HomeMy WebLinkAboutA1.01 - DEMOLITION PLAN AND FLOOR PLANWALL RATINGS LEGEND
NEW
1 HOUR FlRE BARRIER,
1 HOUR FlRE RATED SMOKE
BARRIER
2 HOUR FIRE BARRIER
2 HOUR FlRE/SMOKE BARRIER � �
3 HOUR FIRE WALL
1 HOUR FIRE BARRIER
1 HOUR FlRE RATED SMOKE
BARRIER
2 HOUR FIRE BARRIER
2 HOUR FlRE/SMOKE BARRIER
� � � 3HOURFIREWALL
NON-RATED SMOKE PARTITION - - - - - - - - - NON-RATED SMOKE PARTITION
EXISTING
�
�
GENERAL DEMOLITION NOTES
1. THECONTRACTORSHALLFIELDVERIFVALLEXISTMGCONDITIONSPRIORTOBIDDMGANDSHALLBERESPONSBLEFORPROJECTCOMPLETION
THAT IS CONSISTENT W ITH THE MTENT OF TH E DESIGN AND ALL APPLICABLE BUILDING CODES
2. ALLDRAWINGITEMSINDICATEDONTHISPLANWITHHEAWDASHEDLMESASWELLASOURETSANDOTHERDEVICESASSOQATEDWITHTHESE
ITEMS SHALL 6E REMOVED IN THEIR ENTIRETV UNLESS NOTED OTHERWISE. REMOVE RELATED MECHANICAL, ELECTRICAL, AND PLUM6WG
(M.EP.) ITEMSAS REQUIRED FOR NEW CONSTRUCTION. REFER TO M.EP. DRAWMGS FOR ADDITIONAL INFORMATION
3. REMOVEALLEXISTWGFINISHESINCWSIVEOFFLOORMG,BASE,WALLCOVERWGSANDCEILWGSVSTEMSTHROUGHOUTANDINTHEIRENTIRETV
AS REpUIRED FOR NEW CONSTRUCTION.
4. MAKEDEMOLITIONQFANANDCOMPLETEINAMANNERTOACCEPTNEWFlNISHESAND/ORSURFACESORASPERPRODUCTMANUFACTURER'S
SPEQFlCATIONS W HERE THOSE RE�UIREMENTS ARE MORE RESTRICTNE.
5. WHENDEMOLITIONCAUSESOREXPOSESDAMAGEORUNSUITABLESURFACESTOFLOOR,WALL,ORCEILINGSURFACESTOREMAMEXPOSEDIN
THE FIN ISHED WORK, THE CONTRACTOR SHALL PATCH AND REPAIR CONDITIONS IN A MANNER TO ACCEPT NEW FIN ISHES ANDIOR SURFACES AS
PER PRODUCT MANUFACTURER'S SPECIFlCATIONS WHERE THOSE REQUIREMENTS ARE MORE RESTRICTIVE.
6. ALLDEMOLITIONITEMSSHALLBECONSIDEREDTHEPROPERTVOFTHEOWNERUNTILVERIFICATIONHASBEENRECEIVEDFROMTHEOWNER
REGARDING THEIR DISPOSAL PRIOR TO REMOVAL FROM THE SITE. ALL ITEMS NOTTO BE RETAINED BY THE OWNER SHALL BE REMOVED IN THEIR
ENTIRETV.
1. TEMPORARVDUST-TIGHTPARTITIONSANDDOORSSHALLBEPROVIDEDANDMAINTAMEDBVTHEGENERALCONTRACTOR,ASREQUIREDBVTHE
OWNER,ARCHITECT,ANDENGINEER. GENERALCONTRACTORSHALLDETERMINEEXACTLOCATION.
8. WHEREANVNEWOREXISTINGDUCTWORKORPIPINGPENETRHTIONSMTHEFLOORARETOBEREMOVEDORRELOCATED,THEPENETRATIONS
ARE TO BE FlLLED WITH CONCRETE THE FULL FLOOR THICKNESS AND FlNISHED IN A MANOR SUITABLE TO ACCEPT NEW FlNISHES.
