HomeMy WebLinkAboutMechanical M3.0RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel DATE: 10/31/19 MECHANICAL SPECIFICATIONS I. GENERAL PROVISIONS A. GENERAL CONDITIONS, CODES B STANDARDS 1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (All AND MY OF THE OWNER'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTEDOTHERWISE. 2.REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL AND SPECIAL CONDITIONS OF THE MA FOR ADDITIONAL REQUIREMENTS REGARDING; SAFETY, COORDINATION 8 COOPERATION, WORKMANSHIP, PROTECTION, CUTTING AND PATCHING, DAMAGE TO OTHER WORK, PRELIMINARY OPERATIONS,STORAGE, ADJUSTMENTS, CLEANING, ETC. 3.ALL WORT( SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL SFATE AND LOCAL CODES AND ORDINANCES INCLUDING MY SPECIAL THE OWNER REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. 4.00NTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR B. SCOPE OF WORT( 1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH 15 OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE OWNER ACOMPLETE, CODE APPROVED AND OPERATIONAL MECHANICAL SYSTEM. 2.CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH ALL TRADES'WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID INTERFERENCES. MY CONFECT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER BEFORE WORK IS COMMENCED. 3.00NTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS, NOTE THE EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED, AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NOALLOWANCE SHALL BE MADE TO THE CONTRACTOR BY REASON OF THIS FAILURE TO HAVE MADE SUCH EXAMINATION OR OF ANY ERROR ON HIS PART. 4.ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDTIONAL COST TO THE OWNER S.PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF HVAC WORK. ALL CORE DRILLING OR CUTTING OF FIRE RATED FLOORS, SHAFTS, AND WALLS SHALL BERESTORED PRIOR TO FINISH PATCHING. ALL PENETRATIONS SHALL BE FIRE SEALED TO MATCH THE FIRE RATING OF THE FLOORS, SHAFT$ AND WALLS PENETRATED. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE OPENINGS IN WALLS AND FLOORS WITH THE GENERALTRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL DUCT, PIPE AND LOUVER OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. ETHIS CONTRACT SHALLALSO INCLUDEALL LABOR MATERIALS AND MISCELLANEOUS EXPENSES REQUIRED FOR ALL REQUIRED MECHANICAL DEMOLITION OF THE EXISTING AREAS BEING RENOVATED. a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY DISPOSED OFF SITE UNLESS OTHERWISE NOTED) OF ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, MATERIALS, ETC. NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE MECHANICAL HVAC SYSTEMS FOR THE NEW RENOVATED AREAS. b. ALL UNUSED SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE MAIN AND CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN IT'S ENTIRETY. t COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE