THE ME�ICAL GAS FEED THROUGH SHOULD BE AS CLOSE TO THE
SIEMENS FlLTER PANEL AS POSSIBLE WITHIN 3 FEEi IS STRONGLY
RECOMMENDED.
THE FINAL MEDICAL GAS CONNECTION TO THE WAVEGUIDE CANNOT
BE MADE UMIL GROUN� ISOUTION MONITORING IS COMPLEiE.
iHE ME�ICAL GAS MUSi BE GROUNDED t0 7HE WAVEGUIDE AN�
RF SHIELD. REV 0
— MEDICAL GAS EXAMPLE �o s�A�E
IMAGE QUALITY CONCERNS
BROADBAN� RF NOISE IS A SINGLE TRANSIENT OR CONTINUOUS SERIES
OF TRANSIENT DISTURBANCES CAUSE� BY AN ELECTRICAL DISCHARGE.
LOW HUMI�IiV ENVIRONMENTAL CONDITIONS WILL HAVE HIGHER
PROBABILItY OP ELECiRICAL DISCHARGE. iHE ELECiRICAL DISCHARGE
CAN OCCUR �UE r0 ELECiRICAL ARQNG OR MERELY 5?AiIC �ISCHARGE.
SOME POTENTIAL SOl1RCE5 CAPABLE OF PRODUCING ELECTRICAL
�ISCHARGE INCLU�E
• LOOSE HARDWARE/PASTENERS-VIBRATION OR MOVEMENT (ELECTRICAL
CONiINUIiY MUSi ALWAVS BE MAINiAWED).
• FLOORING MATERIAL INCWDING RA6E� ACCE55 FLOORING (PANELS
AND SUPPORT HARDWARE) AND CARPEfING.
• ELECTRICAL FIXTURES (LIGHTING Fl%TURES, TRACK LIGHTING,
EMERGENCY LIGHTING, BATfERY CHARGERS, OUTLEfS).
• DUCtING FOR HVAC AND CABLE ROUtING.
• RF SHIELD SEALS (WALLS, DOORS, WINDOWS, EfC.). R� Q
s*nw�Ess srcc� oiE�EcrRic eusHiNc
SPRING WASHER STAWLESS STEEL
STAWLESS STEEL SPRING WASHER
LOCKING NUT� ,� ,� �STAWLE55 STEEL SCREW
3/16" MINIMUM ',�^�3/1fi' MINIMl1M
SiAMLESS SiEEL // SiAINLESS SiEEL
FIANGEJ FIANGE
�IELECTRIC ISOUTION HAS TO BE INSTALLED TO AVOID ELECTRICAL
NOISE BEING PICKED UP BY LOOPS BEfWEEN THE MAGNEf, THE
QUENCH TUBE, THE RF ROOM, AN� THE BUILDING.
IT IS NECESSARY TO HAVE ONE DIELECTRIC ISOLATION OF THE
QUENCH TUBE INSI�E THE RF ROOM (PROVIDE� BY SIEMENS AT
THE MAGNEf) AND ONE OUTSI�E THE RF ROOM (PROVIDE� BY
iHE WENCH iUBE MANUFACiURER). REV 0
— DIELECTRIC ISOLATION �o s�A�E
pUENCH TUBE CONNECTION CaNNECTION PLATE
FUNGES BOTH ENDS �t0 RF ROOM
I P
AS REQIIIRED
Lm = 4 x D
D= IMERNAL WAVE GUI�E �IAMEfER
(D </= 11 13/16")
L = WAVE GUI�E LENGTH
1 1/9" AfAXIMUM
iYPICAL
�IAMEfER
TO SUIT
VIEW A
THE RF CABW FEED THROl1GH NEE�S TO CONFORM TO CERTAIN
GEOMETRIC CONSTRAINTS IN OR�ER TO GUARAMEE THE RF
IMEGRItY OF iHE RP CABIN.
AS A FUNCTION OF INTERNAL PIPE DIAMETER, THE FOLLOWING
APPLIES TO MINIMUM PIPE LENGTH FOR FREQUENQES UP TO
128 MHz AND 110 dB ATTENUATION.
�EPENDING ON RF CABIN DESIGNS, RF SEALS CAN BE REOl11RED
BER4EEN THE MOUNTING FUNGE AN� THE RF CABIN.