9. WHEREANVNEWOREXISTMGDUCTWORKORPIPWGPENETRATIONSINTHEWALLSABOVECEILMGARETOBEREMOVEDORRELOCATED,THE
PENETRATIONS ARE TO BE PATCHED AND REPAIRED AS REpUIRED TO MATCH ADJACENT FINISHES OR ACCEPT N EW FINISHES AS APPLICABLE.
10. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROTECTING OWNER EQUIPMENT WHICH CANNOT BE REMOVED FROM THE PROJECT AREA.
CONTRACTOR TO COORDINATE WITH OWNER FOR REMOVAL OR RELOCATION OF EpUIPMENTAND CONSTRUCTION.
11 REFER TO THE MANDATORY CONTRACTOR ORIENTATION REpUIREMENTS FOR DEMOLITION IN "SENSITNE MEDICAL AREAS". DURING DEMOLITION,
SENSITIVEMEDICALACTIVITIESMAVBEOCCURRINGINADJACENTAREAS. DUSTANDNOISELEVELSARETOBEKEPTTOAMINIMUM.
12 PORTIONSOFTHEBWLDWGSHALLBEOCCUPIEDDURWGCONSTRUCTION.THEGENERALCONTRACTORSHALLFOLLOWTHEFOLLOWMGLIFE
SAFETY ISSUES. FAILURE TO LIST ALL LIFE SAFETY ISSUES DOES NOT RELIEVE THE CONTRACTORS FROM COMPLYING WITH FEDERHL, STATE,
ANDLOCALCODES. THECONTRACTURALAGREEMENTBETWEENTHECONTRHCTORANDOWNER,ANDOTHERGOVERNINGBODIESWHICHHAVE
JURIDICTION ON THIS PROJECT. THE FOLLOWING ARE INTERIM LIFE SAFEiY CODE ISSUES WHICH ARE SPEQFlC TO THIS PROJECT AND MUST BE
ADDRESSED:
A. INSURE ALL EXITS PROVIDE FREE AND UNOBSTRUCTED EGRESS, STAFF AND PERSONNEL SHALL RECENE TRAINMG AND W RITTEN
NOTIFlCATION IF ALTERNATNE EXITS MUST BE DESIGNATED.
B. INSUREFREEANDUNOBSTRUCTEDACCESSTOEMERGENCYDEPARTMENTSORSERVICESFOREMEGENCYFORCES. COORDINATE
W ITH ON W ER AND ARCHITECT.
C. INSURE FIRE ALARM, DETECTION AND SUPPRESSION SVSTEMS ARE NOT IMPAIRED. A TEMPORARV, BUT EpUNALENT SVSTEM SHALL
BE PROVIDED, INSTALLED, AND TESTED PRIOR TO ANY EXISTING FIRE SYSTEM BEING IMPAIRED.
D. INSURETEMPORARVTCONSTRUCTIONPARTITIONSARESMOKETIGHTANDBUILTOFNON-COMBUSTIBLEMATERIALS. THESE
PARTITIONS SHALL BE COORDINATED W ITH THE O W NER AND ARCHITECT.
E SMOKING SHALL BE PROHIBITED EXCEPT IN DESIGNATED AREAS OF THE B WLDING.
F. DEVELOPANDENFORCESTORAGE,HOUSEKEEPING,ANDDEBRISREMOVALPROCEDURESTHATREDUCETHEFLAMMABLEAND
COMBUSTIBLE FlRE LOAD TO THE LOWEST LEVEL NECESSARY FOR DAILY OPERATIONS.
G. IOSHA REQUIRES MATERWL SAFETY DATA SHEETS (MSDS) FOR ALL MATERIALS BEING USED OR STORE� ON THIS PROJECT BE MA�E
AVAILABLETOALLWORKERSONTHISJOBSITE. COPIESMUSTBEPROVIDEDTOTHEOWNER'SDIRECTOROFSECURITV,IMMEDIATELV,
AS WORK BEGINS.
