Loading...
HomeMy WebLinkAboutA-3.02 ElevationsLEVEL 01 100' - 0" T.O.S. @ HIGH ROOF 125' - 0" T.O.S. @ LOW ROOF 116' - 1" MAX. BLDG. HEIGHT 131' - 3" MR-1 GL-1 CS-1 SF-1 CP-1 LEVEL 01 100' - 0" T.O.S. @ HIGH ROOF 125' - 0" T.O.S. @ LOW ROOF 116' - 1" MAX. BLDG. HEIGHT 131' - 3" MR-1 CS-1 GL-1 SF-1 SS-2 EXTERIOR FINISH SCHEDULE MR-1 MR-2 DESC.: MANUF.: STYLE.: FINISH: DESC.: MANUF.: STYLE.: FINISH: CS-1 DESC.: MANUF.: STYLE.: FINISH: MP-1 DESC.: MANUF.: STYLE.: FINISH: ACM-1 DESC.: MANUF.: STYLE.: FINISH: CP-1 DESC.: MANUF.: STYLE.: FINISH: SS-1 DESC.: MANUF.: STYLE.: FINISH: SS-2 DESC.: MANUF.: STYLE.: FINISH: *VERIFY ALL FINISHES WITH FINISH SCHEDULE SF-1 DESC.: MANUF.: STYLE.: FINISH: GL-1 DESC.: MANUF.: STYLE.: FINISH: BRICK ACME BRICK VELOUR TEXTURE, MODULAR SIZE AMARETTO, BLEND TUP020, ITEM 103384 STONE VENEER TEXASTONE QUARRIES HADRIAN LIMESTONE HONED FINISH CAST STONE HEADER/COPING READINGROCK ROCKCAST SMOOTH; RIESLING EXTERIOR SCREEN WALL MORIN MATRIX 1.0 FINISH TO MATCH SF-1 ALUMINUM COMPOSITE MATERIAL ALUCOBOND, DUROPON 4MM RAINSCREEN FINISH TO MATCH SF-1, COLORWELD 500 COPING AT BRICK PARAPET ARCHITECTURAL PRODUCTS COMPANY AP SNAP-TIGHT COPING FINISH TO MATCH SF-1 LOUVERED SUN SHADE AT LOBBY KAWNEER NORTH AMERICA VERSOLEIL SUNSHADE -OUTRIGGER SYSTEM -6" @ 30° ANGLE FINISH TO MATCH SF-1 SOLID CANOPY AVADEK THIN PROFILE FINISH TO MATCH SF-1 STOREFRONT KAWNEER NORTH AMERICA TRIFAB 451T; 2" SIGHTLINE, 4 1/2" DEEP COLONIAL WHITE, ARCHITECTURAL CLASS 1 CLEAR GLAZING GUARDIAN GLASS VISION GLAZING -1" INSULATING GLASS UNIT SUNGUARD SN 68 03/A - 3.02 08/A - 3.02 06/A - 3.0207/A - 3.0209/A - 3.02 EMERGENCY GENERATOR DUMPSTER DUMPSTER 17' - 0"METAL DOORS; PAINT TO MATCH BRICK COLOR METAL BOLLARDS; PAINT TO MATCH BRICK COLOR (TYP.)18' - 10 1/2"34' - 1" 11' - 4 1/2" 05 A - 3.02 CP-1 MR-1 10' - 0"METAL DOORS; PAINT TO MATCH BRICK COLOR CP-1 MR-1 CP-1 MR-1 METAL BOLLARDS; PAINT TO MATCH BRICK COLOR CP-1 MR-1 LEVEL 01 100' - 0"10'-0"PREFABRICATED METAL COPING; REF. CP-1 ON FINISH SCHEDULE BRICK VENEER; REF. MR-1 ON FINISH SCHEDULE CMU; INTERIOR ENCLOSURE FACE PAINTED TO MATCH BRICK COLOR REHABILITATION INSTITUTE ELEVATIONS A - 3.023/32" = 1'-0" 02 EAST COURTYARD ELEVATION 3/32" = 1'-0" 01 WEST COURTYARD ELEVATION 1/8" = 1'-0" 04 ENLARGED SITE PLAN 1/4" = 1'-0" 07 DUMPSTER ENCLOSURE - WEST 1/4" = 1'-0"06 DUMPSTER ENCLOSURE - EAST 1/4" = 1'-0" 09 DUMPSTER ENCLOSURE - NORTH 1/4" = 1'-0" 08 DUMPSTER ENCLOSURE - SOUTH 1/4" = 1'-0"03 EMERGENCY GENERATOR - NORTH 3/4" = 1'-0" 05 EMERGENCY GENERATOR SECTION 11/12/19