Loading...
HomeMy WebLinkAboutC301If RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel rl �Lnn` dxwu9naA�L DATE: 11 /13/19 6o1 S70M1 M.H. 1C. = 840.22 JB' RCP E. INV. = 83587 18' RCP S. INV. = 836.47 18• RCP 5HP INV. = 81 LE 701`"l�j Indiana svii WA : 0- 0 0 30' 60' SCAIE 1' = 30' �I�II��I�1N11�� Hatch Pattern denotes Permanent Lawn Seeding. See Sheet C803 for seed mix. Hatch Pattern denotes Temporary i Lawn Seeding. See Sheet C804 for seed mix. Hatch Pattern denotes Low Stature Native Prairie Seed. See Sheet C803 for seed mix. Pattern denotes Native Prairie Seed. FAHatch See Sheet C804 for seed mix. Pattern denotes Pond Edge RNHatch and Swale Seed Mix. See Sheet C804 for seed mix. Hatch Pattern denotes North 71 American Green S75BN or Approved Equal. See Sheet C803. Existing Storm Sewer • New Storm Sewer Existing Sanitary Sewer t New Sanitary Sewer —xxx Existing Contour �— xxx Proposed Contour ® Paved Area Inlet Protection. See Sheet C803. Beehive Inlet Protection. ® See Sheet C803. —N--X it Sit Fence. See Sheet C803. - - ------= Snow Fence Protection. See Sheet C803. SITE SPECIFIC CONSTRUCTION SEQUENCE FOR CONSTRUCTION PHASE 1. Repair or replace silt fence installed during mass earthwork phase. 2. Install a repair concrete washout basin as indicated on plans. 3. Install slam sewer system and protect all inlets as indicated on Sheet C301. 4. Complete and/or repair earthwork and sub —grade compaction for pavement sub—grodes and install pavement sub —base material. 5. Install all remaining site features. 6. Complete earthwork and finish grading for seeded areas. Apply seed and mulch within 30 hours of seedbed preparation. 7. Stabilization of a project site is considered achieved when all land disturbing activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (70%) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 8. The contractor shall maintain erosion control measures and devices during construction and until siltation of the streets will not longer occur. 9. After contractor has removed temporary erosion control measures any disturbed areas shall be re —seeded as required. POST CONSTRUCTION ACTIVITIES The purpose of the post construction phase is to identify and maintain all post construction Best Management Structures (BMP's) thus reducing runoff and controlling pollutants. For this reason, the following sequencing should be followed as much as possible. 1. Distribute Post Construction BMP Operations and Maintenance Manual to the BMP Owner. 2. Identify and locate the following BMP structures for the owns: Vegetated Fiber Strip Vegetative Swale Extended Dry Detention Basin 3. After completion of construction, BMP owners must routinely inspect BMP's to verify that all BMP components are functioning as designed and are not in danger of falling. All BMP's need maintenance to function as water quality and quantity enhancements. Maintenance can range from mowing grass to removing collected sediment out of the treatment area. BMP owner is responsible fa the maintenance of the BMP and any costs associated with maintaining the BMP. 1. BMP Owner shall keep the BMP free from litter, woody growth, and shall mow the Vegetated Filter Strip when needed, but average grass blade height In Fller Strip shall not exceed six (6) inches. Refer to the inspection and maintenance guidelines for further clarification. 2. Sediment that collects in the BMP shall be removed when it adversely affects the ability of the BMP to perform as a water quality control device. This occurs when sediment causes runoff to concentrate within the filterstrip and a nice even lawn can not be maintained. No. - LA20700037 STATE OF DAZE 04.162019 THIS TRANI AND TPE IDEAS, DESIGNS AND CONCEPT$ CONTAINED HEREIN ARE THE ExaNLVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION. AND ARE NOT TO BE USED OR REPROWCED, IN WHOLE OR IN PART. WITHWT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP.(2014) f0b Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www. sch n eidercorp. cam Civil Engineering GIS ' LIS Land Surveying Landscape Architecture 46 E> I� Q w z o E� cou Cal 'aMDo V RE c w Z o i° a,c o ua m W W c' Ii a � W d N uR a /1J it w0 Co U � zCA E� w U n DATEPROJECT NO 03 08 19 2722.017 DRAM BY CHECKED BY I MIRK SHEET TITLE. S70RMWATER POLLUTION PREVENTION PLAN DR40NC RIFT nIENAME � �rryman MR. = i SHEET No.: C3®n N.a sME No