H. SECUREALLTOOLSANDCONSTRUCTIONMATERIALSDURINGBREAKSANDNON-CONSTRUCTIONHOURS.
ALL RATED WALLS AND SMOKE PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE BOTTOM OF THE STRUCTURAL FLOOR OR
ROOFSLABABOVE. SEAIJFIRESTOPATTOPANDBOTTOMOFWALLANDAROUNDALLPENETRATIONS. PACKSAFING
INSULATIONINTHEVOIDSPACEBETWEENMETALDECKFLUTESANDTHETOPOFTHERUNNERCHANNEL CONTRACTORSHALL
FURNISH AND INSTALLALL FIREPROOFING MATERIALS NECESSARV TO RETAIN THE INTEGRITV OF FIRE RATED CONSTRUCTION.
CONTRACTOR SHALL PROVIDE FIRESTOPPING W ITH UL LISTING AS REQU IRED BV THE MANUFACTURER'S RECOMMENDATION TO
COMPLETE THE INTENDED ASSEMBLV OF THE WALL TVPE.
REFER TO SHEET L1.01 FOR W AW PARTITION PRIORITV DETAIL AND INFORMATION. THIS DETAIL APPLIES TO ALL
INTERSECTIONS OF RATED WALLS AND NON-RATED WALLS.
_�
SPECIFIC DEMOLITION NOTES
iO REMOVELAV-INCEILMGANDUNISTRUTINITSENTIRETV.6ULKHEADSARETOREMAIN.
OREMOVE SHEET VINVL FLOORING IN ITS ENTIRETV.
3O REMOVECOUNTERTOPONLV. CASEWORKTOREMAIN.
4O REMOVE COUNTERTOPAND SUPPORT BRACKET IN ITS ENTIRETV.
5O EpUIPMENTTOBEREMOVEDBVVENDOR
6O REMOVE OLD LIGHTMG CONTROL BOX.
]� REMOVE LAV-IN CEILMG IN ITS ENTIRETV.
BO TEMPORARV CONSTRUCTION CONTAINMENT BARRIER WITH LATCHMG DOOR
TEMP RVCO RUCTI ONTAI NTBAR
10 EMOVE D ORAND AME FOR EINSTALLATION IN N W CONST UCTION.
11 REMOVE PORTION OF WALL FOR DOORAND FRAME
�
i
u ' u
� 4�
15
15
RELEASEU FOR CONSTRl1CTI0N
Su6jec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
Jj¢a��1�VonV�nl i�
�
onrE: 11 /22/19
K�
�!
J 5
��
��_�� 1i �
6 t�—��Jl ��
6'- 0" O
� ki � 3 � �
MIN OO
,� U
8
� - �
I i 9 i
� �
—� I+�E — — --
�
a��
�
,�;
�
,�.- � � H �.,�
,/
GENERAL PLAN NOTES
1. ALLDIMENSIONSARETOFACEOFFINISHEDWALL,ORCENTERLINEOFCOLUMNS,UNLESSOTHERWISENOTED.
2. REFER TO PROJECT MANUAL AND SHEET L1.01 FOR INFORMATION REGARDMG METAL STUD FRAMMG AT ALL DOOR LOCATIONS.
3. CONTRACTORSHALLVERIFVCONDITIONOFEXISTMGG.WB.FINISH.CONTRACTORSHALLTOUCH-UPIREPAIREXISTMGGWB.ASREpUPoEDTOBEFREE
OF ALL BLEMISHES AND PREPARE TO RECENE NEW FINSIHES. N EW GYPUSM WALL BOARD (G. W B.) SHALL BE 5/8" THICK, TYPE X.
4. ALLDOORSMUSTMEETREQUIREMENTSOFINDIANAHANDICAPPEDACCESSIBILITVCODEREFERTOSHEETL1.01FORDOORQEARANCE
REpUIREMENTS.
