Loading...
HomeMy WebLinkAboutSIEMENS - A-101SINKS, COUNTERTOPS AN� ALL CASEWORK SHOWN IS SUGGESTE� AND MUST BE DESIGNED SUPPLIED AND INSiALLED BY CUStOMER/WNiRACiOR. THESE MONITORS ARE TO BE MOUMED ON iHE CUSTOMERS OEM BOOM. � l z9 C—ARM PARK POSRION IT IS THE RESPONSIBILIIV OF THE CUSTOMEft/CONTftACTOR TO PROVIDE A MEANS OF MOUNiING iHE SYNGO X PC TOWER OFF OF FlNISHED FLOOR FOR �AMAGE PROTECTION AGAINST TIP—OVER, FWI�S, IMPACT, EiC. 26._g ��4.. 15_it I U I i PATIENT TABLE i Q MOVEMENt RANGE 8 30 � I � (HEAD-EN�) ,____I______ 31 /� . ' i / . . _, �, -�r �I h�� _ � � _� � 11 ��' ----- _ `������ 11 — � ::�I� �.i � I � '�� � � '-� l' � � ' �� � ��� A 0 IN CASE OF POWER FAIWRE, A UPS PROVI�ING iABLE MOVEMENT IS REpl11RED WHEN A TILTING/OR TABLE IS PURCHASED. IF NOT PURCHASED FROM SIEMENS, IT IS THE CUSTOMER'S RESPONSIBILIIY TO PROVI�E A UPS iHAt ALLOWS A iILTING/OR iABLE i0 BE MOVE� t0 A ZERO DEGREE POSITION �ESIGNATED FOR CPR WITHIN 15 SECONDS. THIS REpUIREMENT IS CONSISTENT WITH IEC 60601-2-4b CL 201.15.101. 6 iHE CUSiOMER OR SIEMENS-SUPPLIE� UPS SOWiION IS NOT INSTALLE� AN� OPERATIONAL AT THE TIME OF THE SIEAfENS OELNERV, 9EMEN5 CANNOT AN� WILL NOT INSTALL THE AFFECTED SIEMENS SVSTEM�. SUGGESTED 7-6" SpIIARE SHELF 4B" A.EE FOR MOUNTING COOLING UNIT ABOVE IMAGER. PROVIDE TRAV UNDERNEATH FOR LEAN PROTECTION WIiH 25 GALLON CAPACIiV. SHELF PROVIDED 6Y CUSTOMER/CONTRACTOR. .. 10'-4 1/B' � PATIENT TA6LE MOVEMENT RANGE � E4UIP. , ROOM aROPoseo z'-s" oeEa COUMER70P PROVIDED BY CUSiOMER/WNiRACiOR. � EXISiING SEN515 ORIENTATION POINT CONTROL oF annENr rne�E ROOM AT FLOOR THIS SEf OF FlNAL DRAWINGS IS REFLECTNE OF THE lATEST SALES CONFlGURAtION. ANY CHANGES i0 iHIS SALES CONFIGl1RATI0N MAV REQIIIRE A REVISION TO THIS PROJECT PLAN. IF REQUESTED, SIEMENS WILL PRODUCE A REVISED SEf OF FINAL DRAWINGS TO REFLECT THE CHANGES, HOWEVER SIEMENS IS NOT RESPONSIBLE FOR ANY CONSTRUCTION COSTS ASSOQATED WITH 7HE CHANGES iHAi OCCUR FROM iH15 PLAN MODIFlCAtION. 7_2 1� FlNISHED CEILINGJ � ARTIS ZEE CEILING C-ARM SY4EM �� �i / MOVEMENT��4 � t� , 1� i i��1 i � j �� �r� �W d \ p C o � ��K � �� FlNISHED FLOOR 5-6 � PATIENT TABLE REpUIRE� MINIMUM HEIGHT IN DROP CEILING FOR CORRUGATED HOSE HOL�ER AN� LAYING CABLES; FOR �ETAILS REGARDING THE CEILING OUTLEf SEE SHEET 5-102.� � ROOM HEIGHT MEASl1RED FROM THE HIGHEST POINT OF THE FlNISHED FLOOR (WCWDING FLOOR COVERING) TO THE LOWEST POIM OF THE CEILING SUBSTRUCTURE WITH TILTING TABLE THE "B10" FIXPOINT IS A �DCS LARGE THRU-FLOOR PENEfRATION �ISPLAV PROVI�ED AS A MEANS OP CONNECTING A TABLE INJECTOR OR OTHER NON-9EMENS ACCESSORIES AT THE TABLE FOR WHICH CABLE ROVIING iHROUGH iHE SIEMENS � TA6LE BASE WOULD BE PROHIBITED. THIS OPENING CAN BE ELIMINATE� AS REQUIRED, OR IT '� -� CAN BE COMBWE� IMO A � .