Loading...
HomeMy WebLinkAboutM100 FIRST AND SECOND FLOOR HVAC PLANSKEY NOTES: GENERAL NOTES: RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City OF Carmel DATE: 11 /14/19 FIRST FLOOR HVAC PLAN _il 1 SCALE: 1/4" = V-0" HP-1 HP-2 �5TON� I/Y�I �5TON� III iO EXTEND AND REROUTE EXISTING BRANCH DUCT AND CONNECT TO NEW DIFFUSER. 2O NEW DUCTING IN BULKHEAD. COORDINATE WITH FRAMING CONTRACTOR. 3O NEW HORIZONTAL FURNACE WITH AUXILLARY DRAIN PAN AND SHUT OFF SWITCH LOCATE ABOVE RESTROOM CEILING. 4) EXISTING SUPPLY AND RETURN DUCT IN TRUSSES TO BE REUSED AND CONNECTED TO NEW FURNACE. REWORK BRANCHES AS NEEDED FOR NEW LAYOUT. SO PROVIDE 14110 OPENINING ABOVE DRYWALL CEILING AND BELOW DRYWALL DECK TO ALLOW FOR RA TO FLOW BACK TO FURNACE. Q2SECOND FLOOR HVAC PLAN SCALE: 1/4"=T-0" 1. REFERENCE SHEET M001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET M002 FOR DETAILS& SCHEDULES. 3. REWORK, SEAL AND REUSE EXISTING DUCTWORK WHEREE POSSIBLE. ALL SUPPLY AIR DUCTWORK SHALL BE FULLY INSULATED PER SPECIFICATIONS. ALL DUCTWORK SHALL BE SEALED PER SPECIFICATIONS. 4. COORDINATE ALL DUCTING WITH EXISTING SPRINKLER MAINS, NEW LIGHTING AND PLUMBING. 2.151 FT2 MITSCH D E S I G N 200 S. Rangeline Rd. I Suite 226 Carmel, Indiana 46032 317,573,2222 w .milschdesign.com GOODERUM & ASSOCIATES ENGINEERING MEP Consulting Engineers 874 Cheltenham Way Avon, IN 46123 P: 317.506.8151 F: 317.745.5761 E: dave@gnaengineering.com Q In L�LLj w N z 0 0 �CD o �w z LL- QQ� Q p L1J Cn Jwz W Z J H 75 w �- Ell CLLJ o Q z LJJ zz C) c�->d No. 020031 STATE OF N ` DATE 09-19-2019 O r m m a rvry j U m w Do d m m O W m m # K F j W K W F G� 2 O H w m Z� m U OZY Do �ZF H 2 U KKW O 0 Too G.O.O. U ALL IDEAS. DESIGNS AND PWIB (ORIGINAL WORKS OF AUTHORSHIP FLYED IN ATANGIRLE MEDIUM OF EVRESGON) INDICATED OR PMESEMED BY THESE DRAWINGS AND DOCUMENTS ARE OWNED BY. AND ME THE %ROPE WYOF MUSED DESIGN. ALL RIGHTS MESER,ED, EXCEPT FOR USES EXPRESSLY FERMNTED IN WRNING FIRST & SECOND FLOOR HVAC PLANS M100