Loading...
HomeMy WebLinkAboutA-502BF THE ME�ICAL GAS FEED THROUGH SHOULD BE AS CLOSE TO THE SIEMENS FlLTER PANEL AS POSSIBLE WITHIN 3 FEEi IS STRONGLY RECOMMENDED. THE FINAL MEDICAL GAS CONNECTION TO THE WAVEGUIDE CANNOT BE MADE UMIL GROUN� ISOUTION MONITORING IS COMPLEiE. iHE ME�ICAL GAS MUSi BE GROUNDED t0 7HE WAVEGUIDE AN� RF SHIELD. REV 0 — MEDICAL GAS EXAMPLE �o s�A�E IMAGE QUALITY CONCERNS BROADBAN� RF NOISE IS A SINGLE TRANSIENT OR CONTINUOUS SERIES OF TRANSIENT DISTURBANCES CAUSE� BY AN ELECTRICAL DISCHARGE. LOW HUMI�IiV ENVIRONMENTAL CONDITIONS WILL HAVE HIGHER PROBABILItY OP ELECiRICAL DISCHARGE. iHE ELECiRICAL DISCHARGE CAN OCCUR �UE r0 ELECiRICAL ARQNG OR MERELY 5?AiIC �ISCHARGE. SOME POTENTIAL SOl1RCE5 CAPABLE OF PRODUCING ELECTRICAL �ISCHARGE INCLU�E • LOOSE HARDWARE/PASTENERS-VIBRATION OR MOVEMENT (ELECTRICAL CONiINUIiY MUSi ALWAVS BE MAINiAWED). • FLOORING MATERIAL INCWDING RA6E� ACCE55 FLOORING (PANELS AND SUPPORT HARDWARE) AND CARPEfING. • ELECTRICAL FIXTURES (LIGHTING Fl%TURES, TRACK LIGHTING, EMERGENCY LIGHTING, BATfERY CHARGERS, OUTLEfS). • DUCtING FOR HVAC AND CABLE ROUtING. • RF SHIELD SEALS (WALLS, DOORS, WINDOWS, EfC.). R� Q s*nw�Ess srcc� oiE�EcrRic eusHiNc SPRING WASHER STAWLESS STEEL STAWLESS STEEL SPRING WASHER LOCKING NUT� ,� ,� �STAWLE55 STEEL SCREW 3/16" MINIMUM ',�^�3/1fi' MINIMl1M SiAMLESS SiEEL // SiAINLESS SiEEL FIANGEJ FIANGE �IELECTRIC ISOUTION HAS TO BE INSTALLED TO AVOID ELECTRICAL NOISE BEING PICKED UP BY LOOPS BEfWEEN THE MAGNEf, THE QUENCH TUBE, THE RF ROOM, AN� THE BUILDING. IT IS NECESSARY TO HAVE ONE DIELECTRIC ISOLATION OF THE QUENCH TUBE INSI�E THE RF ROOM (PROVIDE� BY SIEMENS AT THE MAGNEf) AND ONE OUTSI�E THE RF ROOM (PROVIDE� BY iHE WENCH iUBE MANUFACiURER). REV 0 — DIELECTRIC ISOLATION �o s�A�E pUENCH TUBE CONNECTION CaNNECTION PLATE FUNGES BOTH ENDS �t0 RF ROOM I P AS REQIIIRED Lm = 4 x D D= IMERNAL WAVE GUI�E �IAMEfER (D </= 11 13/16") L = WAVE GUI�E LENGTH 1 1/9" AfAXIMUM iYPICAL �IAMEfER TO SUIT VIEW A THE RF CABW FEED THROl1GH NEE�S TO CONFORM TO CERTAIN GEOMETRIC CONSTRAINTS IN OR�ER TO GUARAMEE THE RF IMEGRItY OF iHE RP CABIN. AS A FUNCTION OF INTERNAL PIPE DIAMETER, THE FOLLOWING APPLIES TO MINIMUM PIPE LENGTH FOR FREQUENQES UP TO 128 MHz AND 110 dB ATTENUATION. �EPENDING ON RF CABIN DESIGNS, RF SEALS CAN BE REOl11RED BER4EEN THE MOUNTING FUNGE AN� THE RF CABIN. QUENCH TUBE RF CABW FEED