HomeMy WebLinkAboutClay Corner 40 TRICO10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 3174344-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913428
Permit Type Final Subdivision Clay Comer
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
2017-1335 Section Number
Clay Corner Lot Number
Address Number
19 Village of Westclay Station
Address 2
M IX
Street
0.15
City
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
310 Zip Code
County
0.00
Builder
0.00
150.00
Phone Number
1908.00
Owner
0.00
Phone Number
0.00
2058.00
Occupant
Phone Number
40
1555
Jensen Drive
Carmel
46032
Hamilton
Lennar
317-659-3230
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID: CC110-CC103
Grease Trap Slab Foundation YES
Grease Interceptor Crawl Space
Manhole IDs USMH CC-110 CC-103 DSMH
Grit Interceptor Basement Lid Elevation 887.46 ✓ 885.03
Grinder Station First Floor Elevation 890.17✓ 890.17 ✓
Water Service City of Carmel Basement Elevation
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor 2.71 5.14 Ft.
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Not Applicable
Z�TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached ili Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer structure.
le terms of the conditional permit, if any, are listed below.
Plans have been submitted.
All fees have been paid.
No certificate of insurance required.
No additional permits required. b
No manhole core permit required.
a �
The facility is not classified as a FOG facility.
By signing below, I attest that I am
Builder / Owner Signature
Printed Name
Approved By
Ryan
Permit is valid
(Notes)
agree to accept responsibility for all work done under this permit.
Phone Numberq� 4j
from the date issued. Permit valid only with TriCo seal in red ink.
09/26/2019