Loading...
HomeMy WebLinkAboutTriCo Sanitary Sewer Permit - 10-01-201910701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco Residential SANITARY SEWER PERMIT 999913436 Permit Type Final Subdivision Nathaniel Creek Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage ENG3132014 Nathaniel Creek Jay Gaddy 14 Austin Oaks Station CTRWD WWTP 3.00 Section Number Lot Number Address Number Address 2 Street City EDU in Gallons 310 Zip Code County Local Sewer Charge - District Contribution 0.00 guilder Plan Review and Inspection 0.00 Application Fee 150.00 Phone Number EDU Fee 1908000 Owner Interceptor Fee 12225000 phone Number Other Fees 0.00 Fees Due 1428100 Occupant Invoice Number Phone Number 4545 W141stSt Carmel 46032 Hamilton PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) c2flu any conditions noted below. All Installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TrICO's sanitary sewer system. TriCo will assume no (lability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Grease Trap Grease Interceptor Grit Interceptor Grinder Station YES Slab Foundation Crawl Space Basement Main ID: YES �Manhole IDs USMH Lid Elevation First Floor Elevation Water Service City of Carmel Basement Elevation Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: f NAT1-WLC919 WLC-919 .05 DSMH 882 OroO-882r05 Ft■ Low Pressure System TriCo currently requires that an I&I inspection is performed and a Certificate of Complian/ sale of a properrty. Please review attached 1/I Permit. ce is issued prior to occupancy � nholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. I he proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure terms of the conditional permit, if any, are listed below. Plans have been submitted. HII tees have been paid. No certificate of insurance required. K�coRDED AGREEMENT No manhole core permit required. I he facility is not classified as a FOG facility. (Notes) By signing below, I attest that I am familiar with the Distri 's specifications and agree to accept responsibility for all work done under this ermit. P Builder /Owner Signature � �, �' Phone Number ��� f �-- Printed Nam A G�oN' L SE FR Approved Bloft from Permit is valid YEAR T t� �/ ��20®I m the date issued. Permit valid only with TriCo s. I re m N W � O O� V 2 NE - H AM tnpineer