HomeMy WebLinkAboutApplication TACDOCKET NO. TAC DATE RECEIVED:
Fm• Office Use Only
CA, TECHNICAL ADVISORY COMMITTEE
49'rI
APPLICATION & PROCEDURES
^Fee: $362.00
y�N G
Property Information a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ a ■ ■ ■ a a . . ■ ■ ■ a ■ ■ ■ ■ ■ a ■ ■ ■ ■ ■ ■ . ■ ■ ■ r r r
Tax Parcel ID*: 17-09-31-00-00-026.101, 17-09-31-00-00-026.001 19.19 acres
Area (acres):
Property Address: (approximate) 4309 W 121st Street, Zionsville, IN 46077
Zoning District: S-1 ROSO III Overlay District (If applicable):
Legal Description: (To be typewritten separately.)
* Please attach a separate list for projects with multiple parcels.
Attorney Information
T,,T---. NA
Phone:
NA
a a ON ■ ■ a ■ ■ ■ ■ ■ ■ ■ a ■ a ■ ■ ■ ■ ■ ■ ■ ■ ■ a ■ ■ a ■ ■ a • • • ■ . ■ a ■ ■ ■
Engineer Information ■ • ■ • ■ ! ■ a a ! ■ a ■ a a • ■ ■ a • . a a r ■ ■ a a ■ a a ■ ■ ■ ■ ■ ■ ■ r . r r
Name: Duane Sharrer, Weihe Engineers, Inc.
Address: 10505 N College Avenue, Indianapolis, IN 46280
Phone: (317) 846-6611 Email Address;
sharrerd@weihe.net
Eplan Review Contact Person: Duane Sharrer Phone: (317) 846-6611
Email: sharrerd@weihe.net
Owner Information
pmaname: Paul S�oon
Address: 11731 Cold Creels Court, Zionsville, IN 46077
Phone Day: (317) 714-2406 Evening: Same
Email Address: Paul@shoopmanhomes.com
Project Description a a a a ■ a ! ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ a ■ ■ ■ a ■ ■ ■ ■ ■ ■ ■
Please includee-a brief summary/history of the project:
Waterfront of West Clay Section 5-13 is the final section to be developed in the project that started out as the Sanctuary
at 116th Street with the more recent sections east of West Road being called the Waterfront of West Clay.
Section 5-B will consist of 27 lots on 19.19 acres.
Affidavit: I, hereby swear that I am the owner/co%zaat4zurchascr of property involved in this application and that the foregoing signatures, statements
and answers herein contained and the infor 'on herewith bmitted are in all respects true and correct to the best of my knowledge and belief. 1, the
undersigned, authorize the applicant to on my behalf with egard to this application and subsequent hearings and testimony.
Signature of Owner:
rinted: Paul Shoopman Date: 11119/2019
Page 1 of 2 k, Advisory Committee Application 2019 Revised: 01/04/19
TACReview Instruction Sheet ■ ■ ■ ■ ■ . ■ a ■ ■ . . . . . . r ■ ■ ■ . ■ ■ . ■ ■ ■ ■ ■ . ■ ■ ■ ■ ■ ■
I . Initial discussion with staff regarding applicable zoning ordinances, design standards, condition/capacity of
infrastructure, and availability of utilities.
2. Allow plenty of time for the Dept. of Community Services (DOGS) staff review and the Technical Advisory
Committee (TAC) review process (approximately 30-45 days). (See the Plan Commission Calendar for TAC
Meetingfiling deadlines.)
3. NEW: As of January 1, 2019, electronic -only submittals are accepted. Initially, only this filled out application needs
to be ernailed to DOCS staff. After a docket no. is assigned, plans are to be submitted electronically through
ProjectDox, Carmel's ePlan review software. Please see the Electronic Plan Review handout for more information on
the process and what needs to be submitted. Plans are to be distributed to all TAC authorities b the he applicant, by the -
fling deadline.
4. INFORMATION NEEDED for formal DOCS staff and TAC review:
• One electronic copy of the completed TAC application with Legal Description attached (email to DOCS).
• One electronic copy of location map showing location of site in question, zoning, and existing Iand use of all
adjacent properties (upload to ProjectDox).
• One electronic copy of plans drawn to scale with all dimensions and depicting all existing and proposed
structures, exterior architectural building elevations, landscaping, drainage, Stormwater Pollution Prevention
(SWPPP), lighting, signage, and any other supporting documentation to fully understand the proposal. All
documents must be legible (upload to ProjectDox).
5. After DOCS staff review, the petitioner will be notified of the Docket Number, Meeting Date, Fees, and any
outstanding information needed to process the application.
6. No public notice is required for this petition type.
7. Filing Deadline: A complete application package of the above -referenced information must be submitted to
DOCS and to the TAC Members (see members list online) approximately 30 days prior to the meeting date
(see Plan Commission & TAC calendar). The determination of a complete application submittal is at Staff
discretion.
8. 'Filing Fee: The filing fee, as determined by staff, must be paid at least 5 days prior to the meeting date.
Failure to pay the filing fee by this time will result in the item being tabled to the next month's TAC agenda.
9. The property owner, property owner's attorney, or someone with the property owner's Power of
Attorney must be present at the Carmel Technical Advisory Committee meeting to give a short
presentation.
10. The Technical Advisory Committee (TAC) generally meets the Third Wednesday of each month at 9:00 a.m, in the
DOCS Conference Room, City Hall — Third Floor, One Civic Square, Carmel, IN 46032. (Ten days prior to the
meeting, agendas are sent to petitioners and TAC members.)
1I. Generally, applications are acted upon by the Committee in one meeting. However, TAC, at its
discretion may table an item at any time. The petitioner may follow up with each TAC member,
individually, after the meeting is held, in order to address review comments and concerns.
DOCS Contact Info:
Civic Sq. 3rd Mr., Carmel, IN 46032
P: 317-571-2417 1 W: www.carmeldocs.com
Page 2 of 2 File: Technical Advisory Committee Application 2019 Revised: 01/04/19