ARCHITECT AND THE OWNER'S GENERAL REQUIREMENTS. d. DEMOILITION SHALL NOT AFFECT THE OPERATION OF SYSTEMS THAT ARE TO REMAIN IN OPERATION.ITEMS TO REMAIN THAT MAY BE DAMAGED BY THE CONTRACTOR SHALL BE REPLACED ANl REPAIRED AT THE CONTRACTORS EXPENSE. e. THIS CONTRCATOR MUST COORDINATE HIS WORK WITH OTHER TRADES OR OWNER THAT MAY BE DOING DEMOLITION. f. ANY ASBESTOS REMOVAL SHALL BE THE RESPGSIBILITY OF THE OWNER FOR REMOVAL AND IS NOT APART OF THIS CONTRACT. T&I- WORK INCLUDING, BUT NOT UNITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND OWNER. WHERE AN EQUIPMENT MANUFACTURER HAS AWARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT. C. DOCUMENTS 1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE WITH NO ADUITIONAL COST TOTHEOWNER. 2.ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID. 3.THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH. 4.IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR BETWEEN THE SAME, OR BETWEEN THE FIGURES ON THE DRAWINGS, AND THE SCALE OF SAME OR BETWEEN THE LARGER AND SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS SHALL BE REFERRED TO THE OWNER FOR REVIEW AND FINAL DECISION PRIOR TO THE BID DUE DATE. ETHE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL AND MUST BE SUBMITTED AS SPECIFIED IN THE ARCHITECTURAL DOCUMENTS. 6.10ISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS ASSET IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. D. COORDINATION 1.CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT MY EXISTING SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE CONTRAC FOR CAUSING THE DAMAGE. 2.EACH CONTRACTORSHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR HIS SUB -TRADE'S PERSONNEL ALL PATCHING REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE OWNER BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE PAID BY THE CONTRACTOR CAUSINGTHEDAMAGE. E. METHODS 1. EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM MY CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL ENGINEER 2.ALL ROOF PENETRATIONS, FLASHINGS AND COUNTER FLASHINGS SHALL BE PERFORMED BY THE OWNER'S ROOFING CONTRACTOR AT THE REQUESTING CONTRACTOR'S COST. F. SUBMITTALS 1. SHOP DRAWINGS SHALL BE PROVIDED TO THE ARCHITECT OF ALL EQUIPMENT AND ACCESSORIES PROVIDED FOR THE PROJECT WHETHER SPECIFIED HERE -IN OR ON THE DRAWINGS. REVIEW OF THE SHOP DRAWINGS SHALL BE FOR GENERAL DESIGN CONCEPT AND ADHERENCE WITH THE SPECIFICATIONS. QUANTITY OF SHOP DRAWINGS SUBMITTED SHALL BE AS SPECIFIED BY THE ARCHITECT. SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR SHOWING LOCATIONS AND MEASUREMENTS FROM COLUMNS OF ALL CONCEALED AND EXPOSED PIPING, DUCTWORK, CONDUIT, EQUIPMENT, ACCESSORIES, ETC., AND SUBMITTED PRIOR TO INSTALLATION. THE OWNER MAY MAKE REPRODUCIBLE COPIES OF THEIR DRAWINGS AVAILABLE FOR USE IN PREPARATION OF SHOP DRAWINGS, HOWEVER THE OWNER SHALL NOT BE HELD RESPONSIBLE FOR NOT CONFIRMING ALL INFORMATION ON THE DRAWINGS PRIOR TO FABRICATION ARDOR INSTALLATION. 