HomeMy WebLinkAboutTriCo Sanitary Sewer Permit - 10-01-201910701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913436
Permit Type Final Subdivision Nathaniel Creek
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
ENG3132014
Nathaniel Creek
Jay Gaddy
14 Austin Oaks Station
CTRWD WWTP
3.00
Section Number
Lot Number
Address Number
Address 2
Street
City
EDU in Gallons 310 Zip Code
County
Local Sewer Charge - District Contribution 0.00 guilder
Plan Review and Inspection 0.00
Application Fee 150.00 Phone Number
EDU Fee 1908000 Owner
Interceptor Fee 12225000 phone Number
Other Fees 0.00
Fees Due 1428100 Occupant
Invoice Number Phone Number
4545
W141stSt
Carmel
46032
Hamilton
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) c2flu any conditions noted below. All Installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TrICO's sanitary sewer system. TriCo will assume no
(lability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Grease Trap
Grease Interceptor
Grit Interceptor
Grinder Station
YES
Slab Foundation
Crawl Space
Basement
Main ID:
YES �Manhole IDs USMH
Lid Elevation
First Floor Elevation
Water Service City of Carmel Basement Elevation
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
f
NAT1-WLC919
WLC-919
.05
DSMH
882
OroO-882r05 Ft■
Low Pressure System
TriCo currently requires that an I&I inspection is performed and a Certificate of Complian/
sale of a properrty. Please review attached 1/I Permit.
ce is issued prior to occupancy
� nholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
I he proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure
terms of the conditional permit, if any, are listed below.
Plans have been submitted.
HII tees have been paid.
No certificate of insurance required.
K�coRDED AGREEMENT
No manhole core permit required.
I he facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am familiar with the Distri 's specifications and agree to accept responsibility for all work done under this ermit.
P
Builder /Owner Signature � �, �'
Phone Number ��� f �--
Printed Nam A G�oN' L SE FR
Approved Bloft
from
Permit is valid
YEAR
T t� �/
��20®I
m the date issued. Permit valid only with TriCo s. I re m N
W
� O
O� V
2
NE - H AM
tnpineer