� � CU40MER-Sl1PPLIE� GAS/UiILIiV BOX ON THE FLOOR. NOTE: THE 7-0" DISTANCE FROM TABLE ISOCEMER SHOWN HERE APPLIES \ ?O A CA6LE PENEiRAiION POINi % N Y. SEE DIAGRAM FOR POSSIBLE BOX PUCEMENT AND HEIGHT OPTIONS. VALIDATE E%ACT irv. PLACEMENT WITH SIEMENS PROJECT � I ARTIS Q/Q.ZEN/ZEE CEILING TYPICAL ELEVATION RELEASED FOR CONSTRl1CTI0N Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel Jj¢a� ��'`1�Vm,VN�nd. � � onrE: 11 /22/19 SCALP NONE NON-SIEMENS (OE DISPLAY BOOMS IMPORTANT SAFET' CRRERIA' FAIWRE TO MEEf THE FOLLOWING REQUIREMENiS MAV RESULi IN RISK OF INJURY i0 PAiIENiS, PERSONNEL OR DAMAGE TO TNE EQIIIPlAENT! 1) IT MUST BE POSSIBLE TO MANUALLY MOVE THE BOOM VERTICNLLV WITH A FORCE LE55 THAN 85 N(19 LBS) WHEN POSITIONING THE �ISPIAY BOOM OVER iHE PAiIENi. 2) TO AV01� THE RISK OF CRUSHING PERSONS OR �AMAGING EpUIPMENT IN iHE EVENi iHAi iHE ANGIOGRAPHY SYSiEM COMES INiO WNiACi WIiH THE OiSPLnV BOOM. IT MUST BE POSSIBLE TO PUSH THE BOOM AWAY iN A HORIZONTAL �IRECTION WRH A FORCE LE55 THAN 50 N(11 LBS). 3) lAOTORRED, HEIGNT—A�JUSTABLE DISPLAY B00lAS WHICH CANNOT MANUALLV BE PUSHE� AWAV MAY NOT BE USE�. DELNERY AN� INSTALLATION� IT IS RECOAIlAENOED THAT INSTALLATION OF 3RD PARiY �ISPIAV BOOMS 6E COOR�INATE� WITH THE INSTALLATION OF THE SIEMENS SYSTEAI. IN OR�ER i0 ENSURE iHE SIMULiANEOUS INSiALIAiION OF iHE SVSiEM AND iHE DISPLAY BOOM, THE CUSTOMER SHOUL� TAHE STEPS EARLY IN THE PLhNNING PROCESS TO ENSURE THAT THE BOOM MANUFACTURER'S LEA� TIME CAN BE COORDINNTED WITH THE DELNERY OF THE SIEMENS EQUIPAfENT. THE THIRD—PARN AIANUFACTIIRER IS RESPONSIBLE FOR THE INS1ALLAilON, MAINIENANCE, AN� SERVIGE OF THE �ISPUV BOOM(5J. 1HE THiRD—PARiY MANUFACTURER IS RESPONSIBLE FOR INSTALLiNG THE SIEMENS COAIPONENTS IN THE �ISPIAY BOOM IN ACCOROANCE WRH SIEMENS SPEQFICATIONS. SIEMENS ASSUMES NO RESPONSIBILIT' FOR ANY DAMAGE TO SIEMENS COMPONENTS WHICH ARE NOT iNSTALLE� iN ACCOR�ANCE WITH SIEAIENS SPECIRCATIONS. SIEMENS TECHNICIANS A1UST BE GIVEN INSiRUCiIONS AND/OR iRAINING AS APPROPRIATE BV THE 3RD PARtt AfANl1FACTURER FOR MAINTENANCE/SERVICE OF THE SIEMENS COMPONEMS (LE. �ISPIAY, CABLES), OR A TECHNICIAN FROM THE THiRD—PNRiV MANUFACTURER MUST BE PRESENT WHENEVER NNV SERVICE WORK IS PERFORAIED. STATE AGENCY REVIEW PRIOR TO SIEMENS EOUIPMENT INSTALLATION, APPROVAL OF CONSTRUCTION OR STRUCTURAL MODIFlCATIONS UTILRING %-RAV FOR DIAGNOSiIC OR iHERAPEUiIC PURPOSES, MUSi BE OBiAINED BY iHE Cl1Si0MER FROM iHE APPROPRIA?E SiA?E AGENCV, IF APPLICABLE. CE�L�NG HEIGHT REQUIREMENT 8 Ff. — 11 IN. NTION: ������,� �������� ,,,'`��, � ���� «. ��� �,� ���� �� .,�� � �� �� �� ,:�, � ������� ���� ����`'�'�, �;� �,���� �� � � ��� � � � � � �,� � � u i i e i. � i i_ r �r v � i r [ r i, r� i i ra n i r r r r �.n u u- rra r r- , r�. Ci � VAS C CC Ili . til/V i H� GHAL IC �ti01D �c fE �F5Fi1�. u YC r F.CI< L J P4�i .. o9/OB/19 RE�acATE IMACER ANo COOLING UNIT oa/1a/1s REvisEo FiNn� aER 11PDATED SALES ORDER os os � y A-ioie(q w+soN om[o os�zz/i9 // nrPeovEo ar cusrauw roe nru�s IAr\li �Hi.YN:iIJIPPI —ISSUE BLOCK— o/am��a[ cwic REV. 21 ARCHITECTURAL NOTES 1) ALL PRELIMINARV EpUIPMENT UYOUTS SUBMITTED BV SIEMENS HEALTHCARE ARE BASED ON THE RECOMMENDE� SPACE NECESSARY FOR iHE OPERAiION AN� SERVICEABILIiV OF iHE EOUIPMENi BEING PROPOSED. 9EMENS WILL NOT SUBMIT AN EpUIPMENT UVOUT THAT IS NOT IN THE BEST IMEREST OF BOTH THE CUSTOMEft AND SIEMENS. ALL EOUIPMENi LAVOUiS ARE BASE� EIiHER ON AN AC?IIAL SIiE SURVEV OR ARCHRECTURAL �RAWINGS SUPPLIED TO 9EMEN5. SIEMENS WILL NOT BE RESPONSIBLE FOR ANY ALTERATIONS THAT ENCROACH WIIHIN �ESIGNAIE� SAFEfV AN� SERVICE CLEARANCE ZONES AS INDICATED ON DRAWINGS (I.E.. PIPE CHASES, VENTILATION DUCTS, CASEWORK, AND SOFFlTS, EfC.) MA�E BY THE WSTOMER OR REOUIRED BV A CU40MER'S ARCHIiECiURAL FIRM ONCE PRELIMINARY DRAWINGS HAVE BEEN SUBMITfED AND APPROVED. DO NOT ALTER ANV SPECIFlCATIONS AND/OR �IMENSIONS WITHOUT CONTAC➢NG AN� RECEIVING WRITfEN CONFIRMAtION FROM SIEMENS PROJECi MANAGER. 2) SIEMENS HEALTHCARE IS NOT AN ARCHITECTURAL OR ENGINEERING FIRM. DRAWINGS SUPPLIED BY SIEMENS ARE NOT CONSTRUCTION DRAWINGS. THEREFORE, THESE DRAWINGS ARE TO BE USED ONLY FOR INFORMATION TO COMPLEMENT ACTUAL CONSTRUCTION DRAWINGS AVAIUBLE FROM A CUSTOMER APPOWTED ARCHITECTURAL REPRESENTATNE OR A CUSTOMER'S ENGINEERING DESIGN GROUP. THE CUSTOMER'S ARCHITECT AND GENERAL CONTRACTOR SHALL BE ULTIMATELV RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE CO�ES AND PROFESSIONAL �ESIGN REQUIREMENTS INCLUDING OSHA/NEC SAFET' CLEARANCE REOUIREMENiS IN A��IiION i0 9EMEN5-REOl11RE� SAFEIY/SERVICE CLEARANCES SHOWN. 3) THE CUSTOMER IS RESPONSIBLE FOR ALL ROOM AND AREA PREPARAiION WSiS, PROFESSIONAL FEES, PERMIiS, REPORiS, AN� INSPECTION FEES. 4) EOUIPMENT WARRANTIES, EXPRESSE� OR IMPLIED ON THE PART OF SIEMENS SHALL 9E CONiINGENi 11PON 4RIC? COMPLIANCE WI?H iHE ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL AN� RECOMMEN�ATIONS AN� REQUIREMENTS CONTAWED IN THESE DRAWINGS, UNLE55 SPECIFlED OiHERWISE. 5) ALL DIMENSIONS SHOWN ARE FROM FINISHED Sl1RFACES 11NLE55 SPECIFlED OTHERWISE. 