5. PROVIDEENCLOSURESFORUNDERSIDEOFCASEWORKWALLCABMETSANDFIXEDSHELVESWHERETHESECASEWORKELEMENTSMEETINACORNER.
ALL OUTSIDE CORNERS OF COUNTERTOPS, TRANSACTION TOPS, ETG SHALL HAVE A 3" RADIUS, UNLESS NOTED OTHERWISE COUNTERTOPS SHALL BE
25' DEEP UNLESS INDICATED OTHERWISE OR REpUIRED TO 6E DEEPER BV EpUIPMENT SHOWN ON THE DRAWMGS. PROVIDE FlLLER PANELS IN CORNERS
WHERE CASEWORK DOORS/DRAWERS MEET AS REpUIRED TO PROVIDE ADEpUATE ROOM FOR OPERATION.
6. ALLCASEWORKSHALLBEPERFORMEDINACCORDANCEWITHARCHITECTURALWOODWORKINSTITUTE(AWI)PREMIUMGRHDEpUALITYSTANDARD.ALL
CASEWORK HARDWARE SHALL BE HEAW-DUTV ALUMINUM INSTITUTIONAL pUALITV.
] ALLREFERENCESTO"TREATED"WOODSHALLMEANFIRE-RETARDANTTREATED.ALL6LOCKWGSHALLBEFIRE-RETARDANT.
8. ALLCORRIDORWALLSSHALLRESISTTHEPASSAGEOFSMOKEFROMFINISHFLOORUPTOANDINCWDMGDECKABOVE.SFALALLPENETRATIONS,
OPENINGS, GAPS, ETC.
9. CORNERGUARDSSHALLBE3"DOUBLEBEVELSTAINLESSSTEELFROMI/i6"ABOVEBASET01/i6"BELOWCEILINGORBULKHEAD.
10. INSTALL'SLIP-TRACK' STUD CON NECTION AT ALL METAL STUDS THAT EMEND TO DECK ABOVE.
it FLOORPREPARATIONUNDERLAVMENTSHALLMEEPBOOPSICOMPRESSNESTRENGTHASTESTEDPERASTMC109.PROVIDEFLOORFLATNESSAS
REQURIED BV VENDOR.
12 COORDINATE WITH OWNER AND FAQLITY STAFF, PROJECT PHASING TO MINIMIZE DISRUPTION OF EXISTING FACILITY SERVICES. PHASING TO INCLUDE
ASSURANCE FOR QEAN TO DIRTV AIRFLOW, EMERGENCV PROCEDURES, CRITERIAFOR INTERRUPTIONS, AND COMMUNICATION AUTHORITV.
CONTRACTOR, OW NER, AND FACILITV STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN HEALTH AND SAFETV.
THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS DURMG ALL PHASES OF CONSTRUCTION USMG AIR TIGHT BARRIERS, AND
EXHAUST AIR FLOW SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZON E.
13. VERIFVALLCRITICALDIMENSIONSWITHINAND/ORRELATEDTOTHEEXISTINGBUILDING,DIMENSIONS,ANDCONDITIONSINDICATEDWHEREDETERMMED
6V VISUAL SURVEV AND/OR 6V INFORMATION FROM EXISTMG DRAWMGS. ANV DISCREPANCIES SHALL 6E COORDINATED WITH ARCHITECT.
14. PROVIDEFIREEXTINGUISHERCABMETSINLOCATIONSINDICATEDONPLAN.ALLFIREEXTINGUISHERCABMETSSHALLBECENTEREDWITHMTHEWALL
IN WHICH THEV ARE LOCATED, UNLE55 OTHERWISE INDICATED ON THE PLAN.
15. PATCHIINSTALLNEWLEADSHIELDMGATALLLOCATIONSDISTURBEDBVNEWCONSTRUCTION. REFERTOPHVSICIST'SREPORTFORTHICKNESS
EpUNALENT REpUIRED.
16 ALLFlRERATEDWALLSANDFLOORPENETRATIONSMUSTCOMPLVWITHASTME814.
11 REFER TO VENDOR MFORMATION DRAWINGS FROM SIEMENS, STRVKER, AND INTEGRITECH FOR ADDITIONAL MFORMATION. CONTRACTOR SHALL
INCORPORATE ALL REpUIREMENTS FOR VENDOR SUPPLIED EpUIPMENT.
