HomeMy WebLinkAboutCOP 003 - SewerPermit Type
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
SANITARY SEWER PERMIT
Final Subdivision
2018-1375 Section Number
Copper Run Lot Number
Pulte Homes of Indiana, LLC Address Number
14 Austin Oaks Station Address 2
CTRWD WWTP Street
0.28 City
310 Zip Code
County
Local Sewer Charge - District Contrlbution
Plan Review and Inspection
Appllcation Fee
EDU Fee
Interceptor Fee
OtherFees
Fees Due
Invoice Number
0.00 Builder
0.00
150.00 Phone Number
1 so8.00 Owner
0.00 phone Number
0.00
2058.00 Occupant
Phone Number
999913481
Copper Run
3
12974
Chenille Drive
Carmel
46074
Hamilton
Pulte Group
317-575-2350
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (properly owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Grease Trap
Grease Interceptor
Grit Interceptor
Grinder Station YES
Water Service
Maln ID:
Manhole IDs USMH
YES � Lid Elevation
Flrst Floor Elevation
Carmel Utilities � Basement Elevation
CR-ZONE5
DSMH
Calculation Is based on both Manhole Lid FJevations and the elevaUon of the First Floor 0.00
0.00 Ft.
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Low Pressure System
�TriCo currentiy requires that an I&I inspection is pertormed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached I/I Permit.
Manholes shall remain accessible at all times. Buried manholes will be coRected by the DevelopeNOwner.
�The proper class of cleanout must be installed every 100 feet of lateral pipe measured ftom sewe� main to structure.
The terms ot the coaditlonal permlt, If any, are Ilsted below.
Plans have been submitted.
All fees have been paid.
No ce�tificate of insurance required.
No additional permits required.
No manhole core permit required.
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am familiar wi the DistricYs speciflcatlons and agree to accept responsibilfty for all work done under this pertnit.
Builder / Owner Signature Phone Number �" �v
G
Printed Name j C��S ��`� �'�` �r,���
Appro�ed By � � � � � � �
Rya� He • sbict r N �
Permit is valid fo ONE- EAR from the date issued. Permit valid only with TriCo ' I n r d i " ;
�
o� �o
?
Slab Foundation
Crawl Space
Basement
'yp �O
�q P
�,P
�9 e���E - M1fM��t�N.
10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco