HomeMy WebLinkAboutA-101fH15 SEf OF FlNAL �RAWINGS IS RERECTIVE OP THE LATEST SALES CONFlGURATION. ANY CHANGES TO THIS SALES
:ONFIGURATION MAY REOUIRE A REVISION TO THIS PROJECT PLAN. IF REOUESTEO, SIEMENS WILL PRO�l10E A
iEVISED SET OF FINAL �RAWINGS TO REFLECT THE CHANGES, HOWEVER SIEMENS IS NOT RESPONSIBLE FOR ANV
;ONSTRUCTION COSTS ASSOCIATE� WITH THE CHANGES THAT OCCUR FROM THIS PLAN MODIFlCATION.
24 -6"
g._g.
8'-2
I
2'-10 1/2",
CHILLER i0 BE SUPPLIED, LOCAiED AND
IN4ALLE� BV CU40MER/WMRACiOR.
REFER TO MANUFACTURER'S INFORMATION.
iHERE SHALL BE A SEPARAtE RF ROOM
PENETRATION PANEL FOR NON-SIEMENS
EQUIPMENT. THE OUTSI�E EQUIPMENT
MANUFACTURER (OEM) WILL SPECIFY ANV
AND ALL FlLtER AND PENEfRAiION
REO�IREMENiS.
[WbTI
0.1mT
/ 0.1
J C�NTR�� �
/
� ROOM
J
\ Z�
IT IS THE RESPONSIBILIiV OF THE CUSTOMER/
CONTRACTOR TO PROVI�E A MEANS OF MOUNTING
THE PC TOWER OFF OF THE FlNISHED PLOOR FOR
DAMAGE PR07ECilON AGAIN57 iIP OVER, FLUIDS,
IMPACT, EfC. ADDITIONAL MOUNTING IS NOT
NECESSARY IF SIEMENS CONTAWER IS UTILRED.—
ODSmT � �
/ 0.1m7
0.15mT � _
0.3mT
O.Smi
1mt -�
3m7 EXAM
!�� ROOM
% , #B134A �'��,
i -_, �
`� �'��i AERA
,
. ,
��, ;
��_ ,
��� �
�J
i
ISOCENTER i
OF MAGNET
ARCHITECTURAL EQUIPMENT PLAN
MAGNET CO-SITING
MINIMUM DISTANCE MAGNET-MAGNEf (SIEMENS)
SCALE 1/4"" = 1
STATE AGENCY REVIEW
PRIOR TO 9EMEN5 EpUIPMEM INSTALUTION, APPROVAL OF
CONSTRUCTION OR STRl1CTl1RAL MODIFICATIONS FOR DIAGNOSTIC OR
iHERAPEUtIC PURPOSES. MUSt BE OBiAWED BY 7HE CUSiOMER
FROM THE APPROPRIATE STATE AGENCV, IF APPLICABLE.
02? 0.35i 1.0? 1.Si 3.Oi
�2i 32•_9•• 32•_9• �6•_5•• �9•_9•• 32•_9••
�.351 37-9" 32�_9" �6•_5•• �9�_9" 3Z�_9•
1.Oi 16• 5" 16• 5• 14'-10" 16• 5" 19• 9"
LSi 19'-9' 19• 9•• tfi• 5• 16• 5" 19• 9•
3.01 37 9•• 37 9•• 19• 9•• 19• 9•• 19• 9"
\
—\
/
EQUIPMENT
ROOM
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
�sv�� �\o�v�N�nA wl
�
onrE: 12/02/19
DO NOT RAMP ONE MAGNEf WMLE THE OTHER IS RUNNING
APPLICATIONS. SHIM IS ONLV OPTIMIZE� WHEN BOTH MAGNETS
ARE RAMPED UP �URING THE SHIMMING PROCE�URE.
WHEN CO-SIiING AN MR SYSiEM WIiH A MAGNEfIC NAVIGAiION
SYSTEM THE MINIMUM DISTANCE FOR CLINICAL IMAGING IS 98'-6",
FOR SPECTROSCOPY THE MINIMUM SEPARATION IS 121'-5".
[S
RF SHIELDING TO BE
PROVIDED BV RF
SMELDING VEN�OR.
- THE O.SmT FlELD SHOl1LD BE RESTRICTE�
FROM INDIVIDUALS WITH PACEMAKERS AND
INSULIN PUMPS. IT IS NECESSARY TO DISPLAY
WARNING SIGNS AN� RE4RICi ACCE55 IN
ACCORDANCE WITH LOCAL REGULATIONS.
IF A CLOSEf IS DESIRED TO CONCEAL THE
FlLTER PUTE AND CABLE CONNECTIONS, IT
IS TO BE �ESIGNE� AN� SPEQFlED AN�
PROVIDED BV THE CUSTOMER OR THEIR
REPRESENiAiNE A 30 1/4" CLEARANCE IS
�
REQUIRED FOR SERVICE AND CABLING.
�
n
�
i � .
\
� I �
�
i
NOISE LEVELS
SYSTEM ROOM NOISE LEVEL d8 A
CONTROL ROOM <55
XO GRADIENTS
EXAMINATION ROOM g�.4 dB(A) - B HOUR AVERAGE
1029 dB(A) MAXIMl1M, MEASl1RED
INSIDE THE E%AM ROOM.
EpUIPMENT ROOM <65
NOISE LEVELS ARE BASE� ON AN AVERAGE MEASUREMENT OVER 8
HOURS OF CLINICAL SCANNING. PEAK LEVELS MAY BE HIGHER FOR
CERiAIN SEWENCES.
R IS THE CUSTOMER'S RESPONSIBILITY TO ENSURE THAT ALL LOCAL/
STATE/OSHA N06E REGUUTIONS ARE ADHERE� T0. ADDITIONAL NOISE
DAiA MAV BE PROVI�ED BY 9EMEN5 PROJECi MANAGER UPON REWESi.
EQUIPMENT LEGEND
NO DESCRIPTION SMS WEIGHT BTU/HR DIMENSIONS (INCHES) REMARKS
SYM (LBS) TO AIR W D H
1 MRC KEYBOAR� Q 5 -- 2J 1/4 10 1/8 1 3/4 ON CUSTOAfER'S COl1MER
2 COLOR MONIiOR FOR MRC Q 22 239 18 5/16 16 15/16 4 3/4 ON CUSiOMER'S COUNiER
O3 HOST PC IARC � 49 2,39� 11 2J 18 1/8 BELOW COIIMER TOP
4 AURM BOX Q 2 --- 9 4 9 WALL MOUNTE�
5 VI�A AIAGNET IN OPERATION QB 1fi,204 9,b8J 96 1/2 80 5/8 89
fi PA11EN1 1A9LE (MOBILE) Q 529 -- 29 1/2 9� 1/4 21-41
� RFFlLTER PLATE (HORIZONTAL) R 28J 853 46 1/2 35 1/8 21 5/8 WALL MOONTED
8 ELECiRONICS CABMEf (GPA/EPC CABINEf) � 3,30� G3,412 61 1/2 26 JJ 1/2
9 SEP CA6MET � J01 <3,412 25 5/8 25 5/8 J3 5/8
�4 MRXPERION INJECiOR SiAN� AN� HEA� (OPiION) � 9< -- 23 3/8 28 3/8 J1 J/8 INJECiOR ON SiAN�
�� AIRXPERION iC6C INJECTOR CRII (OPTION) � 1].6 -- 15 3/4 10 1/4 13 1/2 ON WSTOAfER'S COl1NTER
�1 MRXPERION iCBC INJECiOR POWER SUPPLY (OPiION) � 6 --- 15 3/9 3 3/9 15 1/2 LOCAiE� M EXAM ROOM
OUTSIDE SmT FlELD
'ROTECTING THE MAGNETIC FIELI
iHE SIEMENS MR SYSiEM UiILIZES A SUPERCONDUCiNE MAGNEf WIiH AN
EXTREMELV HOMOGENOUS RELD WRHIN THE MAGNET TO PROViDE OiSTORTiON
FREE IMAGING. THE PRESENCE OF FERROMAGNEfIC MATERIAL WRHW THE
VICINIIY OF iHE MAGNEf CAN ADVERSELY AFFECi iHE UNIFORMIiV OF iHE
USEFUL MAGNETIC RELD. THIS APPLIES TO STATIONARV FERROUS MATERIAL
(STRUCTURAL STEEL) WHICH IS TO BE MINIMRE�. STATIONARY 4EEL
COMPENSAiION MAY BE ACHIEVE� BY MAGNEf POSIiIONING AN� SELECiNE
USE OF SHIlAS. DISTORTION CAUSED BY IAOVING FERROAIAGNEfIC OBJECTS
(MOTOR VEHICLES, ELEVATORS) IS MORE DIFRCULT TO COMPENSATE AN�
MAV REQUIRE THE USE OP MAGNEfIC SHIELDING. p� �
EXAM ROOM LIGHTING
THE MAGNEfIC FlEL� A�VERSELY AFFECTS THE OPERATING LIFE OF LIGM
BULBS LOCAiE� IN iHE IMME�IAiE VIQNItV OF iHE MAGNEf. iHE FlIAMENi
IN THE BULBS OSqLLATES WITH THE FREOUENCY OF THE POWER SUPPLY.
LIGHTS IN THE VICINIIY OF THE MAGNEf CONNECTE� TO A �C POWER
SUPPLV CAN RE�UCE iH15 EFFECi. RESI�UAL OC RIPPLE SHOULO 9E
LE55 THAN 5%. R� 2
CEILING HEIGHTS
MAGNEf EXAMINATION ROOM: 7�-� ��� MINIMUM
EouiPMENt RooM: 7'-3" MINIMUM
au nNa�uRr arz�.s: 6'-11" MINIMUM
N T I O N. �� � � ��� �, � ���� � � �,�� ��� :. � �� � ��. � �� � �� � �� � �� � �� ,� � � � ��, � �� �� �,�� ��� , �"' '��,��� ��, � � �
� � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ���� ���
r. i ui i i �- rF r r, i F i F i ini, u i� FF F m � i �� u F i v m mi i� eF�- F , i:n
��� �� � � �s �� � ��� _�,�N��� �� � ��,��, ��� � �� .�� -� N..��, ��- � � � � N„�� ����� � , N��� �����
3 � �
[-sm
/ J
I � 2
�
10
/ �I ;>
0.3mT . � � —
ISOCENTER
OF MAGNEf - --
O.SmT
1mT 5
I 3mr VIDA �
I I
I 1 EXAM
ROOM /
� 6 #8132 �
_ � � �
PROTECTING THE ENVIRONMENT
PROTECTING THE IMMEDIATE ENVIRONMENT FROM THE EFFECT OF THE
MAGNEiIC FlEL� REpUIRES CONSI�ERATION. WPORMATION STORE� ON
MAGNEfIC DATA CARRIERS SUCH AS �ISCS, TAPES AN� CAR�S MAY BE
ERASE� IF NEAR iHE MAGNEf. CAUTION WIiH REGARD i0 HEAR?
PACEMAKERS MUST BE EXERCISED. MOST PACEMAKER 11NIT5 EMPLOV A
REED RELAV WHICH MAV CHANGE OPERATING MODE WHEN E%POSED TO
AN EXTERNAL MAGNEfIC FlEL�. PACEMAKER USERS MUST BE KEPT AT
A SPECIFlE� DISiANCE FROM iHE MAGNEf WHICH IS DEfERMWED BY
THE MAGNEf FIELO STRENGTH. ,,,,, ,
MAGNETIC FRINGE FIELDS
MAGNETIC FlELDS MAY AFFECT THE FUNCTION OF DEVICES IN THE
VICINIIY OF iHE MAGNEf. iHESE DEVICES MUSi BE OUiSIDE CERiAIN
MAGNErIC FlEL�S. 1HE �I4ANCE5 LI4E� ARE FROM 1HE MAGNEr
ISOCENTER AND DO NOT CONSIDER ANY MAGNETIC ROOM SHIELDING.
FlELD X& Y Z AXIS DEVICES
3.OmT ]'-7' 10'-B" SMALL MOTORS, WATCHES, CAMERAS, CREDIT
cnRos, MncNEric ontn caRaiEas.
1.OmT 8'-1" 13'-4" COMPUTERS, MAGNEiIC DISK DRNES,
OSCILLOSCOPES, PROCESSORS
O.Smt e'-7' 15-7' CARDIAC PACEMAKERS, %-RAY TUBES,
INSl1LIN PUMPS, B/W MONIiORS, MAGNEfIC
DATA CARRIERS (LONG-TERM STORAGE)
02mT 10'-3" 18'-9" 9EMEN5 Ci SCANNERS
0.15mi 11'-0" 20'-1" CRT MONITORS, 9EMEN5 LWEAR
ACCELERATORS
ODSmt 15-9" 26'-]" %-RAY IMAGE IMENSIFlERS, GAMMA
CAMERAS, PEf/CVCLOTRON, ELECTRON
MICROSCOPES, LINEAR ACCELERAi0R5
THE OWNER/USER IS TO VERIFY THE LOCATION OF THE O.SmT FIELD
AN� ENSURE THAT R IS MAIMAINE� AS A RESTRICTED AREA.
MAGNETIC FIELD WARNING
PLEASE BE AWARE THAT DURING THE CALIBRATION PHASE OF THE
MRI INSTALLATION, THE MAGNEf WILL BE AT FULL FlELD STRENGTH
AND ALL NECESSARV PRECAVilONS WHEN WORKING IN iHE VICINIT'
OF SiRONG MAGNEfIC FlEL�S Ml1Si BE TAKEN. WHEN iHE
CALIBRATION OF THE MAGNEf OVERUPS WITH FINAL CONSTRUCTION
ACTIVITIES, THERE IS THE POSSIBILItt OF THE IMRODUCTION OF
FERROUS MAGNEfIC OBJECTS BV WORKERS INTO THE MR ROOM. IT
IS iHE RESPONSIBILIiV OF ?HE CUSiOMER i0 ENSl1RE rHAi ALL
PRECAUTIONS ARE TAKEN TO ENSURE THAT THIS DOES NOT HAPPEN,
AS EQUIPMEM DAMAGE AND SERIOUS BODILY INJURY COULD OCCUR.
Q1 09�06�19 COMPLEfE NEW IAYOUT BPSED
ON lAlESi WALL BACKGROONOS
Qo oe/z�/is �sonaoru ontEo oa/s�/is
MPPOYE� Bf CU5704ER5 FOR FlW15
SVM DATE DESCRIPTION
—ISSUE BLOCK—
ARCHITECTURAL NOTES
1) ALL PRELIMINARV EQUIPMENT LAYOUTS SUBMITTED BV 9EMENS
MEDICAL SOLUTIONS, INF (SMS HEREAFTER) ARE BASED ON THE
RECOMMENDED SPACE NECESSARv FOR THE OPERATION AND
SERVICEABILIiV OF THE EpUIPMENT BEING PROPOSED. SMS WILL NOT
SUBMIT AN EOUIPMENT LAYOUT THAT IS NOT IN THE BEST INTERE4
OF BOTH THE CUSTOMER AND SMS. ALL E�UIPMENT LAVOl1T5 ARE
BASED ERHER ON AN ACTUAL SRE LOCATION SURVEY OR
ARCHITECTURAL DRAWWGS SUPPLIED TO SMS. SMS WILL NOT BE
RESPONSIBLE FOR ANY ALTERATIONS THAT ENCROACH WITHIN
DESIGNATED SAFEIV AND SERVICE CLEARANCE ZONES AS INDICATED
ON DRAWINGS QE PIPE CHASES, VENTILATION DUCTS, CASEWORK, AN�
SOFFliS, EfC.) MA�E BV iHE CUSiOMER OR RE�UIRE� 9Y A
CUSTOMER'S ARCHITECTl1RAL FIRM ONCE PRELIMINARY DRAWINGS HAVE
BEEN SUBMITfED AND APPROVE�. DO NOT ALTER ANV SPECIFlCATIONS
AN�/OR �IMENSIONS WI?HOU1 CON?AC11NG AN� RECENING WRIiiEN
CONFIRMATION FROM SMS PROJECT MANAGER.
2) SMS IS NOT AN ARCHRECTURAL OR ENGMEERING FIRM. DRAWINGS
Sl1PPLIE� BV SMS ARE NOi CONSiRUCiION ORAWINGS. iHEREFORE.
THESE �RAWINGS ARE TO BE USED ONLV FOR INFORMATION TO
COMPLEMENT ACTUAL CONSTRUCTION DRAWINGS AVAILABLE FROM A
CUSiOMER APPOIME� ARCHIiECil1RAL REPRESEN?AiIVE OR A
CUSTOMER'S ENGINEERING DESIGN GROUP. THE Cl15TOMER'S
ARCHITECT AND GENERAL CONTRACTOR SHALL BE ULTIMATELV
RESPONSIBLE FOR COMPLIANCE WIiH ALL APPLICABLE CO�ES AND
PROFESSIONAL DESIGN REOUIREMENTS.
3) THE CUSTOMER IS RESPONSIBLE FOR ALL ROOM AND AREA
PREPARATION COSTS, PROFESSIONAL FEES. PERMITS, REPORTS, AND
INSPECTION FEES.
4) EpUIPMENT WARRANTIES, EXPRESSE� OR IMPLIED ON THE PART OF
SMS SHALL BE CONTINGENT UPON STRICT COMPLIANCE WRH THE
ARCHI1EC1l1RAL, SiRl1C1URAL, ELECIRICAL, MECHANICAL AN�
RECOMMENDATIONS AND REQUIREMENTS CONTAWED IN THESE
DRAWINGS, UNLE55 SPECIFlED OTHERWISE.
5) ALL �IMENSIONS SHOWN ARE iAKEN FROM FlNISHE� SURFACES
UNLE55 SPECIFlED OTHERWISE.
6) THIS �RAWING DOES NOT PROVIDE RADIATION SMELDING
REQIIIREMEN?S FOR X-RAV AN� ASSOQAiE� EQIIIPMENi. iHE
CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED
RADIATION PHYSIQST. ACTUAL PROTECTION REOUIREMENTS SHALL BE
SPECIFlE� BV A REGISiERE� RA�IAiION PHYSICISi Ai Cl1Si0MER'S
ENGAGEMENT AND EXPENSE RESPONSIBILIN FOR ALL INFORMATION AS
TO THE ROOM LOCATION, USE, AND NUMBER OF ANTICIPATED
EXAMINA110N5 10 BE PERFORME� PER iIME PERIO� SHALL BE
PROVIDE� TO THE PHVSICIST BV THE CUSTOMER. THE CUSTOMER
SHALL FURTHER TAKE ALL RESPONSIBILIIV IN THE COMMUNICATION
AND COORDINAiION OF ACiIVItIES OF iHE RADIAtION PHYSIQ4 AND
THE ARCHITECTURAL REPRESENTATIVE.
]) SMS SHALL BE RESPONSIBLE FOR SMS EOUIPMENT INSTALLATION
AN� CALIBRAtION. CONNECiION AN� INSiALLA710N OF SMS PROVIDED
CABLES. THE CUSTOMER/ELECTRICAL CONTRACTOR IS RESPONSIBLE
FOR TERMINATIONS OP CUSTOMER/ELECTRICAL CONTRACTOR-SUPPLIED
CABLES TO SMS EOUIPMENL IN THE EVENT THAT SPEQFlC TRA�E
RULES OR LICENSE REOUIREMENTS PROHI6IT THIS, THE CuSTOMER
SHALL INITIATE THE SERVICES OF APPROVED OTHER CONTRACTORS
AND PAY FOR SELECTED, APPROVED PARTIES TO PERFORM THIS WORN
WITH JOB Sl1PERVI510N TO BE PROVI�ED BY SMS. CALIBRATION WHEN
ACCOMPLISHED OUTSIDE OF NORMAL INSTALUTION SEpUENCES DUE
TO COMRACTOR OR TRADE RULE ACTIONS OR REOUIREMENTS SHALL
BE SUPPORTE� 6Y, CHARGED T0, AND ACCEPTED BV THE CUSTOMER
AS AN ADDITIONAL WSTALLATION E%PENSE.