SPECIFIC FLOOR PLAN NOTES
iO REPAIRGVPSUMBOARDGOUGE ENSURELEADSWELDINGISINTACT. PATCHANDREPAIRGVPSUMFORSMOOTHSURFACE.
O2 INSTALL NEW GVPSUM BOARDAT LOCATION OF OLD LIGHTMG CONTROLS. ENSURE LEAD SHIELDMG IS INTACT. PATCH AND REPAIR GVPSUM FOR
SMOOTH SURFACE.
O3 REPLACELEAD-LMEDASTRHGALANDBOTTOMSWEEPSONBOTHLEAVES.
4O NEWSOLIDSURFACECOUNTERTOPONEXISTINGCASEWORK. MATCHPREVIOUSSHAPEIPROFRE.
OS 30"X30"PLASTICLAMINATECOUNTERTOPFORSIEMENSCHILLERWITHRAKKSSUPPORTBRACKETTOSUPPORTGREATERTHAN80LBS,INSTALLED48"
AFE PROVIDE TRAV WITH 25 GALLON CAPACITV.
O6 WALL-MOUNTED MONITOR. COORDINATE EXACT LOCATION OF MONITOR WITH ONWERANDADDITIONAL REpUIREMENTS PER INTEGRITECH.
�] Y'DOUBLEBEVELSTAMLESSSTEELCORNERGUARDATCASEWORKCORNER
O8 HEAWDASHEDLMEINDICATESWALLPROTECTIONTO60"AFF
O9 HEAW DASHED LME INDICATES FULL HEIGHT WALL PROTECTION TO BULKHEADABOVE
10 INSTALL FLOOR PREPARHTION UNDERLAYMENTAS REpUIRED BELOW EpUIPMENT TO MAINTAIN FLOOR FLATNESS REpUIREMENT. REFERTO VENDOR
DRAWINGS.
AT
12 INFlLL OPEMNG WITH A�ETAL STU6S, LEAD-LINED GVPSUM 60ARDRND SOUND"ATTENUAIION 6ATT INSULATION"
13 INSTALL SALVAGED DOOR AND FRAME FROM DEMOLITION. PROVIDE NEW CLOSER THAT ALLOW S 1]5 DEGREE OPENMG.
. . . . . . . . . . .
EXISTING
CORRIDOR
BiC12
� II IIII �
a — — �
EXISTING EXIS �ING EXISTING
CORRIDOR .���- PATI NT MED
B1C11 T014ET � B156
I II B1 5
_uL
I u u
EXISTING
CORRIDOR
BiC06
�u - -
I�c c� c.cc.c � .c. ��,.. c.c:
8 9 8 � 8
�! GAT�iLA 12
a i5 %�" � � ��
6 � B166 �
—, � s
I 2 T
.10 �� q
� � r �� e
EXISTING � � . � �
II CORRIDOR 3
BiC10 1 8 --- -
��I
��
I�I
�
EXISTING
NURSE
STATION
Bi NO3
i�
Y\ I
o�� ``
� CONTROL I II
�' B164
EXISTING�
CORRIDOR
B1C08
�
I�
� ��
� FIRST FLOOR PLAN �Z
`J 1 /8• _ 1•_�•
m��
���
N � W
� 9 f
m �
i �
w
u
N
�, � i/i
� c
N � U 'VJ
p� — 3 N
f6 U �i � UJ
� � � d �
�'�m�
- -e��
�3s
��o'�
�£_<
krc'
d�✓
0 � O ac~
Z � y 2 �_
�� .
0 REVISIONS
1 �ASI#1 tOpp9
CO
:.ti
m Z
m w
� w a
Q J N
�"� w 2 N
_ �'x��.,
Z � � Q O
= Z � � �
H W Z W Z
J � � � —
w � Q Z W
W o ��J=r
� W ? � U
c
0
0
� �
� a
� � e
LO
� ���
�
Y ,� _
W�
LL
�
DEMOLITION
PLAN AND
FLOOR PLAN
A1.01
�
P
2
�
�
�
�
£
R
OKEYPLAN �Z
1" = 100'-0"