HomeMy WebLinkAboutD1.01^ � J
� '
\ �
r 10 �
I `� �
I �
—L--�---------
4 �p 4 2
n ��� � ____ � �
T — — C--_______--
— — — — — — — — —
-----
�� r—, �� ---------------, r------,�
Il �'� F—� p . II I �
II� s � L_ J� I
�}-�� �i II I
`, "� �—�I I � II �— � I
� LL' II
� hl � � �I
00 �_�-�� � a � i ;
� � �� �'' i
4 I
ii I
� a i � r--J
� 4 � I I � �
� I
� Q —
II —
1
II I I L__
a
II -
1
A I
I II �
y1'\\.� �� � ��
-'\ /� � � 3 � .LI ILL . 9 � �
L �� �
�
_-1 � �
I ��
5 � � ��
� I 6 � �
� � ----- � �
Ir--1i � r �� � �
/�
'� I `-�- � �� � � �
� 0 ` —
♦ ��---������—L----1------J
� �� �a � --- �� ��
O \ �` 9 � ---�I
_. I
C/ � i ... .,-. .,.• .... ._ . li
— �
\
�l� - a�-- - - �r---�
\ � I� � I / '
OFIRST FLOOR DEMOLITION PLAN �Z
1/4•=1-0•
WALL RATINGS LEGEND
NEW EXISTING
1 HOUR FIRE BARRIER, 1 HOUR FIRE BARRIER
1 HOUR FIRE RATED SMOKE � �
BARRIER
2 HOUR FIRE BARRIER � � �
2 HOUR FIRE/SMOKE BARRIER � �
3 HOUR FIRE WALL
1 HOUR FIRE RATED SMOKE
BARRIER
.�'
2 HOUR FIRE/SMOKE BARRIER
� � 3 HOUR FIRE WALL
NON-RATED SMOKE PARTITION � � � � � � � � � NON-RATED SMOKE PARTITION
♦
�
ALL RATED WALLS AND SMOKE PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE BOTTOM OF THE STRUCTURAL FLOOR OR
ROOF SLAB ABOVE. SEALIFIRESTOP AT TOP AND BOTTOM OF WALL AND AROUND ALL PENETRATIONS. PACK SAFING
INSULATION IN THE VOID SPACE BETW EEN METAL DECK FLUTES AND THE TOP OF THE RUNNER CHANNEL CONTRACTOR SHALL
FURNISH AND INSTALL ALL FlREPROOFlNG/FlRESTOPPING MATERIALS NECESSARY TO RETAIN THE IMEGRITY OF FlRE RATED
CONSTRUCTION. CONTRACTOR SHALL PROVIDE FIRESTOPPING W ITH UL LISTING AS REQUIRED BY THE MANUFACTURER'S
RECOMMENDATION TO COMPLETE THE INTENDED ASSEMBLV OF THE W ALL TVPE.
REFER TO SHEET L1.01 FOR W ALL/PARTITION PRIORITV DETAIL AND INFORMATION. TH IS DETAIL APPLIES TO ALL
INTERSECTIONS OF RATED WALLSAND NON-RATED WALLS.
RELEASED FOR CONSTRl1CTI0N
Su6jec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�j sv�� �\'��v�N�nl.� �
GENERAL DEMOLITION NOTES
1. THECONTRACTORSHALLFlELDVERIFYALLEXISTINGCONDITIONSPRIORTOBIDDINGANDSHALLBERESPONSIBLEFORPROJECT
COMPLETION THAT IS CONSISTENT W ITH THE INTENT OF THE DESIGN AND ALL APPLICABLE BUILDING CODES
2 ALLDRAWMGITEMSINDICATEDONTHISPLANWITHHEAVYDASHEDLINESASWELLASOUTLETSANDOTHERDEVICESASSOCIATED
WITH THESE ITEMS SHALL BE REMOVED IN THEIR ENTIRETYUNLESS NOTED OTHERWISE. REMOVE RELATED MECHANICAL,
ELECTRICAL,ANDPLUMBING(M.EP.)ITEMSASREpUIREDFORNEWCONSTRUCTION. REFERTOM.EP.DRAWINGSFORADDITIONAL
INFORMATION
3. REMOVEALL EXISTMG FINISHES INCLUSIVE OF FLOORMG, BASE, WALL COVERMGS AND CEILMG SYSTEMS THROUGHOUT AND IN
THEIR ENTIRETV AS REpUIRED FOR NEW CONSTRUCTION.
