Loading...
HomeMy WebLinkAboutHSM 008 - Sewer10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco Residential SANITARY SEWER PERMIT 999913463 Permit Type Final Subdivision Heritage at Spring Mill Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons 2017-1320 Section Number Heritage at Spring Mill Section 1 & 2 Lot Number PPV II, LLC Address Number 02 Meridian Corridor Station Address 2 Local Sewer Charge - District Contribution Plan Review and Inspection Application Fee EDU Fee Interceptor Fee Other Fees Fees Due Invoice Number MIX Street 0.25 City 310 Zip Code County 0.00 Builder 0,00 150.00 Phone Number 1908.00 Owner 0.00 Phone Number 0.00 2058.00 Occupant Phone Number 1 & 2 8 447 Heritage Terrace Lane Carmel 46032 Hamilton Pulte Group 317-575-2350 PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Grease Trap Grease Interceptor Grit Interceptor Grinder Station Main ID: Slab Foundation Crawl Space Manhole IDs USMH Basement YES Lid Elevation First Floor Elevation Water Service City of Carmel I Basement Elevation Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor HSM14-HSM13 HSM-14 / HSM-13 846.23�// �DSMH� 847.29 ✓ 849.9V 840.10�/ 849.90!/ / 840.10v 3.67 2.61 Ft. Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy / sale of a properrty. Please review attached 1/1 Permit. Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure. terms of the conditional permit, If any, are listed below Plans have been submitted. All fees have been paid. No certificate of insurance required. No additional permits required. No manhole core permit required. The facility is not classified as a FOG facility. (Notes) uy WWI III uaww, i duesi mac i am 7amlllar InE Builder / Owner Signature Printed Name /I Approved By h RyannON t Permit is valid foYEA specmcations and agree to accept responsibility for all work done under this permit. Phone Numt l pl-96"� trict Engineer from the date issued. Permit valid only with TriCo