUCTED
AS A PART OF THE
BUILDING 1 W BUILDING 4 VETERANS WAY
—
BUILDING 2
\,I ••• ,
in Nor
\LOFFICE BUILDING
_ 0
7�---� — _�
L� L�
I
19, 1 1 19,
1
FUTURE
TAVERN
1I—
IW
in
IW BUILDING 5
IW
IW
I
L_—�,—
TT Cr-Cr-0 -a a- Cr-0-0 V�
I BUILDING 3 Si
I
Iu
0
L-A
L
�- / MIT. �� Tj
5'(ODIU l (
---
54.6
W
31' B/B >
�w
0„ I
54.4'
W
w
X
W
milk f r I�
/ INTERSECTION
IN CONTRACT
NOT II
\ I
T -L �I I
L-
LL
li
I
W
NN�
1.�
0
PARKING SUMMARY
>
F-
LOCATION DUANTIIY
VETERANS DRIVE 33
SOUTH RANG NE ROAD 09
V
PODIUM (UPPER LEVEL) 73
W
PARKING IN BLDG 1M 33 1
x
TOTAL 659
W
Q�O,fp1STVi
m lossseel
WATE OF
06/10/19
PAVEMENTLEGEND
O LIGHT DUTY ASPHALT CONS
FUTURE ASPHALT i ASPHALT
HEAVY DUTY CONCRETE FUTURE CONSTRUCTION
z
LD
3
m
€
Y ACCESSIBLE PARKING NUMBER OF PARKING
>
W
0.
OY
SXiN OS SPACES
SIGN
K
0
m
LIGHT POLE PARKINGACCESSIBLE
PAVEMENT SYMBOL
M 0 M LIMITS OF CONSTRUCTION
j
o
,O
m
v
SITE
NOTES
a
1.
ALL DIMENSIONS IN CURBED AREAS SHALL BE BALK TO BACK OF CURB.
-ALL DIMENSIONS IN AREAS WITHOUT CURB Si BE TO EDGE OF
O
PAVEMENT.
-ALL DIMENSIONS AT INTEGRAL CURB k WALK SHALL BE TO BACK OF
p
CURB.
z
C
-ALL DIMENSIONS FROM BUILDING SHALL BE FROM FACE OF BUILDING.
2.
ALL RADII IN PAVED AREAS AND ON CURBS SHALL BE 5' FACE OF CURB
00
UNLESS NOTED OTHERWISE.
3.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD BEFORE
0 a
N
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
z m
<
m
ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE
f
7
Z
PLANS FROM ACTUAL FIELD CONDITION, THE CONTRACTOR SWILL CONTACT
U ^
LU
O
m
rn
m
A/E IMMEDIATELY.
O
W
0
4.
PROVIDE SMOOTH TRANSITION FROM NEW AREAS TO EXISTING FEATURES AS
Q
W K
Y
NECESSARY.
OL
O
❑ ❑
U
5,
ALL AREAS WHERE THE EXISTING PAVEMENT OR PAVEMENTS ARE DAMAGED
DURING CONSTRUCTION FROM TRAFFIC BY THE GENERAL CONTRACTOR,
SUBCONTRACTORS, OR SUPPLIERS SHALL BE RESURFACED OR
RECONSTRUCTED AT LEAST TO THEIR ORIGINAL CONDITION AFTER
CONSTRUCTION WORK IS COMPLETED.
S.
ALL RADII INDICATED SHALL BE FORMED AS CIRCULAR ARCS.
m
>,
7.
ALL DIMENSIONS ARE PARALLEL AND PERPENDICULAR TO BASE UNES,
m
N
PROPERTY LINES OR BUILDING UNES UNLESS OTHERWISE NOTED.
o
8.
ACCESSIBLE RAMPS AND SIGNAGE SHALL BE IN ACCORDANCE WITH
=
FEDERAL, STATE, COUNTY, CITY AND LOCAL CODE WHICHEVER WAS
U
�i
JURISDICTION. SEE SITE PLAN FOR LOCATION AND SITE DETAILS FOR
N
N
SPECIFICATIONS.
m
9.