THROUGH REV 0 — WAVE GUIDE �o s�A�E RF DOOR OPENING `�" "'" �"" IN iHE EVENi OF A CAiA5i0PHIC FAIWRE OF ?HE �UENCH VENi Dl1RING A pUENCH, PRESSURE Bl11LT UP MAV PREVENT OPENING A DOOR THAT OPENS IMO THE RF ROOM, PREVENTING EVACUATION FROM LIFE THREATENING CONDITIONS. FOR THIS REASON THE RF DOOR SHOULD OPEN TO THE Ol1TSIDE OF THE RF ROOM.IF THE DOOR CANNOT OPEN OUT FROM THE RF ROOM, OTHER APPROPRIATE MEANS HAVE TO BE PROVIDED SO THAT THE RF ROOM DOOR IS NOT PREVENTED FROM OPENING �UE TO PRESSl1RE. IF THE �OOR OPENS INTO THE RF ROOM, A 24"x24" OPENING FOR PRESSURE EQUALRATION INTO THE RF ROOM MUST BE INSTALLE�. iH15 IS MANDAiORV. iHIS IS NOt AN ESCAPE HAtCH. 7HE Pl1RPO5E OF THE OPENING IS TO RELIEVE PRESSURE AND ALLOW THE MAIN DOOR TO BE OPENED SO THAT OCCUPANTS CAN BE EvncunrEo. THE OPENINGS WILL HAVE PANELS INSTALLED IN THE RF ROOM OR THE DOOR THAT CAN BE UNLOCKED AND OPENED TO THE OUTSIDE IN CASE OF EMERGENCY. THESE PANELS REpUIRE AN RF SEALE� INSiALLAtION. AhTER OPENING iHE PANEL, iHE OUiLEf SHOULD MEASURE A? LEASi 24"x24". WHEN 11SING REC?ANGl1LAR PANELS, RF THE SHORTER SIDE SHOULD MEASl1RE OF MINIMUM OF 24". SHIELDING RF RLiER PANEL i�/� �' � \\ �� � � �� I \ � \ �� / �OUENCH TUBE EXIT aF wiNoow `\� 1 RF ROOM DOOR OPENING OPENING FOR� � DIRECTION TO TO ENSURE UNOBSTRUCTED VENTING, THIS OPENING CANNOT BE PRESSURE iHE OUi51DE SUBDIVIDE�. iH15 MEANS iHAi, FOR EXAMPLE, RF SEALE� EOUALIZATION HONEYCOMB GRIDS ARE NOT PERMITfED. SAFEIY ASPECTS POR THE RF ROOM� EASV REMOVAL OF THE PANEL BV A PERSON HAS TO BE ENSURE� IT MUST BE POSSIBLE TO LOCK THE RF ROOM (EXAMINATION ROOM) AND A MINIMUM �ISTANCE OF 40" TO A FlXE� OBJECT MU4 BE DOOR FROM iHE OUi51DE li MUSt AL50 BE POSSIBLE i0 OPEN MAINiAWE�. iHE PANEL SHOUL� BE INStALLE� IN AN ACCESSIBLE THE �OOR FROM THE INSIDE WITHOl1T A KEY OR ADDITIONAL DEVICE. LOCATION AND ALLOW ESCAPE OF THE LOW �ENSIT' HELIUM. THE RF DOOR IS AN IMPORTANT COMPONEM FOR G00� IMAGE AS AN ALTERNATNE TO AN OUTSWING DOOR, THE STATIONARY pUALITY AS WELL AS SAFEIV, THE OWNER/OPERATOR OF THE MR OBSERVAiION WINDOW IS REPLACED BY A WINDOW OPENING INiO SVS?EM M115i MAINiAIN iHE RF ROOM AS INSiRUCiE� BV ?HE RF THE CONTROL AREA OR THE DOOR IS REPLACED WITH AN RF ROOM MANUFACTURER IN OR�ER TO GUARANTEE CORRECT Fl1NCTI0N SEALE� SLIDING DOOR. IT SHOULD BE ENSURED THAT THE DOOR OF THE RP DOOR. CLOSES IN A WAY THAT ALLOWS IT TO MOVE AWAY FROM