HomeMy WebLinkAboutSIEMENS - A-101SINKS, COUNTERTOPS AN� ALL
CASEWORK SHOWN IS SUGGESTE� AND
MUST BE DESIGNED SUPPLIED AND
INSiALLED BY CUStOMER/WNiRACiOR.
THESE MONITORS ARE TO
BE MOUMED ON iHE
CUSTOMERS OEM BOOM.
�
l z9
C—ARM
PARK
POSRION
IT IS THE RESPONSIBILIIV OF THE
CUSTOMEft/CONTftACTOR TO PROVIDE A
MEANS OF MOUNiING iHE SYNGO X PC
TOWER OFF OF FlNISHED FLOOR FOR
�AMAGE PROTECTION AGAINST TIP—OVER,
FWI�S, IMPACT, EiC.
26._g ��4..
15_it
I U I
i
PATIENT TABLE i Q
MOVEMENt RANGE 8 30 � I �
(HEAD-EN�) ,____I______
31
/� . ' i / . . _,
�,
-�r
�I
h�� _ � �
_� �
11 ��' ----- _
`������
11 —
� ::�I�
�.i
� I � '�� �
� '-� l' �
� '
�� �
���
A
0
IN CASE OF POWER FAIWRE, A UPS PROVI�ING iABLE
MOVEMENT IS REpl11RED WHEN A TILTING/OR TABLE IS
PURCHASED. IF NOT PURCHASED FROM SIEMENS, IT IS
THE CUSTOMER'S RESPONSIBILIIY TO PROVI�E A UPS
iHAt ALLOWS A iILTING/OR iABLE i0 BE MOVE� t0 A
ZERO DEGREE POSITION �ESIGNATED FOR CPR WITHIN
15 SECONDS. THIS REpUIREMENT IS CONSISTENT WITH
IEC 60601-2-4b CL 201.15.101.
6 iHE CUSiOMER OR SIEMENS-SUPPLIE� UPS SOWiION
IS NOT INSTALLE� AN� OPERATIONAL AT THE TIME OF THE
SIEAfENS OELNERV, 9EMEN5 CANNOT AN� WILL NOT
INSTALL THE AFFECTED SIEMENS SVSTEM�.
SUGGESTED 7-6" SpIIARE SHELF 4B"
A.EE FOR MOUNTING COOLING UNIT
ABOVE IMAGER. PROVIDE TRAV
UNDERNEATH FOR LEAN PROTECTION
WIiH 25 GALLON CAPACIiV. SHELF
PROVIDED 6Y CUSTOMER/CONTRACTOR.
.. 10'-4 1/B'
�
PATIENT TA6LE
MOVEMENT RANGE
� E4UIP.
, ROOM
aROPoseo z'-s" oeEa
COUMER70P PROVIDED BY
CUSiOMER/WNiRACiOR.
� EXISiING
SEN515
ORIENTATION POINT CONTROL
oF annENr rne�E ROOM
AT FLOOR
THIS SEf OF FlNAL DRAWINGS IS REFLECTNE OF THE lATEST
SALES CONFlGURAtION. ANY CHANGES i0 iHIS SALES
CONFIGl1RATI0N MAV REQIIIRE A REVISION TO THIS PROJECT PLAN.
IF REQUESTED, SIEMENS WILL PRODUCE A REVISED SEf OF FINAL
DRAWINGS TO REFLECT THE CHANGES, HOWEVER SIEMENS IS NOT
RESPONSIBLE FOR ANY CONSTRUCTION COSTS ASSOQATED WITH
7HE CHANGES iHAi OCCUR FROM iH15 PLAN MODIFlCAtION.