8) THE CUSTOMER SHALL VERIFY WITH SMS PROJECT MANAGER FINAL
INSiALLAiION �RAWINGS iHE LOCAiIONS AN� iRAVEL OF ALL
ANCILLARY EOUIPMENT TO BE CEILING OR WALL MOUNTED QE: O.R.
LIGHTS, MEDICAL GAS COWMNS, PHVSIOLOGICAL MONITORING
INJEC?ORS, CR1 PLAIFORMS, SPRINKLER HEA�S, SMOKE �EfEC10R5,
ELECTRICAL OUTLETS, HVAC GRILLES, SPEAKERS, AND GENERAL ROOM
LIGHTING, EfC.).
9) iHE GENERAL CONiRACiOR/C115?OMER SHALL BE RESPONSIBLE
FOR ALL FINAL PAINT, TOUCH-UP AND ANY COSMETIC OR TRIM WORK
WHICH NEEDS TO BE OR IS REQUIRE� TO BE COMPLEfE� ARER THE
INSiALLAiION OF iHE SMS EQUIPMENi AND ANY ASSOCIAiED SUPPORi
APPARATUS.
CONSTRUCTION REQUIREMENTS
iHE CUSiOMER/CONiRACiOR IS RESPONSIBLE FOR SUPPLVING AND
INSiALLING ALL CONSiRUCiION MA?ERIALS INCLU�ING ELECiRICAL AN�
MECHANICAL �EVICES REOUIRED BY SIEMENS SPEQFICATIONS AN� TO
ENSURE THAT THE MATERIAL USED INSI�E THE RFSHIELDING IS AS
FREE OF PERROMAGNEfIC PROPERTIES AS POSSIBLE STEEL WALL
Si11�5 ARE PERMITfE� BUi M115i BE SEWRE� PROPERLV.
ANY FERROl1S MATERIAL WSIDE THE E%AM ROOM MAV BECOME A
M159LE AND CAUSE INJURY TO PEOPLE AND DAMAGE TO EOUIPMENT.
FERROUS ITEMS INSIDE THE E%AM ROOM ARE THE LIABILITY OF THE
CONiRACiOR AN�/OR INSiALLER.
REV 2
:ASEWORK & ACCESSORY NOTE
1) ALL CASEWORK 6 EITHER EXISTING OR IS TO BE DESIGNED,
�ETAILED, FURNISHED AN� INSTALLE� BY THE Cl15TOMER AN�/OR
CONTRACTOR FOLLOW DESIGN RECOMMENDATIONS INCWDE�
HEREWITH, AS THEV ARE ESSENTIAL FOR THE SUCCESSFUL
INSiALLAiION & OPERAiION OP iME 9EMEN5 EWIPMENi.
2) ALL FURNRURE (CHAIRS, ETC.) FOR THE CONTROL ROOM ARE TO
BE PROVIDE� BY THE CUSTOMEft.
RESOURCE LIST (SMS USE ONLY)
DESIGNATION PG Nl1MBER DAT
PUNNING GUIDE Mit-030.891.01.O1D2 06.1
VIDA
REV 8
� ��i� .�ITf Ilu f�...G.=:
�� SIEMENS
PF � r I - c-F � -
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032
MRI ROM �JB132 - MAGNEfOM VI�A VIOA XQ GRADIENTS
IH4 F '�f :: i II - PR��ECT #: SFiEET:
-.. . TI � �I . i..� _
��` � � : �� � � '1 90'1 780
I illl I = A
F I� �TF F I�+1. / \ 1 1
ALL RIGHTS ARE RESERVED. sNeEr ov oRnwN er: /� I O I
1 10 D. BRISiOE � `
SCn�Es NOTED REF. 7-PZZCYK �AiE: 09/O6/19