THE FRAME IN CASE OF OVERPRESSURE NO FERROMAGNEfIC IiEMS CAN BE BROUGHi INiO iHE RP ROOM ARER THE MAGNET HAS 6EEN RAMPED UP TO FlELD. MAGNEfIC ITEMS IF THE DOOR OPENS TO THE OUTSIDE, THE OPENING IN THE RF WILL BECOME ATTRACTED TO THE MAGNET WITH NO WARNING AN� DUE ROOM IS STILL RECOMMENDE�. TO THE HIGH MAGNEfIC FlELD, WILL BECOME MISSILES. THE RF ROOM MANUFACTURER CAN PROVIDE VOU WITH ADDITIONAL NOTE FOR DOORS MOVED BV AN AUXILIARY DRIVES (ELECTRICAL RF SEALED ROOM OPENINGS iHAi LEAD DIRECiLY i0 iHE OUt51DE OR PNEUMATIC), MANUAL OPERATION HAS TO BE ENSUftE�. AN HOWEVER, THESE OPENINGS ARE ALSO CON�l11TS FOR NOISE OUTSIDE WINDOW SHOULD BE IN THE VICINITV TO ALLOW VENTING GENERATED OUTSIDE THE RF ROOM. UNOBSTRUCTE� FLOW EXHAU4E� GAS t0 iHE 011i51�E. iHE IMEGRIN OF iHE RF THROUGH THIS PIPE MUST BE GUARAMEE�. SHIELD Ml1ST BE TESTED AFTER REMODELING. REV 0 SAFETY INFORMATION — PRESSURE EQUALIZATION NONEE' RF SHIELDING i) THE E%AMINATION AREA MUST BE SHIELDED TO PROVIDE A RE�UCTION OF RADIO FREpUENCV WAVES EMANATING FROM EXTERNAL TRANSMITTERS. THE REOUIRE� ATfENUATION IS 90dB W THE FREWENCY RANGE OF 15-128 MHz. IF CO—SItING 1W0 SYSiEMS EACH ROOM SHOUL� BE 100 tlB. 2) THE RF SHIEL� MUST BE TESTED BEFORE AND AFTER MAGNET PIACEMENT IN THE RF ROOM AND AFTER THE SIEMENS ftF FlLTER PANEL IS INStALLE�. tHE RF—SMELDING MU4 BE INSULAtED FROM ALL GROl1ND5 Sl1CH THAT THE ONLV GROUND IS THE SINGLE POINT GROl1ND ON THE OUTSIDE OP THE RF—ROOM WALL RESISTANCE > 100 OHMS. 3) ALL ELECTRICAL LMES INTO THE RP ROOM MUST BE ROUTED iHROUGH RP FlLiERS (PROVI�E� 9Y RF SMEL�ING Sl1PPLIER). ALL ELECTRICALLV NON—CONDUCTNE SUPPLV LINES (E.G. FIBER OPTIC CABLES, OR HOSES) IMO THE RF ROOM MUST BE ROUTED THROUGH RF SEALED WAVE GUIDES (PROVIDE� BY RF SMELDING SUPPLIER). 4) FOR PRESSURE EOUALIZAiION PURPOSES iHE RF �OOR SHOUL� OPEN TO THE OUTSIDE OF THE RF ROOM. AS AN ALTERNATIVE A 24"%24" OPENING W THE RF ROOM FOR PRESSURE EQUALIZATION IS REOUIRED. REV 1 FILTER PLATE GENERAL NOTES 1) SiRUCiURAL SUPPORi AND INiEGRAtION OP iHE SIEMENS SUPPLIE� AND INSTALLED FlLTER PLATE WITH MAGNEfIC AND RF SHIELDING SHALL 6E SPEQFIED, DETAILED AN� NOTED BV THE RF AN� MAGNEfIC SHIEL�ING MANUFACIURER(5) WI?H OVERALL COORDINATION WITH SIEMENS SITE SPEQFlC RECOMMENDATIONS TO BE THE RESPONSIBILIIY OF THE ARCHITECT OF RECOR�. 