QUENCH TUBE RF CABW FEED THROUGH
REV 0
— WAVE GUIDE �o s�A�E
RF DOOR OPENING `�" "'" �""
IN iHE EVENi OF A CAiA5i0PHIC FAIWRE OF ?HE �UENCH VENi
Dl1RING A pUENCH, PRESSURE Bl11LT UP MAV PREVENT OPENING A
DOOR THAT OPENS IMO THE RF ROOM, PREVENTING EVACUATION
FROM LIFE THREATENING CONDITIONS.
FOR THIS REASON THE RF DOOR SHOULD OPEN TO THE Ol1TSIDE
OF THE RF ROOM.IF THE DOOR CANNOT OPEN OUT FROM THE RF
ROOM, OTHER APPROPRIATE MEANS HAVE TO BE PROVIDED SO THAT
THE RF ROOM DOOR IS NOT PREVENTED FROM OPENING �UE TO
PRESSl1RE.
IF THE �OOR OPENS INTO THE RF ROOM, A 24"x24" OPENING FOR
PRESSURE EQUALRATION INTO THE RF ROOM MUST BE INSTALLE�.
iH15 IS MANDAiORV. iHIS IS NOt AN ESCAPE HAtCH. 7HE
Pl1RPO5E OF THE OPENING IS TO RELIEVE PRESSURE AND ALLOW
THE MAIN DOOR TO BE OPENED SO THAT OCCUPANTS CAN BE
EvncunrEo.
THE OPENINGS WILL HAVE PANELS INSTALLED IN THE RF ROOM OR
THE DOOR THAT CAN BE UNLOCKED AND OPENED TO THE OUTSIDE
IN CASE OF EMERGENCY. THESE PANELS REpUIRE AN RF SEALE�
INSiALLAtION. AhTER OPENING iHE PANEL, iHE OUiLEf SHOULD
MEASURE A? LEASi 24"x24". WHEN 11SING REC?ANGl1LAR PANELS, RF
THE SHORTER SIDE SHOULD MEASl1RE OF MINIMUM OF 24". SHIELDING
RF RLiER PANEL
i�/� �'
� \\ ��
�
� ��
I \ �
\ �� /
�OUENCH TUBE EXIT
aF wiNoow
`\� 1
RF ROOM DOOR
OPENING
OPENING FOR� � DIRECTION TO
TO ENSURE UNOBSTRUCTED VENTING, THIS OPENING CANNOT BE PRESSURE iHE OUi51DE
SUBDIVIDE�. iH15 MEANS iHAi, FOR EXAMPLE, RF SEALE� EOUALIZATION
HONEYCOMB GRIDS ARE NOT PERMITfED.
SAFEIY ASPECTS POR THE RF ROOM�
EASV REMOVAL OF THE PANEL BV A PERSON HAS TO BE ENSURE� IT MUST BE POSSIBLE TO LOCK THE RF ROOM (EXAMINATION ROOM)
AND A MINIMUM �ISTANCE OF 40" TO A FlXE� OBJECT MU4 BE DOOR FROM iHE OUi51DE li MUSt AL50 BE POSSIBLE i0 OPEN
MAINiAWE�. iHE PANEL SHOUL� BE INStALLE� IN AN ACCESSIBLE THE �OOR FROM THE INSIDE WITHOl1T A KEY OR ADDITIONAL DEVICE.
LOCATION AND ALLOW ESCAPE OF THE LOW �ENSIT' HELIUM.
THE RF DOOR IS AN IMPORTANT COMPONEM FOR G00� IMAGE
AS AN ALTERNATNE TO AN OUTSWING DOOR, THE STATIONARY pUALITY AS WELL AS SAFEIV, THE OWNER/OPERATOR OF THE MR
OBSERVAiION WINDOW IS REPLACED BY A WINDOW OPENING INiO SVS?EM M115i MAINiAIN iHE RF ROOM AS INSiRUCiE� BV ?HE RF
THE CONTROL AREA OR THE DOOR IS REPLACED WITH AN RF ROOM MANUFACTURER IN OR�ER TO GUARANTEE CORRECT Fl1NCTI0N
SEALE� SLIDING DOOR. IT SHOULD BE ENSURED THAT THE DOOR OF THE RP DOOR.