2.PROJECI RECORD DOCUMENTS- MAINTAIN AT THE JOBSITE ONE COPY OF ALL CONTRACT DOCUMENTS CLEARLY MARKEDAS "PROECT RECORD COPY°. THESE DRAWINGS ARE TO BE MAINTAINED IN GOOD CONDITION, UPDATED DAILY FOR CHANGES ENCOUNTERED AND AVAILABLE AT ALL TIMES FOR INSPECTION BY THE OWNER DO NOT USE FOR FIELD CONSTRUCTIONI PROJECT RECORD DOCUMENTS ARE TO BE KEPT CURRENT WITH EXACT DIMENSIONS OF ALL WORK, EQUIPMENT, PIPING, VALVES, DUCTWORK, ETC. MARK ALL INFORMATION IN RED LINES AND NOTES SO AS TO BE EASILY IDENTIFIED FROM THE BASE DRAWING. UPON COMPLETION OF THE WORK, ONE SET OF THESE DOCUMENTS SHALL BE TURNED OVER TO THE OWNER AS ONE QUALIFICATION FOR FINAL PAYMENT. 3.AFTER THE BALANCING AND ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER THREE COMPLETE SETS OF AS -BUILT DOCUMENTATION SHALL BE PROVIDED. IT SHALL INCLUDE, BUT NOT BE LIMITED TO ACCURATE PLAN DRAWINGS, SYSTEM AND CONTROL SCHEMATICS, SEQUENCE OF OPERATION, WIRING DIAGRAMS AND OPERATION AND MAINTENANCE MANUALS. II. INSULATION Ol la:0 1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. 2.CIE IN AND DRY SURFACES PRIOR TO INSULATING. 3.EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, HANGERS AND SIMILAR PENETRATIONS. 4ANSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. S.IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. SEAL ALL PENETRATIONS OF THE VAPOR BARRIER BY STAPLES, HANGERS OR WHERE OTHERWISE DAMAGED. SMAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. 7ANSULATION SHALL BE BY OWENS-CORNING KNA.UF, OR MANVILLE. B. HVAC DUCTWORK 1. INTERNALLY INSULATE WITH 1 INCH THICK, 1-112# DENSITY ACOUSTICAL INSULATION (AIR SIDE BLACK COATED TO MEET NFPA) ALL DUCTWORK NOTED AS REQUIRING SUCH. INTERNAL INSULATION SHALL BE INSTALLED PER THE REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S RECOMMENDATIONS. DUCTSIZES NOTED ON DRAWING ARE SHEET METAL DIMENSIONS. 2.ALL SUPPLY AND OUTSIDE MR DUCTWORK SHALL BE WRAPPED WITH 1-1121NCH OF 0.75 LBICU.FT. FIBERGLASS, FOIL BACKED DUCT WRAPPING. 3.ALL KITCHEN HOOD EXHAUST DUCTWORK SHALL BE INSULATED WITH ETS FLAME SHIELD FIRE STOP BLANKET OR 3M FIRE BARRIER BLANKET. H. HVAC A GENERAL 1. THE PROJECT CONSISTS OF COMPETE HVAC SYSTEM AND GREASE EXHAUST SYSTEM. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, ETC. MUST BE FIELD VERIFIED FOR EXACT LOCATION. B. PIPING 1. MATCH EXISTING MATERIAL WHERE MODIFICATIONS ARE BEING MADE TOM EXISTING SYSTEM. IF MATERIAL DIFFERS FROM THAT SPECIFIED HEREIN, IT SHALL BE SPECIFIED IN THE BID PROPOSAL 2.OUTDOOR CONDENSATE PIPING SHALL BE TYPE "C COPPER CONDENSATE DRAIN FOR THE ROOFTOP MOUNTED AIR CONDITIONING UNIT, INSTALLED PER THE MANUFACTURERSREQUIREMENTSGND ILL TAILS. DRAIN SHALL DISCHARGE INTO ROOF DRAIN. C. DUCTWORK ANDAIR DISTRIBUTION 