4. MAKEDEMOLITIONCLEANANDCOMPLETEINAMANNERTOACCEPTNEWFlNISHESANDIORSURFACESORASPERPRODUCT
MANUFACTURER'S SPECIFlCATIONS WHERE THOSE RWUIREMENTS ARE MORE RESTRICTIVE.
5. WHENDEMOLITIONCAl1SESOREXPOSESDAMAGEORl1NSWTABLESl1RFACESTOFLOOR,WALL,ORCEILINGSl1RFACESTOREMAIN,
THE CONTRACTOR SHALL PATCH AND REPAIR CONDITIONS IN A MANNER TO ACCEPT NEW FlNISHES ANDIOR SURFACES AS PER
PRODUCT MANUFACTURER'S SPECIFlCATIONS WHERE THOSE RWUIREMENTS ARE MORE RESTRICTNE.
6. ALLDEMOLITIONITEMSSHALLBECONSIDEREDTHEPROPERTVOFTHEOWNERUNTILVERIFlCATIONHASBEENRECENEDFROMTHE
OWNER REGARDING THEIR DISPOSAL PRIOR TO REMOVAL FROM THE SITE. ALL ITEMS NOT TO BE RETAINED BY THE OWNER SHALL
BE REMOVED IN THEIR ENTIRETY.
1. TEMPORARYPARTITIONSANDDOORSSHALLBEPROVIDEDANDMAINTAMEDBYTHEGENERALCONTRACTOR,ASRWUIREDBYTHE
OWNER,ARCHITECT,ANDENGINEER. GENERALCONTRACTORSHALLDETERMINEEXACTLOCATION.
8. WHEREANYNEWOREXISTINGDUCTWORKORPIPINGPENETRATIONSMTHEFLOORARETOBEREMOVEDORRELOCATED,THE
PENETRATIONS ARE TO BE FlLLED W ITH CONCRETE THE FULL FLOOR THICKNESS AND FlNISHED IN A MANOR SUITABLE TO ACCEPT
NEW FINISHES.
9. WHEREANVNEWOREXISTINGDUCTWORKORPIPINGPENETRATIONSINTHEWALLSABOVECEILINGARETOBEREMOVEDOR
RELOCATED, THE PENETRATIONS ARE TO BE PATCHED AND REPAIRED AS REQUIRED TO MATCH ADJACENT FlN ISHES OR ACCEPT
NEW FINISHES AS APPLICABLE.
10. GENERALCONTRACTORISRESPONSIBLEFORPROTECTMGOWNEREQUIPMENTWHICHCANNOTBEREMOVEDFROMTHEPROJECT
AREA. CONTRACTOR TO COORDINATE WITH OWNER FOR REMOVAL OR RELOCATION OF EQUIPMENT AND CONSTRUCTION.
11 REFERTOTHEMANDATORVCONTRACTORORIENTATIONREpUIREMENTSFORDEMOLITIONIN'SENSITIVEMEDICALAREAS". DURING
DEMOLITION,SENSITNEMEDICALACTNITIESMAYBEOCCURRINGINADJACENTAREAS. DUSTANDNOISELEVELSARETOBEKEPT
TO A MINIMUM.
12 PORTIONS OF THE BUILDMG SHALL BE OCCUPIED DURMG CONSTRUCTION. THE GENERAL CONTRACTOR SHALL FOLLOW THE
FOLLOWING LIFE SAFETV ISSUES. FAILURETO LIST ALL LIFE SAFETY ISSUES DOES NOT RELIEVE THE CONTRACTORS FROM
COMPLYING WITH FEDERAL STATE AND LOCAL CODES. THE CONTRACTURAL AGREEMENT BETWEEN THE CONTRACTOR AND
OWNER AND OTHER GOVERNING BODIES WHICH HAVE JURIDICTION ON THIS PROJECL THE FOLLOWING ARE MTERIM LIFE SAFETY
CODE ISSUES WHICH ARE SPECIFlC TO THIS PROJECT AND MUST BEADDRESSED:
A. INSURE ALL EXITS PROVIDE FREE AND UNOBSTRUCTED EGRESS, STAFF AND PERSONNEL SHALL RECENE TRAINING AND W RITTEN
NOTIFICATION IF ALTERNATIVE EXITS MUST BE DESIGNATED.