CLOSES IN A WAY THAT ALLOWS IT TO MOVE AWAY FROM THE
FRAME IN CASE OF OVERPRESSURE NO FERROMAGNEfIC IiEMS CAN BE BROUGHi INiO iHE RP ROOM
ARER THE MAGNET HAS 6EEN RAMPED UP TO FlELD. MAGNEfIC ITEMS
IF THE DOOR OPENS TO THE OUTSIDE, THE OPENING IN THE RF WILL BECOME ATTRACTED TO THE MAGNET WITH NO WARNING AN� DUE
ROOM IS STILL RECOMMENDE�. TO THE HIGH MAGNEfIC FlELD, WILL BECOME MISSILES.
THE RF ROOM MANUFACTURER CAN PROVIDE VOU WITH ADDITIONAL NOTE FOR DOORS MOVED BV AN AUXILIARY DRIVES (ELECTRICAL
RF SEALED ROOM OPENINGS iHAi LEAD DIRECiLY i0 iHE OUt51DE OR PNEUMATIC), MANUAL OPERATION HAS TO BE ENSUftE�. AN
HOWEVER, THESE OPENINGS ARE ALSO CON�l11TS FOR NOISE OUTSIDE WINDOW SHOULD BE IN THE VICINITV TO ALLOW VENTING
GENERATED OUTSIDE THE RF ROOM. UNOBSTRUCTE� FLOW EXHAU4E� GAS t0 iHE 011i51�E. iHE IMEGRIN OF iHE RF
THROUGH THIS PIPE MUST BE GUARAMEE�. SHIELD Ml1ST BE TESTED AFTER REMODELING.
REV 0
SAFETY INFORMATION — PRESSURE EQUALIZATION NONEE'
RF SHIELDING
i) THE E%AMINATION AREA MUST BE SHIELDED TO PROVIDE A
RE�UCTION OF RADIO FREpUENCV WAVES EMANATING FROM EXTERNAL
TRANSMITTERS. THE REOUIRE� ATfENUATION IS 90dB W THE
FREWENCY RANGE OF 15-128 MHz. IF CO—SItING 1W0 SYSiEMS
EACH ROOM SHOUL� BE 100 tlB.
2) THE RF SHIEL� MUST BE TESTED BEFORE AND AFTER MAGNET
PIACEMENT IN THE RF ROOM AND AFTER THE SIEMENS ftF FlLTER
PANEL IS INStALLE�. tHE RF—SMELDING MU4 BE INSULAtED FROM ALL
GROl1ND5 Sl1CH THAT THE ONLV GROUND IS THE SINGLE POINT GROl1ND
ON THE OUTSIDE OP THE RF—ROOM WALL RESISTANCE > 100 OHMS.
3) ALL ELECTRICAL LMES INTO THE RP ROOM MUST BE ROUTED
iHROUGH RP FlLiERS (PROVI�E� 9Y RF SMEL�ING Sl1PPLIER). ALL
ELECTRICALLV NON—CONDUCTNE SUPPLV LINES (E.G. FIBER OPTIC
CABLES, OR HOSES) IMO THE RF ROOM MUST BE ROUTED THROUGH
RF SEALED WAVE GUIDES (PROVIDE� BY RF SMELDING SUPPLIER).
4) FOR PRESSURE EOUALIZAiION PURPOSES iHE RF �OOR SHOUL�
OPEN TO THE OUTSIDE OF THE RF ROOM. AS AN ALTERNATIVE A
24"%24" OPENING W THE RF ROOM FOR PRESSURE EQUALIZATION IS
REOUIRED.
REV 1
FILTER PLATE GENERAL NOTES
1) SiRUCiURAL SUPPORi AND INiEGRAtION OP iHE SIEMENS
SUPPLIE� AND INSTALLED FlLTER PLATE WITH MAGNEfIC AND RF
SHIELDING SHALL 6E SPEQFIED, DETAILED AN� NOTED BV THE RF
AN� MAGNEfIC SHIEL�ING MANUFACIURER(5) WI?H OVERALL
COORDINATION WITH SIEMENS SITE SPEQFlC RECOMMENDATIONS TO
BE THE RESPONSIBILIIY OF THE ARCHITECT OF RECOR�.
