Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Mechanical M4.0
COMcheck Software Version 4.1.1.0 Mechanical CompllancsStaterrent COMcheck Software Version 4.1.1.0 f Mechanical Compliance Certificate Compliance Statement The proposed mechanical alteration Project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permitapplication. The proposed mechanical systems have been Inspection Checklist Z designed to meet the 90.1 (2010) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Energy Code: 90.1 (2010) Standard Requirements: 100.0%were addressed directly in the COMcheck software am¢ -rose Signature Date PmJM Itdpme0on Text in the'Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each rangy Go le: 90.1 (2010) Standard requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception Project Time: Kalache Factory is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Losodon: Carmel, Indiana Seceon Climate Zayre: 5a PWn Review CAmpllesi COmments/AssumpRerrs Project Type: Alteration 6Rw Ip 4.2.2.6.4. Plans, specifications. and/or Licar ies Requirement will be met. 4.2.1.5.7. calculations provide all Information Opines Not Construction Site: DImer/Agent: Oealgrreox:onnactor: 2 with which compliance can be []Not Observable IPR2)1 determined for the mechanical 10460 Rd TIES Engineering systems []NotA Applicable tans PP Carmel, IN Carmel, IN46032 25760 St where document where exceptions to the Westlake, OH 44146 standard standard are Claimed Load calculations per acceptable engineering standards and Mechanical Systems List handbooks. 0.2.2,8.4. Plans, specifications, and/or OComplies Requirement will be met Quantity System Type & Description1.1.8.4.1. calculations provide all information ❑Does Not 1 RTII 2.8.7 with which compliance can be []Not Observable. Heating:teach -General Furnace, Gas, Capacity=103 kBM1nr [PR61e determined for the electrical systems and equipment and document where Elect Applicable Proposed Efficiency Et, Rewired Efficiency: 80.00 is Et (or 18%AFUE) exceptions are claimed Feeder Goolim:1 each- Single Package DX Unit, Capacity = 72 kBYalo, Ar-Coolatl Condenser, Air Economizer connectors sizetl in accordance with Proposed Efficiency =12.00 EER. Required Efficiency 11.00 EER approved plans and branch circuits Fen Systixi FAN SYSTEM RTU-1— Compliance (Brake HP nreti+pol : Passes sized for maximum drop of 3%. Fans: 6.7.2.4 Detailed Instructions for HVAC OComplies Requirement will be met [PR511 systems commissioning included on []Does Not FAN 1 Supply, Constant Volume, 2400 CM. 2.0 minor nam¢p131e hp. 14 design poke M1p (14 maze BHP) Me plans or specifications for projects Rim. DNot Observable SYSTEM VERIFICATION>=50,000 REQUIRED. 'DNot AppllCabk hilditional Comments//LSSumption5: 1 RT1JH2 Hervill 1 cent - Central Furnace. Gas. Capacity =103 k61Wr Proposed Emciency=So Does Et. Returned EnmierwY: 88Do %Et (or 78%AFUE) Cooling: l each- Single Package DX Und. Capaciy = 74labor. ArCaoed Condenser, Air Economizer Proposed Em coxicy=12.00 EER, Required Efficiency. 1100 EER Fan System: FAN SYSTEM RTII-2— compliance (stake HP removal: Passes Fans: FAN 2 Supply. Consonant Volume. 2400 CFM. 2d minor examinee hp, 14 design times no (14 maze BHP) SYSTEM VERIFICATION REQUIRED. 1 MUAH Headrg: l soon - control Furnace, Gas. Capacity= In Meant Proposed Efficiency =W.00%Et. Returned Efficiency: 80.00 Is Et (or 78%AFUE) Fan System: FAN SYSTEM MUA-1 —Compliance (ank¢ HP method) : Passes Fans: FAN 3 Supply, consent Volume, lEW CRA, Is rtpbr examinees hp, 18 resign bake no C.8 max. BHP) SYSTEM VERIFICATION REQUIRED. 1 High Impact (Tier 1) 12 IMedium Impact mec 2) 13 1 Low Imp_d (Tier 3) Project Title: Kceche Factory I Resandate: 0672871g rroject Title: Kalache Factory Report date:06/28/19 rroject Title: Kalache Factory r Report data 05RIVI9 Data filename: GACurtan ArchitecturiAdoache Factory, Camel IN\EngineernegWechanical\CA KOIACHE Page 1& 11 Dess filename: G:\Curen Architecturelociache Factory, Carmel IN\EregineenngWischanical\CA KOIACHE Page 2or 11 Parafilename: G:\Curran AmhkeaurekKioache Factory,CamrelltAEnineedngXMmhanicaRCAKOt E Page 30 11 -FACTORY CARMEL IN - COMCHECKcck e ACTORY CARMEL IN-COMCHECK.cck FACTORY CARMEL IN - COMCHECKcck RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel �VT�1AtnMX\DMSL DATE: \ 10/31/19 CURRAN ARCHITECTURE 5719 LAWTON LOOP E. DR. #212 INDIANAPOLIS, IN 46216 O :: 317.288. 0681 F :: 317.288.0753 gWWN BY: STK CHECKED By: KOH *T/E/S ENGINEERING 25760 First Street Cleveland, OH 44145 P 440 8712410 F 440 8717954 tesengineeling.com 8/1/19 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE E(CLUNVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOM OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCH TECTURE. © COPyWO1T2019.C(seVNNR04T5OcR£ I:�i7I_[s771�yc[+ICa7l1 10460 N MICHIGAN RD CARMEL, IN 46032 MECHANICAL COMPLIANCE PROJECT NUMBER: 190197 M 4.0