B. INSUREFREEANDUNOBSTRUCTEDACCESSTOEMERGENCYDEPARTMENTSORSERVICESFOREMEGENCYFORCES. COORDINATE
W ITH ONW ER AND ARCH ITECT.
C. INSURE FIRE ALARM, DETECTION AND SUPPRESSION SVSTEMS ARE NOT IMPAIRED. A TEMPORARV, BUT EQUIVALENT SVSTEM SHALL
BE PROVIDED, INSTALLED, AND TESTED PRIOR TO ANY EXISTING FIRE SYSTEM BEING IMPAIRED.
D. INSURE TEMPORARV CONSTRUCTION PARTITIONS ARE SMOKE TIGHT AND BUILT OF NON-COMBUSTIBLE MATERIALS. THESE
PARTITIONS SHALL BE COORDINATED W ITH THE OW NER AND ARC HITECT.
E. SMOKING SHALL BE PROHIBITED.
F. DEVELOPANDENFORCESTORAGE,HOUSEKEEPING,ANDDEBRISREMOVALPROCEDURESTHATREDUCETHEFLAMMABLEAND
COMBUSTIBLE FIRE LOAD TO TH E LOW EST LEVEL NECESSARY FOR DAILY OPERATIONS.
G. IOSHA REQUIRES MATERIAL SAFETV DATA SHEETS (MSDS) FOR ALL MATERIALS BEING USED OR STORED ON THIS PROJECT BE MADE
AVAILABLETOALLWORKERSONTHISJOBSITE COPIESMUSTBEPROVIDEDTOTHEOWNER'SDIRECTOROFSECURITY,IMMEDWTELV,
AS WORK BEGINS.
H. SECURE ALL TOOLS AND CONSTRUCTION MATERIALS DURING BREAKS AND NON-CONSTRUCTION HOURS.
SPECIFIC DEMOLITION NOTES
iO REMOVE EXISTMG SHIELDMG WALL IN ITS ENTIRETY, INCLUDMG ALLASSOCIATED DOORSAND WINDOWS.
2O REMOVE PORTION OF EXISTMG CORRIDOR WALL, 9'-0" WIDE X B'-0" TALL FOR DELIVERY OF MAGNET.
3O REMOVE EXISTING DOORAND FRAME IN ITS ENTIRETY
4O REMOVE PORTION OF EXISTMG WALL FOR NEW CONSTRUCTION. PATCH, REPAIR,AND PREPAREADJACENT SURFACES FOR NEW
FINISHES
SO REMOVE EXISTING CASEWORK IN ITS ENTIRETV
6O REMOVE EXISTING CASEWORK IN ITS ENTIRETYAND SALVAGE PoR REINSTALLATION IN NEW CONSTRUCTION
OREMOVE LAY-IN CEILING AND BULKHEADS IN ITS ENTIRETY
8O REMOVE FLOORING IN ITS ENTIRETV
9O EQUIPMENT TO BE REMOVED BY VENDOR
10 TEMPORARYCONSTRUCTIONCONTAINMENTBARRIERWITHLATCHINGDOOR
11 TEMPORARYCONSTRUCTIONCONTAINMENTBARRIER
12 REMOVECARDREADERANDRETURNTOOWNERFORREUSE.
a�
�
e w
�9 �
o=
n�
�, � i/i
� o
N � U 'VJ
p� — 3 N
f6 U �i � UJ
� � � d �
e5�_
�ss
��o'�
e��` �"
���� l�i
d�✓
O O W Q'=~
Zmys=x
�� .
REVISIONS
�
z
w
N �
M w �
m V4 �
� � 2 �
_ �x ��.,
Z � � Q O
xzoav
� � Z W Z
J = � —
w�azw
_ � W �p rL
�J = r
� W ? � U
c
0
o ��
.'�"�r � �. �� �.
� �d,�
� �-e
L�-
�a��
@ a _
Y @ o=
�
W 6< E
� � �. _
LL
�
DEMOLITION
FLOOR PLAN
D1.01