2) THE FlLTER PLATE FRAME, RF FlLTER PUTE BUNK, RF GASKET AND MOl1NTING HARDWARE FOR THE Pl1RPO5E5 OF TESTING THE IN7EGRItV OF iHE RF ENCLOSURE PRIOR i0 tHE INStALLAiION OP THE SIEMENS SUPPLIED AND INSTALLED RP FlLTER PLATE SHALL BE PROVIDE� AND INSTALLED BV THE SHIELDING COMRACTOR(5) UNLESS SPECIFIED OTHERWISE. SHIELDING GENERAL NOTES 1) 9EMEN5 RE�UE515 iHA1 1HE SMEL�ING MANl1FAC1l1RER(S) SU6MIT FINAL SHOP DRAWINGS TO SIEMENS FOR REVIEW PRIOR TO THEIR INCWSION IN CONSTRUCTION �OCUMENTS. SIEMENS SHALL BE COPIED ON ALL FlELD ORDER CHANGES CONCERNING CHANGES IN RF AN� MAGNEfIC SHIELDWG CONDItI0N5, CONFlGURAiION AN� SPECIFlCATION. THE RF AND MAGNEfIC SHIELDING CONTRACTOR(5) SHALL FURNISH "AS BUILT" SCALED AND DIMENSIONED PLANS REFLECTING ANY AN� ALL FlEL� OR�ER CHANGES PRIOR TO THE COMPLEfION OF THE CONSTRUCTION DOCUMENTS. 2) ALL CHANGES TO SIEMENS RECOMMENDED OPENINGS AND PENEiRATIONS SHALL BE APPROVED BV THE SIEMENS PROJECT MANAGER PRIOR TO THE COMPLEfION OF THE CONSTRUCTION DOCUMENiS. 3) THE 9ZE, LOCATION, AND DIMENSIONS OF ANV MAGNETIC SMELDING REOUIRE� HAS BEEN �EfERMWE� BY SIEMENS THIS MFORMATION HAS BEEN SUPPLIE� TO THE MAGNETIC SHIEL�ING FABRICA?OR i0 �ESIGN iHE SiRl1C?l1RAL SUPPOR? SV4EM REQl11RED FOR THE MAGNEfIC SHIEL�ING MATERIAL. :iit� EXAM ROOM INTERIOR NOTES 1) ONLV NON—MAGNEfIC MAiERIALS ARE 10 BE USE� AN� INS?ALLE� IN THE RF ROOM. SEE CONSTRUCTION REQl11REMENTS. 2) A SUSPENDE� CEILING MUST BE STATICALLY SUSPENDED, NOT SUSPENDE� WIiH MOVABLE CLAMPS. SPRINGS, EfC. 3) RODS M SUSPEN�ED CEILINGS MUST BE INSTALLE� SECl1RELY. GALVANIC WNTENT BEfWEEN THE R0�5 MUST BE GUARAMEED, THEV MUST NOT JUST LIE ON TOP OF ONE ANOTHER. A WIRE JUMPER BEfWEEN RO�S MAY BE USEFUL. 4) ELECTRICAL WIRING, FOR AMBIEM LIGHTS FOR E%AMPLE, MUST NOT SIMPLY REST ON THE SUSPENDED CEILING, THEV MUST BE FASTENED OR INSIDE A CONDUIi t0 PREVEN7 MOtION. REV 1 uNE oF FiNisHEo FlNISHED WALL OPENING LWE OF FlNISHEO WALL OPENING r—•-----•—•-----•— THE FlNISHED WALL DIMENSION o000 00 00 . mm APPLIES To THE EOUIPMENT N3 m . aZ I�I �� o0 00 0000 ROOM AND iHE E%AM ROOM. z` �z � '�w I �I e e e -___ i =W a ' ^0 N�—^o i '�o �.� e e e - � '� _____.'0 � o i � i i i/is• i � 2 15/16" 3' 15 x �we or FiNisHeo � � x� � I EQUIPMENT ROOM SIDE FILTER PLATE ELEVATION 1 z, �,e. s AIR = OUTLET SIEAIENS RF FlLTER PIATE AIR - INLEf i AIR OUTLET AIR NLET 45 1/T' 34 1/4.. EQUIPMENT ROOM EXAM ROOM IP A COVER IS �ESIRED TO CONCEAL THE FlLTER PANEL INSIDE THE EXAM ROOM (NOi MCLUOED IN DELNERV), 17 IS NECESSARV t0 HAVE VENTILAITON AND PROPER CLEARANCE FOR CABLING AND SERVICE. RECOMMEN�ED SIZE IS 4'-4" WIDE. THERE SHOUL� BE A MINIMUM 8" CLEAR FROM THE TOP OF THE FlLTER TO THE CEILING ABOVE. 