1.DUCTWORK ROUND OR RECTANGULAR OR SPIRAL SHALL BE OF GALVANIZED STEEL CONSTRUCTION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA'HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE MANUAL AND THE FOLLOWING PRESSURE I SEAL SCHEDULE: a. SUPPLY AIR DUCTWORK - Y W.G. POSITIVE PRESSURE, SEAL CLASS B. b. RETURN DUCTWORK -2" W.G. NEGATIVE PRESSURE, SEAL CLASS B. c. EXHAUST DUCTWORK -7 W.G. NEGATVE PRESSURE, SEALCLASS A 2.ROUND DUCT ELBOWS SHALL BE LONG SWEEP, 1-112 TIMES THE CENTERLINE RADIUS UNLESS CLEARANCE IS NOT AVAILABLE AT WHICH TIME MITERED ELBOWS WITH TURNING VANES SHALL BE UTILIZED. 3.RECTANGULAR ELBOWS SHALL BE FURNISHED WITH DOUBLE THICKNESS TURNING VANES. TURNING VANES SHALL BE FASTENED WITH A DOUBLE ROW OF SCREWS. 4.FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF RTU'S AND CENTRIFUGAL FANS. INSTALL FLEXIBLE CONNECTIONS WITH 7 WIDE DOUBLE NEOPRENE COATED FLAME RETARDANT, NFPA90AAPPROVED, FIBERGLASS FLEXIBLE CONNECTION. FLEXIBLE CONNECTION TO HAVE A MINIMUM OF 24 GAGE, 3" WIDE SHEET METAL COLLARS PERMANENTLY ATTACHED TO EACH SIDE. $.MITERED OFFSETS GREATER THAN 30 DEGREES IN EITHER DIRECTION SHALL NOT BE PERMITTED. 6.CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF I5DEGREES. TRECTANGULAR BALANCING DAMPERS - RUSKIN MD25 SHALL BE SINGLE BLADE UP TO 6" IN HEIGHT AND WIN WIDTH, AND RUSKIN MD35 MULTI -BLADE FOR LARGER SIZES. ALL ROUND BALANCING DAMPERS SHALL BE COMMERCIAL GRADE SINGLE BLADE UP TO 16' IN DIAMETER SHALL INCORPORATE LOCKING TYPE INDICATING ADJUSTMENT. BALANCING DAMPERS SHALL BE INSTALLED IN ALL BRANCH DUCTS OFF MAIN AND ON ALL TAPS OFF DUCTS TO DIFFUSERS UNLESS OTHERWISE NOTED ON DRAWINGS. SFINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE AIR DUCTWORK BUT ITS USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL RUNS. ALLCHANGES OF DIRECTION IN A DUCT SYSTEM (GALVANIZED OR FLEXIBLE) SHALL BE MADE WITH AN APPROPRIATEGALVANIZEDELBOW. MAXIMUM LENGTH OF ANY FLEXIBLE AIR DUCT IS 5'-0". RFLEXIBLE AIR DUCTS TO DIFFUSERS SHALL BE ATCO RUBBER PRODUCTS INC. MODEL UPC#070 INSULATEDR=4.2 ILL. 181 RATED AND CLASS I AIR CONNECTOR. MAXIMUM LENGTH OF FLEXIBLE AIR DUCT TO DIFFUSER TO BE 5'-0". 10. FLEXIBLE CONNECTOR DUCTS AT THE INLETS OF THE NEW VAV BOXES SHALL BE ATCO RUBBER PRODUCTS, INC. MODEL UPC #05Q UN -INSULATED, U.L 181 RATED AND CLASS 1 AIR CONNECTOR. MAXIMUM LENGTH OF FLEXIBLE DUCT AT BOX INLET TO BE 341'. 11. PROVIDE 3"X3"Xll4'ANGLE FRAMING AROUND THE ROOF OPENINGS FOR THE SUPPLY AND RE TURN AIR DUCTWORK. 12. SUPPORT ALL SHEET METAL AND EQUIPMENT FROM ANGLE IRON CONNECTED TO STRUCTURALSTEEL DO NOT SUSPEND DUCE OR EQUIPMENT FROM METAL DECK OR JOIST BRIDGING. 