ALL STRIPES ARE TO BE 4' PAINTED, WHITE. UNLESS OTHERWISE NOTED.
10.
THE CONTRACTOR
TOBRD PROVIDE BE RESPONSIBLE TO IS EXPENSE
AN DEVICES
ALL AUTOMOBILEN P PEDESTRIAN TRAFFIC CONTROLSREQUIRED BY
r N
U.
FEDERAL, STATE, COUNTY, CITY OR LOCAL AGENCY. THE AMOUNT,
LOCATION AND SIZE SNAIL BE PER DIRECTION OF AGENCY.
F
11.
R IS THE RSPONSIBIL17Y OF THE CONTRACTOR TO REMOVE ALL MUD, DIRT,
GAVEL, AND ANY OTHER MATERIALS TRACKED ONTO ANY PUBUC OR
PRIVATE STREETS OR SIDEWALKS. THE CONTRACTOR MUST CLEAN THESE
W
ONLY IF NECESSARY. THE CONTRACTOR MUST USE WATER OR OTHER
METHODS TO KEEP AIRBORNE DUST TO A REQUIRED MINIMUM.
11111
CL
4
12.
THE DEVELOPER IS RESPONSIBLE FOR COMPLETING ALL IMPROVEMENTS IN
01
J
COMPLIANCE WITH CITY STANDARDS AND ORDINANCES.
O
13.
THE PROJECT ENGINEER IS RESPONSIBLE FOR DESIGN OF ALL
0
IMPROVEMENTS IN COMPLIANCE WITH CITY STANDARDS AND ORDINANCES.
14.
ALL PAVEMENT WITHIN THE PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH
CITY STREET PAVEMENT DETAILS.
15.
24 HOUR ADVANCE NOTICE MUST BE GIVEN TO THE CITY ENGINEER FOR
PROOF ROLL (317-887-5230) PRIOR TO INSTALLATION OF STONE AND
PAVEMENT WITHIN PUBLIC RIGHT-OF-WAY.
15.
STORMWATER FCIUTES WILL BE PRIVATELY OWNED AND MAINTAINED.
Ia.
PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS THE BITUMINOUS BASE
AND BINDER LAYERS FOR ALL STREET, DRIVES AND PARKING LOTS TO BE
U
INSTALLED AND ALL WATER MAINS AND HYDRANTS FOR THE SITE
DEVELOPMENT MUST BE INSTALLED PER APPROVED SPECIFICATIONS AND
J
MADE SERVICEABLE.
J
17.
ALL CONCRETE CURB IN THE PARKING LOT SHALL BE CITY OF CARMEL
❑
STANDARD STRAIGHT CURB OR CURB AND GUTTER (CHNRBACK) AS NOTED.
O
_
Of
18.
ALL CONCRETE CURB IN THE CITY RIGHT-OF-WAY SHALL BE CITY OF
CARMEL STANDARD CHAIRBACK CURB.
Z
Q
19.
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY
Z
W
J^
TOOIRREMENTS OF THE ENT OFW
am
ENNGGIINEERING.RTMTO�ENTRRA SHAIl CONTACT THE DEPARTMENT OF
LD
ENGINEERING TO SCHEDULE A PRE -CONSTRUCTION MEETING TO REVIEW THE
S
DEPARTMENTS CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION
Ly
`
= QLU
REQUIREMENTS, REWIRED INSPECTIONS FOR CERTAIN STAGES OF WORK,
AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS T RELATES TO
I 1
O
_
WORK WITHIN THE EXISTING APROPOSED CRY RIGHT-OF-WAY.
NO
V
O
O
20.
SEE SHEETS C201 AND C202 FOR DETAILED NOTATIONS AND DIMENSIONS.
J
O
wil W
J
W
2
21.
LONG TERM BICYCLE PARKING SHALL BE PROVIDED IN PARKING GARAGE.
SEE SHEE C700 FOR BICYCLE RACK DETAIL
W
>
J
am
>
LU
Q
C,
Q
LU
W
2J
a
~
LU
O
O
C
UU
W
3
Q
U
T•zv=ii
F�, 0