HomeMy WebLinkAbout(14) P2-1011
2
3
0
5
0
7
E
0
Na
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 10/31/19
THIRD FLOOR PLAN
3/32" = 1I-0"
SECOND FLOOR PLAN
3/32" = 1I-0"
O DRAWING NOTES
1 1-1/2" GAS RISER FROM FIRST FLOOR.
2 EXTEND 3/4" GAS FROM RISER TO
INSTANTANEOUS UNIT. PROVIDE VALVE AT
CONNECTION AND DIRT LEG AT BASE OF
RISER.
3 EXTEND 1" GAS RISERTO THIRD FLOOR.
4 1" GAS FROM SECOND FLOOR. EXTEND TO
INSTANTANEOUS HTR. PROVIDE VALVE AT
CONNECTION AND DIRT LEG AT BASE OF
CONNECTION.
1 2
NORTH
KEY PLAN
1k1/
WOOLPERT
IRCRITEETYREjINGINEERINGICEMATIAL
7635 Interactive Way
Suite 100
G Indianapolis, IN
46278
317.299.7500
FAX: 317.291.5805
F
E
D
OL
nO
W
n�
_ W
r)
FZ
U �
C J '-
J �^1
W �
Qum
U
� cn
o �
N €W
p n1
a% U c
W `o m
co
o c
U G€
B m Go
Q Issuances:
REV
DEacREmuN
MTe
0
Issued For Building 2 Reviee
iO5/18
1
Issued For Building 2Permit
05101/19
2
ASI#10
09/11/19
Prom. No.: 074904
Date: 04/26/19
A Sheet Name:
PLUMBING SECOND
AND THIRD FLOOR
PLANS
P2=101