7_2 1�
FlNISHED CEILINGJ �
ARTIS ZEE CEILING
C-ARM SY4EM �� �i /
MOVEMENT��4 � t� ,
1� i i��1 i
� j �� �r�
�W
d
\ p
C
o �
��K
�
��
FlNISHED
FLOOR
5-6
�
PATIENT TABLE
REpUIRE� MINIMUM HEIGHT IN DROP
CEILING FOR CORRUGATED HOSE
HOL�ER AN� LAYING CABLES; FOR
�ETAILS REGARDING THE CEILING
OUTLEf SEE SHEET 5-102.�
� ROOM HEIGHT MEASl1RED FROM THE HIGHEST POINT OF THE FlNISHED FLOOR
(WCWDING FLOOR COVERING) TO THE LOWEST POIM OF THE CEILING
SUBSTRUCTURE
WITH TILTING TABLE
THE "B10" FIXPOINT IS A
�DCS LARGE THRU-FLOOR PENEfRATION
�ISPLAV PROVI�ED AS A MEANS OP
CONNECTING A TABLE INJECTOR OR
OTHER NON-9EMENS ACCESSORIES
AT THE TABLE FOR WHICH CABLE
ROVIING iHROUGH iHE SIEMENS
� TA6LE BASE WOULD BE
PROHIBITED. THIS OPENING CAN BE
ELIMINATE� AS REQUIRED, OR IT
'� -� CAN BE COMBWE� IMO A
� .� � CU40MER-Sl1PPLIE� GAS/UiILIiV
BOX ON THE FLOOR. NOTE: THE
7-0" DISTANCE FROM TABLE
ISOCEMER SHOWN HERE APPLIES
\ ?O A CA6LE PENEiRAiION POINi
% N Y. SEE DIAGRAM FOR POSSIBLE
BOX PUCEMENT AND HEIGHT
OPTIONS. VALIDATE E%ACT
irv. PLACEMENT WITH SIEMENS PROJECT
� I ARTIS Q/Q.ZEN/ZEE CEILING TYPICAL ELEVATION
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
Jj¢a� ��'`1�Vm,VN�nd. �
�
onrE: 11 /22/19
SCALP
NONE
NON-SIEMENS (OE
DISPLAY BOOMS
IMPORTANT SAFET' CRRERIA' FAIWRE TO MEEf THE FOLLOWING
REQUIREMENiS MAV RESULi IN RISK OF INJURY i0 PAiIENiS, PERSONNEL
OR DAMAGE TO TNE EQIIIPlAENT!
1) IT MUST BE POSSIBLE TO MANUALLY MOVE THE BOOM VERTICNLLV WITH
A FORCE LE55 THAN 85 N(19 LBS) WHEN POSITIONING THE �ISPIAY
BOOM OVER iHE PAiIENi.
2) TO AV01� THE RISK OF CRUSHING PERSONS OR �AMAGING EpUIPMENT
IN iHE EVENi iHAi iHE ANGIOGRAPHY SYSiEM COMES INiO WNiACi WIiH
THE OiSPLnV BOOM. IT MUST BE POSSIBLE TO PUSH THE BOOM AWAY iN
A HORIZONTAL �IRECTION WRH A FORCE LE55 THAN 50 N(11 LBS).
3) lAOTORRED, HEIGNT—A�JUSTABLE DISPLAY B00lAS WHICH CANNOT
MANUALLV BE PUSHE� AWAV MAY NOT BE USE�.