13. GRAVITY BACKDRAFT DAMPERS a. SEE SCHEDULE ON DRAWINGS 14. CONTROL DAMPERS a. SEE SCHEDULE ON DRAWINGS 15. GRILLES, REGISTERS AND DIFFUSERS a. SEE SCHEDULE ON DRAWINGS D. KITCHEN SYSTEMS 1. THE ENTIRE KITCHEN HOOD INSTALLATION SHALL COMPLY WITH ALL REQUIREMENTS WITHIN THE LOCAL STATE BUILDING MECHANICAL COMM AS MODIFIED BY LOCAL CODES. a. ALL KITCHEN HOOD EXHAUST DUCTWORK SHALL BE WELDED 16 GAUGE STEEL DUCT WITH LIQUID TIGHT JOINTS. to SLOPE ALL DUCTWORK BACK TO THE HOOD. c. PROVIDE ACCESS DOORS INSIDE OF DUCTS AT EACH CHANGE OF DIRECTION AND AT 20 FOOT INTERVALS FOR INSPECTION AND CLEANING all SUPPORT DUCT PER CODE AND SMACNA 23HIS CONTRACTOR SHALL COORDINATE WITH THE FIRE SUPPRESSION SYSTEM SUPPLIER THE ELECTRICAL CONTRACTOR AND THE ARCHITECT TO PROVIDE COMPLETE OPERATION AND CONTROL SYSTEM. UPON ATTEATION OF THE FIRE SUPPRESSION SYSTEM, EXHAUST AND SUPPLY FAN OPERATION SHALL BE PER THE REQUIREMENTS OF THE LOCAL CODE AUTHORITY. PROVIDE ALL LABOR AND MATERIAL TO INSTALL THE REMOTE CONTROL PANEL IN THE LOCATION SHOWN ON THE DRAWINGS. INSTALLATION SHALL CONFORM TO THE ELECTRICAL SPECIFICATIONS. 3.KITCHEN EXHAUST HOOD - a. SCHEDULED ON THE DRAWINGS WITH ALL STANDARD FEATURES AND THE FOLLOWING OPTIONS; U.L. CLASSIFICATION AND U.L. LISTED VAPORPROOF INCANDESCENT LIGHTS. THIS HOOD IS U.L. CLASSIFIED AND HAS BEEN LABELED AND TESTED IN ACCORDANCE WITH ILL. 710. IV. HVAC EQUIPMENT A GENERAL 1. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION INFORMATION AND INSTRUCTIONS, REQUIREMENTS AND ANY ADDITIONAL GUIDELINES. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL REQUIRED ACCESSORIES REQUIRED TO COMPLETE THE INS FALLATIONS. 2.11VAC EQUIPMENT SHALL BE'STARTED UP' BY FACTORY TRAINED AND AUTHORIZED SERVICETECHNICIAN. 3.ALL FACTORY STARTUP FORMS SHALL BE COMPLETED AND TURNED OVER TO THE OWNER WITH ALL COMPLETED WARRANTY CARDS PRIOR TO FINAL APPROVAL B. PACKAGE ROOFTOP HEATINGANDAIR-CONDITIONING UNITS 1. SEE DRAWING FOR INi UNIT PERFORMANCE REQUIREMENTS. 2.UNIT SHALL BE OF ONE-PIECE PACKAGED CONSTRUCTION COMPLETELY ASSEMBLED, WIRED AND FACTORY TESTED. 3.WIRING SHALL COMPLY WITH LATEST EDITION OF THE NEC AND SHALL INCORPORATE 3-LEG OVERLOAD PROTECTION FOR THE COMPRESSOR($) 4.UNIT SHALL BE COMPLETE WITH PRESSURE SAFETY CONTROLS, ANTI -SHORT CYCLE PROTECTION AND CONTROLS (WHEN SPECIFICALLY NOTED ON THE DRAWINGS). C. FANS 1.CEILINGFANS a. SEE DRAWING FOR INi UNIT PERFORMANCE. 2.KITCHEN FANS a. SEE DRAWING FOR INDIVIDUAL UNIT PERFORMANCE. b. PROVIDED BY OTHERS INSTALLED BY MC. V. CONTROLS A CONTROL WIRING SHALL BE PLENUM RATED CABLE WITH COLOR CODED 18 AWG WIRES(MINIMUML B. CONTRACTOR SHALL PROVIDE ALL WIRING BETWEEN THERMOSTAT AND EQUIPMENT (AIR HANDLER, ROOFTOP UNIT, CONDENSING UNIT, ETC.). C. LOCAL CONTROL PANELS SHALL BE PROVIDED FOR ALL RELAYS, TRANSDUCERS, AND OTHER FIELD INTERFACE DEVICES. 1. PANELS SHALL BE NEW TYPE SUITABLE FOR EACH APPLICATION. 2.ALL WIRING IN PANEL SHALL BE ROUTED IN WIRING TRAYS. 3.PROVIDE FINAL AS -BUILT CONTROL DRAWING MOUNTED INSIDE THE PANEL. 