6) iH15 DRAWING DOES NOi PROVI�E RADIAtION SMELDING REpUIREMENTS FOR %-RAY AND ASSOCIATED Epl11PMENT. THE Cl15TOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION PHYSICI4. ACtUAL PROiECtION REpUIREMENiS SHALL BE SPECIFlE� BY A REGISTERED RADIATION PHVSICIST AT Cl15TOMER'S ENGAGEMENT AND E%PENSE. RESPONSIBILIiV FOR ALL WFORMATION AS TO THE ROOM LOCATION, USE, AND NUMBER OF ANTIQPATED EXAMINATIONS TO BE PERFORMED PER TIME PERIOD SHALL BE PROVI�ED TO THE PHVSICIST BY THE CUSTOMER. THE CUSTOMER SHALL FURTHER TAKE ALL RESPONSIBILIiV IN THE COMMUNICATION AND COORDINATION OF ACTIVITIES OF THE RA�IATION PHVSICIST AND THE ARCHITECTl1RAL REPRESENTATNE. �) SIEMENS HEALTHCARE SHALL BE RESPONSIBLE FOR SIEMENS EQIIIPMENi INSiALLA?ION, CALIBRAiION, CONNECiION AN� INSiALLAiION OF SIEMENS PROVIDED CABLES THE CUSTOMER/ELECTRICAL CONTRACTOR IS RESPONSIBLE POR TERMINATIONS OF CUSTOMER/ELECTRICAL CON?RACiOR-Sl1PPLIE� CA6LES i0 SIEMENS E�IIIPMENi. IN iHE EVENi THAT SPECIFIC TRADE RULES OR LICENSE REOUIREMENTS PROHIBIT THIS, THE CUSTOMER SHALL INITIATE THE SERVICES OP APPROVE� OTHER CONiRACiORS AN� PAV FOR SELECiE�, APPROVE� PARilES i0 PERFORM THIS WORK WITH SUPERVISION PROVIDED BV SIEMENS. CALIBRATION WHEN ACCOMPLISHED OUTSI�E OF NORMAL WSTALUTION SEOVENCES �llE r0 CONiRACiOR OR ?RA�E Rl1LE ACilONS OR REOUIREMENiS SHALL BE SUPPORTED BV, CHARGED T0, AND ACCEPTED BY THE CUSTOMER AS AN AD�RIONAL INSTALLATION EXPENSE. 8) iHE CUSiOMER SHALL COORDINAtE WRH 9EMEN5 PROJECt MANAGER THE LOCATIONS AND TRAVEL OF ALL ANQLURY EpUIPMENT TO BE CEILING OR WALL MOUMED Q.E: O.R LIGHTS, MEDICAL GAS COWMNS, PHYSIOLOGICAL MONIiORING INJECtORS, CRt PLAiFORMS. SPRINKLER HEADS, SMOKE DEfECTORS, ELECTRICAL OUTLETS. HVAC GRILLES, SPEAKERS, AN� GENERAL ROOM LIGHTING, ETC.). 9) THE GENERAL CONTRACTOR/CUSTOMEft SHALL BE RESPONSIBLE FOR ALL FlNAL PAINT, TOl1CH-l1P AND ANY COSMETIC OR TRIM WORK WHICH NEEDS TO BE OR IS REQUIRED TO BE COMPLEiED AFiER THE INSTALLATION OF THE SIEMENS EQUIPMENT AND ANV ASSOCIATED Sl1PPORT APPARATl15. 10) CUSTOMER/CONTRACTOR MUST ASSIST 9EMENS INSTALLERS WITH INSTALLATION OF EpUIPMENT ABOVE 14'-0". REFER TO THE ELECTRICAL NOiES ON SIEMENS SHEEf E-101 FOR MORE �EfAILS. ENVIRONMENTAL CONDITIONS FOR TRANSPORT/STORAGE TEMPERATURE RANGE -4' F TO 158' F REWTIVE Hl1MI�ItY: 20% i0 95% WIiHOIIi CON�ENSAiION AIR PRESSURE: ]00 hPa TO 1060 hPa TRANSPORTING REQUIREMENTS URGEST CRATE WITH PACKING: 103.8"(L) x 48.5(D) x BL5'(H), 2,590 LBS. LARGEST IN�IVI�UAL PIECE WITH CARRIAGE (MIN. DOOR OPENING): sa i/a"(�) , as i/z"(w) .�s'(H), z,00s �es. cEwNc Rni�s nRE ia Fr.(�) x 3'(w) , a"(n) MIN. CORRIDOR WIDTH: B2]" RESOURCE LIST (SMS USE ONLY) DESIGNATION PG NUMBER DAT ARTIS 0/ O.ZEN CEILING AXAO-060.891.01.01.02 04.1 -4'��JE I�' II I I I .... ' SIEMENS I VI IU HEALTH NORTH HOSPITAL 11700 NORTH MERIDIAN STREEf, CARMEL,^ IN. 46032 �ii� .,i ��<�.:� ui.,r .�i TIIl � SI ./dl�. ,r I:;_ � FY=Ni G -- — :".ql �,�, �)� �,ic� :i� � iii ��,;,. ALL RIGHiS ARE RESERVED. SCALE REF. ns NorEo bzz�r, PROJECT #: 1902084 SHEET OF DRAWN BY: 1 8 M. GONZALEZ DATE: Ofi/OS/19 SHEET: A11� 0