2 FILTER PANEL COVERS �o s�A�E 12•• SCALE 3/q.._�. p.. FlLTERS — IYPICAL (6) PlqCES. 1" DIAIAEfER X 4� LONG a o WqyEGUI�E � p O Y DIAlAETER X 8" LONG � / WAVEGUI�E � / 7' �IAMEfER X B" LONG I� � WAVEGUIDE m � I olI� I lo LL AREA FOR EXPANSION CUTOOT ON RF PANEL NON—SIEMENS EQUIPMENt REOUIRING RF ROOM PENEfRAtION REOUIRES A SEPARATE PENEfRATION PANEL BE PROVIDED BV THE CUSTOMER AN� INSTALLE� BY THE RF ROOM MANUFACTURER. SIEMENS FlLTER PANEL IS RESERVED FOR SIEMENS PRODUCTS AND FUTURE UPGRADES ONLV. NPICAL OEM (ORIGINAL EOUIPMENT MANUFACTl1RER) EpUIPMENT MAV INCWDE, BUT NOT BE LIMITED T0, INJECTORS, fMRI, AND SAFEIY RELATED REMS. SPEQFlC EpUIPMEM MANUFACTURERS WILL HAVE DEfAILED WFORMAiION REGARDING REOUIRED PENEfRATI0N5. ABOVE IS AN EXAMPLE OF A PENEfRATION PANEL THAT WILL MEET MANV REQl11REMENTS. THE PENETRATION PANEL SHALL BE LOCATE� IN CLOSE PRO%IMI1V TO THE SIEMENS FlLTER PANEL AN� BE COMPLIANT WITH ALL 9EMENS RF ROOM RWUIREMENIS. OEM FILTER PANEL I�o s�A�E RELEASED FOR CONSTRl1CTI0N Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel �Sv�� �'l'�^l�`�RAiI � onrE: 12/02/19 N T I O N. �� � � ��� �, � ���� � � �,�� ��� :. � �� � ��. � �� � �� �, �� � �� � �� ,� � � � ��, � �� �� �,�� ��� ,�"' 't�,��� ��, � � � � � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ��r� ��� r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i v m mi i� eF�- F , i:n ��� �� �� � �� � ��� _�,�N��� �� ��� ��, ��� � �� .�� -� N..��, ��- � � � � N„� � �� �, N���-_���� VIDA REV 8 - G�-i� "�-F Tf Ilu f�=�G- �� " SIEMENS ��. , � _ � �, _ IU HEALTH NORTH HOSPITAL 11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032 MRI ROM �JB132 — MAGNEfOM VI�A VIOA XQ GRADIENTS Qi os/os/ts eoMP��re New urouT easeo iHr F ,�r :: � u = PROJECT #: SHEEL aH uhst wnu eacKcreouHos - n r ri . i-��. /� 1901780RF �AiE� 04�27�19 �L'�, ���i I nlll L � 9 O � 7 $ O ■ /� Qo oe/z�/i s wPRaho ar eusmuEas roe nw�s F � ,rF F �_;;�. � �� f� SVM DATE DESCRIPTION ALL RIGHTS ARE RESERVED. SHEEf OP DRAWN BY: 4 10 D. BRISiOE —ISSUE BLOCK— S�AqS NOTED REF. 7-PZZCYK �ATE� 09/O6/19 � � V cai E ¢ tt � > � ¢ � n 3 w z � o o g i a� O z E _ � o w � g � a � � o r � � o Z � > > E � � Q E i < m \ \ a h