4.CONTRACTOR SHALL PROVIDE ALL WIRING ANDOR TUBING BETWEEN CONTROL PANEL(S) AND REMOTE CONTROL DEVICES. D. THERMOSTATS 1. FURNISH AND INSTALLA HONEYWELL 7 DAY PROGRAMMABLE HEATINGICOOLING THERMOSTAT AND CLEAR LOCKABLE COVER WITH APPROPRIATE CONTROL WIRING BETWEEN THERMOSTAT, SENSORS AND ROOFTOP UNITAS REQUIRED TO PROVIDE A COMPLETE OPERATING SYSTEM. WIRING SHALL BE MINIMUM 18 AWG. 2.THERMGSTATS SHALL BE MOUNTED WHERE INDICATED ON THE DOCUMENTS. 3.CONTRACTOR SHALL PROGRAM THERMOSTAT PER THE OWNER'S REQUIREMENTS AND TRAIN OWNER'S PERSONNEL IN THE OPERATION AND PROGRAMMING OF THE THERMOSTAT AND SYSTEM. E. TEMPERATURE SENSORS 1. FURNISH AND INSTALL THE TEMPERATURE SENSORS WITH APPROPRIATE CONTROL WIRING BETWEEN THERMOSTAT, SENSORS AND ROOFTOP UNIT AS REQUIRED TO PROVIDEACOMPLETEOPERATING SYSTEM. WIRING SHALL BE MINIMUM I8AWG. 2.TEMPERATURE SENSORS SHALL DOCUMENTS. 3.TRAINING ON THE OPERATION AND MAINTENANCE OF THE SYSTEM SHALL BE PROVIDED USING THE MANUALS SUBMIT EDAS A REFERENCE. AN OUTLINE OF THE TRAINING SESSION SHALL BE SUBMITTED AND APPROVED BY THE OWNER PRIOR TO SCHEDULING ACTUAL TRAINING SESSION. TRAINING SHALL CONSIST OF (3)THREE FOUR HOUR SESSIONS. THE LAST SESSION SHALL INCLUDE ALL OWNER REQUESTED ITEMS OF CLARIFICATION. AT LEAST 10 WORKING DAYS NOTICE SHALL BE GIVEN AND CONFIRMATION OF THE DATE AND TIME RECEIVED. Mi. TESTINGANDBALANCING A TESTING AND BALANCING SHALL NOT BEGIN UNTIL THE SYSTEM HAS BEEN COMPLETED, IS IN FULL WORKING ORDER AND ALL EQUIPMENT START-UP HAS BEEN COMPLETED. ALL HIM SYSTEMS AND EQUIPMENT SHALL BE PUT INTO FULL OPERATION AND THE OPERATION OF SAME CONTINUED DURING EACH WORKING DAY OF THE TESTING AND BALANCING. B. AN INDEPENDENT "AABC"OR"NEBB" CERTIFIED AIR AND WATER BALANCE CONTRACTOR SHALL TEST AND BALANCE THE SYSTEM AND REPORT RESULTS TO THE ENGINEER AND THE OWNER. 1. ALL WORK SHALL BE DONE UNDER DIRECT SUPERVISION OF THE CERTIFIED BALANCING ENGINEER AND BY QUALIFIED BALANCING TECHNICIANS. 2.METHODS AND FORMS SHALL BE IN ACCORDANCE WITH THE CERTIFICATION AGENCIES RECOMMENDATIONS AND REQUIREMENTS. 3.COMPLY WITH ASHRAE RECOMMENDATIONS PERTAINING TO MEASUREMENTS, INSTRUMENTS, TESTING ADJUSTING AND BALANCING. 4.ALL QUANTITIES SHALL BE WITHIN 10%OF THE DESIGN VALUES. S.CONTRACTOR SHALL PROVIDE ANY SHEAVE CHANGES REQUIRED ON THE HVAC UNIT. C. PERFORMANCETEST 1. AFTER ALL HVAC EQUIPMENT IS INSTALLED, TESTED AND BALANCED AS SPECIFIED HEREIN THEY SHALL BE OPERATED AND PLACED UNDER SURVEILLANCE FORA PERIOD OF AT LEAST ONE (1) DAY, THIS MAY INCLUDE THE DAY OF STARTUP, TO VERIFY THAT ALL EQUIPMENT IS PRODUCING THE REQUIRED CAPACITY. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR THE OPERATION OF THE EQUIPMENT 2TEST SHALL BE PERFORMED WITH ALL CONTROLS IN THE AUTOMATIC POSITION AND BUILDING LIGHTS, DAMPERS, ETC. POSITIONED TO SIMULATE NORMAL OPERATION OF THE HVAC SYSTEM. 