DELNERY AN� INSTALLATION�
IT IS RECOAIlAENOED THAT INSTALLATION OF 3RD PARiY �ISPIAV BOOMS 6E
COOR�INATE� WITH THE INSTALLATION OF THE SIEMENS SYSTEAI. IN OR�ER
i0 ENSURE iHE SIMULiANEOUS INSiALIAiION OF iHE SVSiEM AND iHE
DISPLAY BOOM, THE CUSTOMER SHOUL� TAHE STEPS EARLY IN THE
PLhNNING PROCESS TO ENSURE THAT THE BOOM MANUFACTURER'S LEA�
TIME CAN BE COORDINNTED WITH THE DELNERY OF THE SIEMENS
EQUIPAfENT. THE THIRD—PARN AIANUFACTIIRER IS RESPONSIBLE FOR THE
INS1ALLAilON, MAINIENANCE, AN� SERVIGE OF THE �ISPUV BOOM(5J. 1HE
THiRD—PARiY MANUFACTURER IS RESPONSIBLE FOR INSTALLiNG THE
SIEMENS COAIPONENTS IN THE �ISPIAY BOOM IN ACCOROANCE WRH
SIEMENS SPEQFICATIONS. SIEMENS ASSUMES NO RESPONSIBILIT' FOR ANY
DAMAGE TO SIEMENS COMPONENTS WHICH ARE NOT iNSTALLE� iN
ACCOR�ANCE WITH SIEAIENS SPECIRCATIONS. SIEMENS TECHNICIANS A1UST
BE GIVEN INSiRUCiIONS AND/OR iRAINING AS APPROPRIATE BV THE 3RD
PARtt AfANl1FACTURER FOR MAINTENANCE/SERVICE OF THE SIEMENS
COMPONEMS (LE. �ISPIAY, CABLES), OR A TECHNICIAN FROM THE
THiRD—PNRiV MANUFACTURER MUST BE PRESENT WHENEVER NNV SERVICE
WORK IS PERFORAIED.
STATE AGENCY REVIEW
PRIOR TO SIEMENS EOUIPMENT INSTALLATION, APPROVAL OF
CONSTRUCTION OR STRUCTURAL MODIFlCATIONS UTILRING %-RAV FOR
DIAGNOSiIC OR iHERAPEUiIC PURPOSES, MUSi BE OBiAINED BY iHE
Cl1Si0MER FROM iHE APPROPRIA?E SiA?E AGENCV, IF APPLICABLE.
CE�L�NG
HEIGHT
REQUIREMENT
8 Ff. — 11 IN.
NTION: ������,� �������� ,,,'`��, � ���� «. ��� �,� ���� �� .,�� � �� �� �� ,:�, � ������� ���� ����`'�'�, �;� �,���� �� �
� ��� � � � � � �,� �
� u i i e i. � i i_
r �r v � i r [ r i, r� i i ra n i r r r r �.n u u- rra r r- , r�.
Ci � VAS C CC Ili . til/V i H� GHAL IC �ti01D �c fE �F5Fi1�. u YC r F.CI< L J P4�i ..
o9/OB/19 RE�acATE IMACER ANo
COOLING UNIT
oa/1a/1s REvisEo FiNn� aER
11PDATED SALES ORDER
os os � y A-ioie(q w+soN om[o os�zz/i9
// nrPeovEo ar cusrauw roe nru�s
IAr\li �Hi.YN:iIJIPPI
—ISSUE BLOCK—
o/am��a[ cwic
REV. 21
ARCHITECTURAL NOTES
1) ALL PRELIMINARV EpUIPMENT UYOUTS SUBMITTED BV SIEMENS
HEALTHCARE ARE BASED ON THE RECOMMENDE� SPACE NECESSARY FOR
iHE OPERAiION AN� SERVICEABILIiV OF iHE EOUIPMENi BEING
PROPOSED. 9EMENS WILL NOT SUBMIT AN EpUIPMENT UVOUT THAT IS
NOT IN THE BEST IMEREST OF BOTH THE CUSTOMEft AND SIEMENS.
ALL EOUIPMENi LAVOUiS ARE BASE� EIiHER ON AN AC?IIAL SIiE
SURVEV OR ARCHRECTURAL �RAWINGS SUPPLIED TO 9EMEN5. SIEMENS
WILL NOT BE RESPONSIBLE FOR ANY ALTERATIONS THAT ENCROACH
WIIHIN �ESIGNAIE� SAFEfV AN� SERVICE CLEARANCE ZONES AS
INDICATED ON DRAWINGS (I.E.. PIPE CHASES, VENTILATION DUCTS,
CASEWORK, AND SOFFlTS, EfC.) MA�E BY THE WSTOMER OR REOUIRED
BV A CU40MER'S ARCHIiECiURAL FIRM ONCE PRELIMINARY DRAWINGS
HAVE BEEN SUBMITfED AND APPROVED. DO NOT ALTER ANV
SPECIFlCATIONS AND/OR �IMENSIONS WITHOUT CONTAC➢NG AN�
RECEIVING WRITfEN CONFIRMAtION FROM SIEMENS PROJECi MANAGER.
