Loading...
HomeMy WebLinkAbout(08) S2-101A1 3 4 5 7 L, W R n 3.4 n 4.5 3D'-0. Y. 1'-30 W-11n' IN-1112' L 28'-3. 28'-3. BLDGw 2 - FIRST FLOOR FRAMING PLAN - Area A SCALE : 3/16" = l'-0" 1ST FLOOR: FLOOR FRAMING PLAN NOTES: 1. TOP OF FINISH FLOOR = 849'-10°, TOP OF WOOD TRUSS =- 1 112" FROM TOP FINISH FLOOR (3/4' OSB 3/4' GYPCRETE). 2. FLOOR SHEATHING, REF SHEET S2-001, UNLESS OTHERWISE NOTED ON PLAN. FLOOR SHEATHING IS APPLIED PERPENDICULAR TO TRUSSES UNLESS OTHERWISE NOTED. 3. FLOOR FRAMING MEMBERS ARE 18" DEEP PRE-ENGINEERED PARALLEL CHORD PLATED FLOOR TRUSSES TO BE SPACED AT 24"ON CENTER MAX. UNLESS NOTED OTHERWISE. EXACT FLOOR TRUSS/JOIST LAYOUT AND DIMENSIONS ARE THE RESPONSIBILITY OF THE TRUSS FABRICATOR AND FRAMING SUBCONTRACTOR. TRUSSMOISTSUBCONTRACTORS LAYOUT SHALL BE COORDINATED WITH US THE MECHANICAL, ELECTRICAL AND PLUMBING SUBCONTRACTORS PRIOR TO SUBMISSION N TRUSS SHOP DRAWINGS, FABRICATION AND INSTALLATION TO ENSURE THE PROPOSED ELEMENTS, , FIXTURES, ES NECESSARY CLEARANCES FOR THE MECHANICAL ,ELECTRICAL AND PLUMBING TRADE ELEMENTS, FIXTURES, DUCTING AND PIPING. EXACT FRAMING LAYOUT SHALL BE COORDINATED WITH ALL OTHER TRADE SUBCONTRACTORS PRIOR TO INSTALLATION OR ITEMS INCLUDING BUT NOT LIMITED TO: ELECTRIC PANELS, ELECTRIC FIXTURES (INCLUDING CAN LIGHTS), FIRE EXTINGUISHER CABINETS, MEDICINE CABINETS, CONTROL JOINTS, DOOR FRAMING AND HVAC DUCTS/SOFFITS. IF THE LAYOUT IS CHANGED SUCH THAT THE LOADING ON HEADERS/BEAMS IS INCREASED, THE FRAMING SUBCONTRACTOR SHALL SUBMIT A REVISED SCHEDULE OF THOSE HEADERS/BEAMS STAMPED BY AN ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED. 4. FLOOR TRUSS DESIGN LOADS AND CONSTRUCTION REQUIREMENTS ARE PROVIDED IN GENERAL NOTES ON SHEET S2-001. 5. HEADERS SHOWN ON FLOOR PLAN ARE FOR OPENINGS BELOW THE FLOOR AND SUPPORT THE FLOOR FRAMING SHOWN ON PLAN. 6. SEE ARCHITECTURAL DRAWINGS FOR ALL OPENING LOCATIONS AND SIZES. TRUSS SUPPLIER SHALL PROVIDE SUPPLEMENTARY FRAMING, HEADER AND INCREASED CAPACITY REQUIREMENTS OF ADJACENT MEMBERS AS NECESSARY TO SUPPORT INTERRUPTED FRAMING. 7. "S-1, S-2, S-3 ETC." WALLS DESIGNATED ON PLANS ARE TO BE SHEAR WALLS: SEE APPROPRIATE SHEAR WALL ELEVATIONS ON S2-200 SERIES SHEETS AND ASSOCIATED SECTIONS AND DETAILS. 8. SEE THE WALL STUD SCHEDULE ON SHEET S2-501 FOR TYPICAL AND SPECIAL WALL FRAMING, DENOTED EW-1 AND CW-1. nrn10TES JACK STUDS. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel '"1G, DATE: 10/31/19 OKEYNOTES 705 PONY WALL BELOW HEADER LEGEND: SEE SHEET S2-501 FOR H EAD ER SCHED ULE HL3-9.5/2.3 L# OF KING STUDS ADJACENT TO JACK STUDS # OF JACK STUDS UNDER EACH END OF HEADER HEADER SIZE -SEE HEADER SCHEDULE FOR ACTUAL SIZE NOTE: ALL JACK AND KING STUDS TO BE 2X6 SPRUCE PINE FIR NO 1/NO 2 P1 INDICATES BX6 DFL NO 1 AS JACK STUD BLDG. 2 NORTH KEY PLAN \,/ WOOLG ERT MCNITEUL E IENGINEWINGIGEOWATIAL 7635 Interactive Way Suite 100 G Indianapolis, IN 46278 317.299.7500 FAX: 317.291.5805 F E r Iy 03 In., WfEENJ W E cam U � J•� J W � U Of o a � L 0 Q) N € o � � tE V W C O n1 C 00 a— L - N E �E U m So Qlssuances: Prom. No.: 074904 Date: 05/01/19 Sheet Name: BLDG. 2-FIRST FLOOR FRAMING PLAN - AREA A S2=101 A