Loading...
HomeMy WebLinkAboutCOP 003 - SewerPermit Type Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons SANITARY SEWER PERMIT Final Subdivision 2018-1375 Section Number Copper Run Lot Number Pulte Homes of Indiana, LLC Address Number 14 Austin Oaks Station Address 2 CTRWD WWTP Street 0.28 City 310 Zip Code County Local Sewer Charge - District Contrlbution Plan Review and Inspection Appllcation Fee EDU Fee Interceptor Fee OtherFees Fees Due Invoice Number 0.00 Builder 0.00 150.00 Phone Number 1 so8.00 Owner 0.00 phone Number 0.00 2058.00 Occupant Phone Number 999913481 Copper Run 3 12974 Chenille Drive Carmel 46074 Hamilton Pulte Group 317-575-2350 PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (properly owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Grease Trap Grease Interceptor Grit Interceptor Grinder Station YES Water Service Maln ID: Manhole IDs USMH YES � Lid Elevation Flrst Floor Elevation Carmel Utilities � Basement Elevation CR-ZONE5 DSMH Calculation Is based on both Manhole Lid FJevations and the elevaUon of the First Floor 0.00 0.00 Ft. Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Low Pressure System �TriCo currentiy requires that an I&I inspection is pertormed and a Certificate of Compliance is issued prior to occupancy / sale of a properrty. Please review attached I/I Permit. Manholes shall remain accessible at all times. Buried manholes will be coRected by the DevelopeNOwner. �The proper class of cleanout must be installed every 100 feet of lateral pipe measured ftom sewe� main to structure. The terms ot the coaditlonal permlt, If any, are Ilsted below. Plans have been submitted. All fees have been paid. No ce�tificate of insurance required. No additional permits required. No manhole core permit required. The facility is not classified as a FOG facility. (Notes) By signing below, I attest that I am familiar wi the DistricYs speciflcatlons and agree to accept responsibilfty for all work done under this pertnit. Builder / Owner Signature Phone Number �" �v G Printed Name j C��S ��`� �'�` �r,��� Appro�ed By � � � � � � � Rya� He • sbict r N � Permit is valid fo ONE- EAR from the date issued. Permit valid only with TriCo ' I n r d i " ; � o� �o ? Slab Foundation Crawl Space Basement 'yp �O �q P �,P �9 e���E - M1fM��t�N. 10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco