HomeMy WebLinkAboutDepartment Report 11-07-19
4
Carmel Plan Commission
COMMERCIAL COMMITTEE
Thursday, November 7, 2019 Department Report
2. Docket No. 19080009 DP/ADLS: Schafer Powder Coating – Building Expansion
The applicant seeks site plan and design approval for a 31,500 sq. ft. building addition to the existing facility and
also proposes to add 34 new parking spaces. The site is 5.44 acres in size. It is located at 4518 W. 99th Street and
is Lots 4A & 5A of Block 3 of Mayflower Park commercial subdivision. It is zoned I-1 and is not within any
overlay zone. Filed by Mike Timko of Kimley-Horn on behalf of the owner, Schafer & Gehlhausen, LLC.
*Updates to the Dept. Report are written in blue
Project Overview:
The Petitioner proposes to construct an addition to an existing warehouse facility. All parcels surrounding this site are
zoned I-1/Industrial. The neighboring buildings are all also office/warehouse type buildings. This site is part of the
Mayflower Park Industrial Complex (Block 3, Lots 4A and 5A), established under Docket No. 05120015 TAC in 2005.
Please view the Petitioner’s informational packet for more detail.
Unified Development Ordinance (UDO) Standards this project MEETS:
I-1/Industrial:
• Permitted uses: Light Manufacturing
• Minimum Front Yard Setback: 15’, 58.7’ existing (west)
• Minimum side yard: 5’ required, 47.5’ (north) and 92.4’ (south) proposed
• Minimum rear yard: 15’ required, 72.6’ proposed (east)
• Maximum lot coverage: 90% allowed, 69% proposed
• Maximum Building Height: 60’ allowed, 31’ proposed
Article 5 – Development Standards:
• Lighting plan meets 0.3 footcandle maximum at property lines
• Bicycle parking: 4 spaces required and provided
• Pedestrian connectivity: Paved walkway from the road to front door required and provided
UDO Standards NOT MET, therefore adjustments or variance requests are needed:
• Vehicular parking: 159 spaces are required, 94 spaces proposed (1 space per 500 sq. ft. of floor area required)
Site Plan, Parking and Engineering:
Schafer Powder Coating currently operates out of the existing 48,000 sq. ft. facility. The proposal is to add a 31,500 sq. ft.
building to the east on the vacant land there today. The proposed site plan will add 34 parking spaces and a vehicular
connection between the two entrances and existing parking areas. 60 spaces exist on site today. Based on light
manufacturing uses, two spaces per every three employees (67), or one space per 500 sq. ft. of floor area, whichever is
greater, is required. The proposed overall building size is 79,500 sq. ft. and there are 65-70 employees total + 25 new
employees working over 3 shifts total. This means that 159 spaces are required. The site is short by 65 spaces. This
shortage will require a variance unless the Petitioner can secure a cross access easement for shared parking with a
nearby business. The two entrances, one at the north and one at the south, will remain. New parking will be installed on
the north side of the new building addition, and on the west side of the existing building. All yard setbacks and
requirements are met. The proposed plan meets lot coverage requirements with 69% proposed and up to 90% coverage
allowed.
Access to the site is from West 99th Street, which meets up with Michigan Road to the east. The City’s Thoroughfare Plan
calls for an extension of Mayflower Park Drive to the south, along the east property line. The extension of Mayflower
Park Drive is proposed to eventually connect to the north with Retail Parkway, with is accessed from Michigan Road. The
Petitioner was working on a plan that would instead of bringing Mayflower Park Drive to the north, they proposed a more
direct connection of West 99th Street and Retail Parkway by taking the road across their north property line. However,
after review of the proposal, we have decided it would be better if they contributed into the Non-reverting Thoroughfare
Fund instead.
5
Drainage for this site is planned to go into the existing dry detention pond at the southeast corner of the site. There is an
existing dry detention pond onsite that was sized to handle this building addition when it was installed. It will just get
some new seed mix and have maintenance done to it to make sure it is functioning properly.
Active Transportation:
The petitioner will be adding a new sidewalk along the south edge of the new parking spaces to allow people to walk into
the new building addition. Sidewalks exist around the rest of the building. A 10’ wide multi-use path is required along
West 99th Street; however, the petitioner would like to pay into the City’s Non-Reverting Thoroughfare Fund instead of
installing the path at this time. West 99th Street, along with Mayflower Park Drive to the south, does not have any
sidewalk or path currently. The Petitioner has stated they will provide a sidewalk connection from the front door of the
building to the street. Bike parking has been added to the southwest corner of the exiting building, adjacent to the new
covered employee break area with picnic tables.
Architectural Design:
The proposed building addition will be constructed of pre-cast concrete panels, which matches the existing building. They
will be painted with a mix of gray, blue, tan, brown and a medium tan/almond color. The existing building will also be
painted to match this new color scheme. The current color scheme is white/gray/blue/green. The new proposed pattern
will give the building a more modern look. The east elevation and north elevation will have windows near the roofline to
let in natural light. The roofline will have a pre-finished metal coping that will match the existing building.
Lighting:
Three new wall pack light fixtures are proposed. They will have LED lights and match existing fixtures on the building.
The lighting plan is in compliance with the maximum 0.3 footcandles at the property line.
Landscaping:
We have worked with the Petitioner to call out existing trees on the east property line, and to mark them as
saved/protected with tree preservation fencing. The site has existing plants and trees throughout. The Urban Forester is
waiting on a revised plan which shows what exists today and what has died/been removed since the original approval back
in 2006. This building addition project must have a landscaping plan that matches the original approved landscape plan
from 2006.
Signage:
A wall sign currently exists on the west face of the building and no new signage is proposed for this building addition.
October 15 Public Hearing meeting recap:
The Petitioner went over the project and discussed the accurate number of employees and the parking shortage per the
UDO requirements. They feel they will be adequately parked though. No one from the public spoke about the project.
Plan Commission members asked about the possibility of a PC waiver for parking spaces and if this was a private street.
The answers were it is a private street but unfortunately a waiver for the parking spaces is not allowed for this zone. No
other concerns or comments were mentioned. The project was sent to the Commercial Committee with the Committee
having final voting authority.
DOCS Remaining Comments/Concerns:
1. Parking count shortage – needs a variance or obtain a cross parking agreement with a neighboring site
2. Urban Forester approval needed
Recommendation:
The Dept. of Community Services recommends the Commercial Committee votes to Approve this item this evening,
subject to addressing the two outstanding comments mentioned above.