2) THE FlLTER PLATE FRAME, RF FlLTER PUTE BUNK, RF GASKET
AND MOl1NTING HARDWARE FOR THE Pl1RPO5E5 OF TESTING THE
IN7EGRItV OF iHE RF ENCLOSURE PRIOR i0 tHE INStALLAiION OP
THE SIEMENS SUPPLIED AND INSTALLED RP FlLTER PLATE SHALL BE
PROVIDE� AND INSTALLED BV THE SHIELDING COMRACTOR(5) UNLESS
SPECIFIED OTHERWISE.
SHIELDING GENERAL NOTES
1) 9EMEN5 RE�UE515 iHA1 1HE SMEL�ING MANl1FAC1l1RER(S)
SU6MIT FINAL SHOP DRAWINGS TO SIEMENS FOR REVIEW PRIOR TO
THEIR INCWSION IN CONSTRUCTION �OCUMENTS. SIEMENS SHALL
BE COPIED ON ALL FlELD ORDER CHANGES CONCERNING CHANGES
IN RF AN� MAGNEfIC SHIELDWG CONDItI0N5, CONFlGURAiION AN�
SPECIFlCATION. THE RF AND MAGNEfIC SHIELDING CONTRACTOR(5)
SHALL FURNISH "AS BUILT" SCALED AND DIMENSIONED PLANS
REFLECTING ANY AN� ALL FlEL� OR�ER CHANGES PRIOR TO THE
COMPLEfION OF THE CONSTRUCTION DOCUMENTS.
2) ALL CHANGES TO SIEMENS RECOMMENDED OPENINGS AND
PENEiRATIONS SHALL BE APPROVED BV THE SIEMENS PROJECT
MANAGER PRIOR TO THE COMPLEfION OF THE CONSTRUCTION
DOCUMENiS.
3) THE 9ZE, LOCATION, AND DIMENSIONS OF ANV MAGNETIC
SMELDING REOUIRE� HAS BEEN �EfERMWE� BY SIEMENS THIS
MFORMATION HAS BEEN SUPPLIE� TO THE MAGNETIC SHIEL�ING
FABRICA?OR i0 �ESIGN iHE SiRl1C?l1RAL SUPPOR? SV4EM
REQl11RED FOR THE MAGNEfIC SHIEL�ING MATERIAL.
:iit�
EXAM ROOM INTERIOR NOTES
1) ONLV NON—MAGNEfIC MAiERIALS ARE 10 BE USE� AN� INS?ALLE�
IN THE RF ROOM. SEE CONSTRUCTION REQl11REMENTS.
2) A SUSPENDE� CEILING MUST BE STATICALLY SUSPENDED, NOT
SUSPENDE� WIiH MOVABLE CLAMPS. SPRINGS, EfC.
3) RODS M SUSPEN�ED CEILINGS MUST BE INSTALLE� SECl1RELY.
GALVANIC WNTENT BEfWEEN THE R0�5 MUST BE GUARAMEED, THEV
MUST NOT JUST LIE ON TOP OF ONE ANOTHER. A WIRE JUMPER
BEfWEEN RO�S MAY BE USEFUL.
4) ELECTRICAL WIRING, FOR AMBIEM LIGHTS FOR E%AMPLE, MUST NOT
SIMPLY REST ON THE SUSPENDED CEILING, THEV MUST BE FASTENED
OR INSIDE A CONDUIi t0 PREVEN7 MOtION.
REV 1
uNE oF FiNisHEo
FlNISHED WALL OPENING
LWE OF FlNISHEO
WALL OPENING
r—•-----•—•-----•—
THE FlNISHED WALL DIMENSION o000
00 00
. mm
APPLIES To THE EOUIPMENT N3 m . aZ I�I �� o0 00 0000
ROOM AND iHE E%AM ROOM. z`
�z � '�w I �I e e e -___
i =W a ' ^0
N�—^o i '�o �.� e e e
- � '� _____.'0 � o
i � i
i i/is• i
�
2 15/16"
3'
15 x
�we or FiNisHeo
�
�
x�
� I EQUIPMENT ROOM SIDE FILTER PLATE ELEVATION
1 z, �,e. s
AIR =
OUTLET
SIEAIENS RF
FlLTER PIATE
AIR -
INLEf i
AIR
OUTLET
AIR
NLET
45 1/T' 34 1/4..