2) SIEMENS HEALTHCARE IS NOT AN ARCHITECTURAL OR ENGINEERING
FIRM. DRAWINGS SUPPLIED BY SIEMENS ARE NOT CONSTRUCTION
DRAWINGS. THEREFORE, THESE DRAWINGS ARE TO BE USED ONLY FOR
INFORMATION TO COMPLEMENT ACTUAL CONSTRUCTION DRAWINGS
AVAIUBLE FROM A CUSTOMER APPOWTED ARCHITECTURAL
REPRESENTATNE OR A CUSTOMER'S ENGINEERING DESIGN GROUP. THE
CUSTOMER'S ARCHITECT AND GENERAL CONTRACTOR SHALL BE
ULTIMATELV RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE CO�ES
AND PROFESSIONAL �ESIGN REQUIREMENTS INCLUDING OSHA/NEC
SAFET' CLEARANCE REOUIREMENiS IN A��IiION i0 9EMEN5-REOl11RE�
SAFEIY/SERVICE CLEARANCES SHOWN.
3) THE CUSTOMER IS RESPONSIBLE FOR ALL ROOM AND AREA
PREPARAiION WSiS, PROFESSIONAL FEES, PERMIiS, REPORiS, AN�
INSPECTION FEES.
4) EOUIPMENT WARRANTIES, EXPRESSE� OR IMPLIED ON THE PART OF
SIEMENS SHALL 9E CONiINGENi 11PON 4RIC? COMPLIANCE WI?H iHE
ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL AN�
RECOMMEN�ATIONS AN� REQUIREMENTS CONTAWED IN THESE DRAWINGS,
UNLE55 SPECIFlED OiHERWISE.
5) ALL DIMENSIONS SHOWN ARE FROM FINISHED Sl1RFACES 11NLE55
SPECIFlED OTHERWISE.
6) iH15 DRAWING DOES NOi PROVI�E RADIAtION SMELDING
REpUIREMENTS FOR %-RAY AND ASSOCIATED Epl11PMENT. THE Cl15TOMER
IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION
PHYSICI4. ACtUAL PROiECtION REpUIREMENiS SHALL BE SPECIFlE� BY
A REGISTERED RADIATION PHVSICIST AT Cl15TOMER'S ENGAGEMENT AND
E%PENSE. RESPONSIBILIiV FOR ALL WFORMATION AS TO THE ROOM
LOCATION, USE, AND NUMBER OF ANTIQPATED EXAMINATIONS TO BE
PERFORMED PER TIME PERIOD SHALL BE PROVI�ED TO THE PHVSICIST
BY THE CUSTOMER. THE CUSTOMER SHALL FURTHER TAKE ALL
RESPONSIBILIiV IN THE COMMUNICATION AND COORDINATION OF
ACTIVITIES OF THE RA�IATION PHVSICIST AND THE ARCHITECTl1RAL
REPRESENTATNE.
