Loading...
HomeMy WebLinkAboutA102 CONSTRUCTION PLAN - SECOND FLOORRELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City Gf Carmel (� �VT�'laMckw�L DATE: \ 11/14/19 1 CONSTRUCTION PLAN - SECOND FLOORD SCALE: 1/4" =1'-0" IV miiiiiin CONSTRUCTION PLAN LEGEND NOT IN CONTRACT, IF APPLICABLE EXISTING WALL OR ITEM TO REMAIN NEW CONSTRUCTION ITEM GENERAL CONSTRUCTION NOTES A. REFER TO SHEETAOOO FOR DOOR AND WALL TYPES. B. DOORS NOT INDICATED BY A DOOR NUMBER DESIGNATION ARE EXISTING IF APPLICABLE. C. PREPARE ALL EXISTING WALLS AND FLOORS TO RECEIVE NEW FINISHES WHEN APPLICABLE. PATCH AND REPAIR AS REQUIRED. D. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE ALL CASEWORK AND WALL MOUNTED EQUIPMENT. REFER TO ELECTRICAL LOCATION PLANS FOR MORE INFORMATION. E. ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES, RULES, REGULATIONS AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS WITH DISABILITIES ACT (ADA), INTERNATIONAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS. R THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR TOTHE START OFWORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT/DESIGNER IMMEDIATELY. G. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALLSTATE AND LOCAL PERMITS REQUIRED FOR COMPLETION OF THIS PROJECT. H. ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH, SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF THE OWNERS F.F.E. I. ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. ANY DIMENSIONS NOT SHOWN OR DEEMED QUESTIONABLE ARE TO BE VERIFIED WITH THE ARCHITECT/DESIGNER DO NOT SCALE DIMENSIONS ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF NEW STUD, MASONRY/CONCRETE WALLS, CENTERLINE OF COLUMNSANINDOWS, OR FINISH FACE OF EXISTING WALL UNLESS NOTED OTHERWISE. J. CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED. K. DURING THE ENTIRE PERIOD OF CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES, AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED. L. FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 6" FROM ADJACENT PERPENDICULAR PARTITIONS, UNLESS OTHERWISE NOTED. M. ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS, PREMIUM GRADE. N. ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED WITH THE CONTRACTOR, DESIGNER AND THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION. O. CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS NECESSARY TO PREVENT OR MINIMIZE DAMAGE. WHERE EXISTING WORK IS TO BE REMOVED OR ALTERED, RESTORE ADJACENT FINISH TO ORIGINAL CONDITION. EXTEND/REFINISH ALL FRAMES, BASE, AND TRIM WHERE CUTTING HAS EXPOSED ANY UNFINISHED SURFACES. REPAIR ANY DAMAGE TO EXISTING WORK AND RESTORE TO ORIGINAL CONDITION. P. CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE OF DEBRIS, MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE STORED IN A LOCATION APPROVED BY THE LANDLORD. Q. ALL PLUMBING ITEMS AND/OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED WITH INTERIOR ELEVATIONS PRIOR TO ROUGH -IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH THE DESIGNER. R. COORDINATED WITH OWNER AND FACILITY STAFF PROJECT PHASING TO MINIMIZE DISRUPTION OF EXISTING FACILITY SERVICES. PHASING TO INCLUDE ASSURANCE FOR CLEAN AIRFLOW, WRITTEN NOTIFICATION OF INTERRUPTIONS, AND COMMUNICATION AUTHORITY. CONTRACTOR, OWNER, AND FACILITY STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN HEALTH AND SAFETY. THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS DURING ALL PHASES OF CONSTRUCTION USING AIRTIGHT BARRIERS, AND EXHAUST AIR FLOW SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. S. SUBMIT THE REQUIRED NUMBER OF SUBMITTALS FOR DESIGNER REVIEW AND APPROVAL PLUS ONE EXTRA COPY FOR DESIGNERS RECORDS. T. ALL WALLS TO BE PARTITION TYPE W4.11 UNLESS NOTED OTHERWISE. ® CONSTRUCTION PLAN KEYNOTES 101 EXISTING PARTITION FRAMING TO REMAIN. FURNISH AND INSTALL GWB AND MODIFY AS REQUIRED TO MATCH PARTITION TYPE W4.11, TYPICAL. 102 FURNISH AND INSTALL 314' FIRE -TREATED PLYWOOD BLOCKING FOR OWNER SUPPLIED TV. COORDINATE EXACT SIZE AND LOCATION WITH OWNER. 103 PATCH/REPAIR EXISTING FLOORING AS REQUIRED TO RECEIVE NEW FINISH(ES) AT DEMOLISHED PLUMBING ROUGH -INS. 106 FURNISH AND INSTALL FIRE TREATED PLYWOOD PANEL(S) (PAINTED) IN THIS ROOM. COORDINATE EXACT SIZE(S) AND LOCATION(S) WITH OWNER AND OWNER'S IT VENDOR. 107 LAMINATE EXISTING WOOD COLUMN WITH 5/8" GYPSUM WALLBOARD. 108 NEW WOOD COLUMN, PLACEMENT TO ALIGN WITH FACE OF STAIR OPENING. LAMINATE WITH 518" GYPSUM BOARD. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION. 'RECEIVE 115 FINISH THIS WALL TO A LEVEL 5 FINISH FROM INSIDE CORNERTO INSIDECORNER TO HIGH GLOSS PAINT. MITSCH D E S I G N 200 S. Rengeline Rd. I Suite 226 Carmel, Indiana 46032 317.573.2222 w .milschdesgn.com V1 LLJ 1 rx M LU WLnko(n Uwe z iiiiiiiim O o LLLL Ex Q F- 020U �4 Ll J Z LLI ^O �LLJ ZJ(n w LLJ0a z Q 01) Q O ? V�UU \\UP\111I I I I I I II ll���� \o PRS R. C %�•,, AR00034184 Jy T STATE OF T ' Illmll G otter 0 O a o 0 W U W W ^ W LU O O W O O q�¢ Oi 2 U Q Q � U z O N SF W F- N N W m 0 Z !q y O O �Q�'w EZF- wUK NL FEAR, GEBGNSPHG FLANS IOHIGINAL WORMS OF AUTHCREHIPFIXED INATANGIBLE VEOUMOFEYPPESSUN) INpUTEDORPRESENTED BYTHESE DPAW NGS PND DOCLMFNI$ AREOWNED RY, ANG ARE THE PROW EMY OF MnBCH DESIGN, ALL RIGHTS RESERVED, EXCEM FOR USES EXPRESSLY PERWMD N MIFFING CONSTRUCTION PLAN -SECOND FLOOR A102