3.DURING THE LEST, CONTROL SETTINGS MAY REQUIRE ADDITIONAL ADJUSTMENTS TO PRODUCE THE BEST BALANCED SYSTEM OPERATION. THEIR FINAL SETTING OF EACH OPERATING AND SAFETY CONTROL SHALL BE RECORDED, THEY SHALL INCLUDE, BUT NOT LIMITED TO, THERMOSTATS, LIMIT CONTROLS, AND OTHER SIMILAR ITEMS. 4.SHOULD COMPLETION OF THE INSTALLATION OCCUR AT SUCH TIME THAT THE REQUIRED PERFORMANCE TEST MUST BE CONDUCTED DURING ASEASON WHEN THE FULL OPERATION OF EITHER THE HEATING OR COOLING SYSTEM CAN NOT BE CHECKED, THE CONTRACTOR SHALL PERFORM THE TEST AND RECORD ALL SUCH DATA AS IS AVAILABLE WITH SYSTEM OPERATING AUTOMATICALLY UNDER THE PREVAILINGWEATHERCONDITIONS. THATPARTOFTHESYSTEMWHICHCANNOTBE TESTED SHALL BE DELAYED UNTIL THE WEATHER IS APPROPRIATE, AT WHICH TIME THE REMAINING PART OF THE REQUIRED TESTS SHALL BE CONDUCTED AND DATA RECORDED ACCORDINGLY. D. ACCEPTANCE AND CHECK -OUT -CONTRACTOR SHALL PROVIDE QUALIFIED PERSONNEL, AT NO ADDITIONAL COS[ TO THE OWNER AS MAYBE REQUIRED BY THE ENGINEER FOR THE PURPOSE OF VERIFYING PROPER OPERATION AND INSTALLATION OF THEIR WORK AT THE TIME OF REQUEST FOR ACCEPTANCE. Vill. LABELING A. SUMMARY 1, SECTION INCLUDES NAMEPLATES, TAGS, STENCILS AND PIPE MARKERS. B. REFERENCES 1, ASME A13.1 (AMERICAN SOCIETY OF MECHANICAL ENGINEERS)- SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS. C. NAMEPLATES 1, PROW CT DESCRIPTION: LAMINATED THREE -LAYER PLASTIC WITH ENGRAVED BLACK LETTERS ON LIGHT CONTRASTING BACKGROUND COLOR. D. STENCILS 1.STENCILS: WITH CLEAN CUT SYMBOLS AND LETTERS OF FOLLOWING SIZE: a. DUCTWORK 1-314INCHES HIGH LETTERS. 2.STENCIL PAINT: SEMIGLOSS ENAMEL, COLORS AND LET ERING SIZE CONFORMING TO ASMEA13.1. E. LABELS 1OESCRIPTION: POLYESTER OR LAMINATED MYLAR SIZE 1.9 X 0.75 INCHES, ADHESIVE BACKED WITH PRINTED IDENTIFICATION. F. PREPARATION 1.DEGREASE AND CLEAN SURFACES TO RECEIVE ADHESIVE FOR IDENTIFICATION MATERIALS. G. INSTALLATION 1. INSTALL IDENTIFYING DEVICES AFTER COMPLETION OF COVERINGS AND PAINTING. 2.INSTALL PLASTIC NAMEPLATES WITH CORROSIVE -RESISTANT MECHANICAL FASTENERS, OR ADHESIVE. 3.I1 LABELS WITH SUFFICIENT ADHESIVE TO ENSURE PERMANENTADHESION AND SEALWITHCLEARLACOUER. FOR UNFINISHED CANVAS COVERING, APPLY PAINT PRIMER BEFORE APPLYING LABELS. 4ANSTALL TAGS USING CORROSION RESISTANT CHAIN. NUMBER TAGS CONSECUTIVELY BY LOCATION. EIDENTIFY EQUIPMENT WITH PLASTIC NAMEPLATES. STAG AUTOMATIC CONTROLS, INSTRUMENTS, AND RELAYS. KEY TO CONTROL SCHEMATIC. CURRAN ARCHITECTURE 5719 LAWTON LOOP E. DR. #212 INDIANAPOLIS, IN 46216 O :: 317.288. 0681 F :: 317.288.0753 DRAWN BY: STK CHECHED SY: KDH *T/E/S ENGINEERING 25760 First Street Cleveland, OH 44145 P 440 8712410 F 440 8717954 tesengineedng.com B/1/19 THIS DRAWING AND THE IDEAS. DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOM OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCH TECTURE. © covr T2019.OsvvNArewnECNR£ CH7I_IVIIIII714y211411 11 10460 N MICHIGAN RD CARMEL, IN 46032 MECHANICAL SPECIFICATIONS PROJECT NUMBER: 190197 M3.0