�) SIEMENS HEALTHCARE SHALL BE RESPONSIBLE FOR SIEMENS
EQIIIPMENi INSiALLA?ION, CALIBRAiION, CONNECiION AN� INSiALLAiION
OF SIEMENS PROVIDED CABLES THE CUSTOMER/ELECTRICAL CONTRACTOR
IS RESPONSIBLE POR TERMINATIONS OF CUSTOMER/ELECTRICAL
CON?RACiOR-Sl1PPLIE� CA6LES i0 SIEMENS E�IIIPMENi. IN iHE EVENi
THAT SPECIFIC TRADE RULES OR LICENSE REOUIREMENTS PROHIBIT THIS,
THE CUSTOMER SHALL INITIATE THE SERVICES OP APPROVE� OTHER
CONiRACiORS AN� PAV FOR SELECiE�, APPROVE� PARilES i0 PERFORM
THIS WORK WITH SUPERVISION PROVIDED BV SIEMENS. CALIBRATION
WHEN ACCOMPLISHED OUTSI�E OF NORMAL WSTALUTION SEOVENCES
�llE r0 CONiRACiOR OR ?RA�E Rl1LE ACilONS OR REOUIREMENiS
SHALL BE SUPPORTED BV, CHARGED T0, AND ACCEPTED BY THE
CUSTOMER AS AN AD�RIONAL INSTALLATION EXPENSE.
8) iHE CUSiOMER SHALL COORDINAtE WRH 9EMEN5 PROJECt MANAGER
THE LOCATIONS AND TRAVEL OF ALL ANQLURY EpUIPMENT TO BE
CEILING OR WALL MOUMED Q.E: O.R LIGHTS, MEDICAL GAS COWMNS,
PHYSIOLOGICAL MONIiORING INJECtORS, CRt PLAiFORMS. SPRINKLER
HEADS, SMOKE DEfECTORS, ELECTRICAL OUTLETS. HVAC GRILLES,
SPEAKERS, AN� GENERAL ROOM LIGHTING, ETC.).
9) THE GENERAL CONTRACTOR/CUSTOMEft SHALL BE RESPONSIBLE FOR
ALL FlNAL PAINT, TOl1CH-l1P AND ANY COSMETIC OR TRIM WORK WHICH
NEEDS TO BE OR IS REQUIRED TO BE COMPLEiED AFiER THE
INSTALLATION OF THE SIEMENS EQUIPMENT AND ANV ASSOCIATED
Sl1PPORT APPARATl15.
10) CUSTOMER/CONTRACTOR MUST ASSIST 9EMENS INSTALLERS WITH
INSTALLATION OF EpUIPMENT ABOVE 14'-0". REFER TO THE ELECTRICAL
NOiES ON SIEMENS SHEEf E-101 FOR MORE �EfAILS.
ENVIRONMENTAL CONDITIONS
FOR TRANSPORT/STORAGE
TEMPERATURE RANGE -4' F TO 158' F
REWTIVE Hl1MI�ItY: 20% i0 95% WIiHOIIi CON�ENSAiION
AIR PRESSURE: ]00 hPa TO 1060 hPa
TRANSPORTING REQUIREMENTS
URGEST CRATE WITH PACKING:
103.8"(L) x 48.5(D) x BL5'(H), 2,590 LBS.
LARGEST IN�IVI�UAL PIECE WITH CARRIAGE (MIN. DOOR OPENING):
sa i/a"(�) , as i/z"(w) .�s'(H), z,00s �es.
cEwNc Rni�s nRE ia Fr.(�) x 3'(w) , a"(n)
MIN. CORRIDOR WIDTH: B2]"
RESOURCE LIST (SMS USE ONLY)
DESIGNATION PG NUMBER DAT
ARTIS 0/ O.ZEN CEILING AXAO-060.891.01.01.02 04.1
-4'��JE I�' II I I I ....
' SIEMENS
I VI
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREEf, CARMEL,^ IN. 46032
�ii� .,i ��<�.:� ui.,r .�i
TIIl � SI ./dl�. ,r I:;_
� FY=Ni G -- — :".ql
�,�,
�)� �,ic� :i� � iii ��,;,.
ALL RIGHiS ARE RESERVED.
SCALE REF.
ns NorEo bzz�r,
PROJECT #:
1902084
SHEET OF DRAWN BY:
1 8 M. GONZALEZ
DATE: Ofi/OS/19
SHEET:
A11�
0