EQUIPMENT ROOM EXAM ROOM
IP A COVER IS �ESIRED TO CONCEAL THE FlLTER PANEL INSIDE THE
EXAM ROOM (NOi MCLUOED IN DELNERV), 17 IS NECESSARV t0 HAVE
VENTILAITON AND PROPER CLEARANCE FOR CABLING AND SERVICE.
RECOMMEN�ED SIZE IS 4'-4" WIDE. THERE SHOUL� BE A MINIMUM
8" CLEAR FROM THE TOP OF THE FlLTER TO THE CEILING ABOVE.
2 FILTER PANEL COVERS �o s�A�E
12••
SCALE
3/q.._�. p..
FlLTERS — IYPICAL
(6) PlqCES.
1" DIAIAEfER X 4� LONG
a o WqyEGUI�E
� p O Y DIAlAETER X 8" LONG
� / WAVEGUI�E
� / 7' �IAMEfER X B" LONG
I� � WAVEGUIDE
m � I
olI� I lo
LL AREA FOR
EXPANSION
CUTOOT ON RF PANEL
NON—SIEMENS EQUIPMENt REOUIRING RF ROOM PENEfRAtION
REOUIRES A SEPARATE PENEfRATION PANEL BE PROVIDED BV THE
CUSTOMER AN� INSTALLE� BY THE RF ROOM MANUFACTURER.
SIEMENS FlLTER PANEL IS RESERVED FOR SIEMENS PRODUCTS AND
FUTURE UPGRADES ONLV.
NPICAL OEM (ORIGINAL EOUIPMENT MANUFACTl1RER) EpUIPMENT
MAV INCWDE, BUT NOT BE LIMITED T0, INJECTORS, fMRI, AND
SAFEIY RELATED REMS. SPEQFlC EpUIPMEM MANUFACTURERS
WILL HAVE DEfAILED WFORMAiION REGARDING REOUIRED
PENEfRATI0N5. ABOVE IS AN EXAMPLE OF A PENEfRATION PANEL
THAT WILL MEET MANV REQl11REMENTS. THE PENETRATION PANEL
SHALL BE LOCATE� IN CLOSE PRO%IMI1V TO THE SIEMENS FlLTER
PANEL AN� BE COMPLIANT WITH ALL 9EMENS RF ROOM
RWUIREMENIS.
OEM FILTER PANEL I�o s�A�E
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
�Sv�� �'l'�^l�`�RAiI
�
onrE: 12/02/19
N T I O N. �� � � ��� �, � ���� � � �,�� ��� :. � �� � ��. � �� � �� �, �� � �� � �� ,� � � � ��, � �� �� �,�� ��� ,�"' 't�,��� ��, � � �
� � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ��r� ���
r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i v m mi i� eF�- F , i:n
��� �� �� � �� � ��� _�,�N��� �� ��� ��, ��� � �� .�� -� N..��, ��- � � � � N„� � �� �, N���-_����
VIDA
REV 8
- G�-i� "�-F Tf Ilu f�=�G-
�� " SIEMENS
��. , � _ � �, _
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032
MRI ROM �JB132 — MAGNEfOM VI�A VIOA XQ GRADIENTS
Qi os/os/ts eoMP��re New urouT easeo iHr F ,�r :: � u = PROJECT #: SHEEL
aH uhst wnu eacKcreouHos - n r ri . i-��. /�
1901780RF �AiE� 04�27�19 �L'�, ���i I nlll L � 9 O � 7 $ O ■ /�
Qo oe/z�/i s wPRaho ar eusmuEas roe nw�s F � ,rF F �_;;�. � �� f�
SVM DATE DESCRIPTION ALL RIGHTS ARE RESERVED. SHEEf OP DRAWN BY:
4 10 D. BRISiOE
—ISSUE BLOCK— S�AqS NOTED REF. 7-PZZCYK �ATE� 09/O6/19
� �
V cai
E ¢
tt �
> �
¢ �
n 3
w z
� o
o g
i a�
O z
E _
� o
w �
g �
a �
� o
r �
� o
Z �
> >
E �
� Q
E i
< m
\ \
a h