HomeMy WebLinkAboutM100 FIRST AND SECOND FLOOR HVAC PLANSKEY NOTES:
GENERAL NOTES:
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City OF Carmel
DATE: 11 /14/19
FIRST FLOOR HVAC PLAN _il
1 SCALE: 1/4" = V-0"
HP-1
HP-2
�5TON�
I/Y�I
�5TON�
III
iO EXTEND AND REROUTE EXISTING BRANCH DUCT
AND CONNECT TO NEW DIFFUSER.
2O NEW DUCTING IN BULKHEAD. COORDINATE WITH
FRAMING CONTRACTOR.
3O NEW HORIZONTAL FURNACE WITH AUXILLARY
DRAIN PAN AND SHUT OFF SWITCH LOCATE ABOVE
RESTROOM CEILING.
4) EXISTING SUPPLY AND RETURN DUCT IN TRUSSES
TO BE REUSED AND CONNECTED TO NEW
FURNACE. REWORK BRANCHES AS NEEDED FOR
NEW LAYOUT.
SO PROVIDE 14110 OPENINING ABOVE DRYWALL
CEILING AND BELOW DRYWALL DECK TO ALLOW
FOR RA TO FLOW BACK TO FURNACE.
Q2SECOND FLOOR HVAC PLAN
SCALE: 1/4"=T-0"
1. REFERENCE SHEET M001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCE SHEET M002 FOR DETAILS&
SCHEDULES.
3. REWORK, SEAL AND REUSE EXISTING
DUCTWORK WHEREE POSSIBLE. ALL SUPPLY
AIR DUCTWORK SHALL BE FULLY INSULATED
PER SPECIFICATIONS. ALL DUCTWORK SHALL
BE SEALED PER SPECIFICATIONS.
4. COORDINATE ALL DUCTING WITH EXISTING
SPRINKLER MAINS, NEW LIGHTING AND
PLUMBING.
2.151 FT2
MITSCH
D E S I G N
200 S. Rangeline Rd. I Suite 226
Carmel, Indiana 46032
317,573,2222
w .milschdesign.com
GOODERUM & ASSOCIATES ENGINEERING
MEP Consulting Engineers
874 Cheltenham Way
Avon, IN 46123
P: 317.506.8151
F: 317.745.5761
E: dave@gnaengineering.com
Q
In
L�LLj
w
N
z
0
0
�CD
o
�w
z
LL-
QQ�
Q
p
L1J
Cn
Jwz
W
Z
J
H
75
w
�-
Ell
CLLJ
o
Q
z
LJJ
zz
C)
c�->d
No.
020031
STATE OF
N `
DATE 09-19-2019
O
r
m m
a
rvry
j
U
m
w
Do
d
m
m
O
W
m
m
#
K F
j
W
K
W
F
G�
2
O
H
w
m
Z� m
U
OZY
Do
�ZF
H
2
U
KKW
O
0
Too
G.O.O.
U
ALL IDEAS. DESIGNS AND PWIB (ORIGINAL WORKS OF
AUTHORSHIP FLYED IN ATANGIRLE MEDIUM OF EVRESGON)
INDICATED OR PMESEMED BY THESE DRAWINGS AND
DOCUMENTS ARE OWNED BY. AND ME THE %ROPE WYOF
MUSED DESIGN. ALL RIGHTS MESER,ED, EXCEPT FOR USES
EXPRESSLY FERMNTED IN WRNING
FIRST & SECOND
FLOOR HVAC
PLANS
M100