Loading...
HomeMy WebLinkAboutE-102ELECTRICAL DIMENSION PLAN SCALE: 1 — � POWER SCHEDULE ALL CONOUIiS PN� WIRES SIZES MV51 BE �Bw' � WWE 4 GR�ONO WYE o[rcauw[o ar rxc [�craic�� c�+cwcca OP RECORD PEft NEC M'0 i0 wJNiAIN SIEMENS IMPE�ANCE REOUIREMEMS. E%AM RO�A1 CONiPOL EOl11PMENT �- ROOM ROOM PO I PO PO � MP Rr woow 1 ri�rzRs ro ec �urzuisHco nHo InSfPLLEo BY NOiE pt swcwie�c uR aRrnrcew eva E�ccmowcs LOMMCTOP QRCIIR POWER CRBWET SOOftLE SVPPLIEO PN� wsuim er SIEAIENS ITEM OTV �ESCRIPTION MP 1 MAIN PANEL WIiH MAIN 6REANER FLUSH OR SURFACE MOl1NTED. A 1 MR SYSTEM BREANER MUST HAVE TRIPPING DEVICE SO WMEN ANY EPO IS PRESSED iHE BREAKER iRIPS. MR BREAKER AMPS: SEE POWER REQIIIREMENTS VOLTS PHASES NEl1TRAL GROl1ND TOTAL WIRES 4B0 3 0 1 4(NOtE 1) 1) ALL WIRES MUST BE SAME SIZE. NOTE UNLE55 OTHERW6E NOTE� ALL BREAKERS WILL BE 80% RATED. EPO VARIES NOTE 1- EPO CIRCUR �j1 MAIN CIRCWT 6REAKER EMERGENCV POWER OFF Bl1TTON WITH PROTECTIVE COVER THAT PREVEMS ACCIDEMAL ACTIVATION. THE EPO MUST BE OF FAIL-SAFE DESIGN, ALL EPOs t0 HAVE MECHANICAL LAiCMING MECHANISM. EPO MUST BE RESET BEFORE MR 6REAKER CAN RESUME OPERAiION. WNiACiS AN� WIRING CONFIGURATION TO BE DESIGNED BV ELECTRICAL ENGINEER OF RECOR�. THE EPOs M115T BE INSTALLED BV A pUALIFIED ELECTRICAL CONTRACTOR ACCOR�ING TO NATIONAL ELECTRICAL CODE, STATE AND LOCAL REGULATIONS. THE CUSTOMER IS SOLELY RESPONSIBLE FOR THE IMPLEMENiAtION OP iHE EPOs AND iHEIR ASSOQAiE� CIRCUITS AND MUST MAKE THE FlNAL DEfERMINATION CONSIDERING ALL SITE CONDITIONS AND REGUUTORV FACTORS. UNLE55 OtHERWISE NOiED. ALL ItEMS L14ED IN iH15 SCHEDULE SHALL BE Sl1PPLIED ANO INSTALLE� 6Y CUSTOMER/CONTRACTOR. REV 0 POWER QUALITY NOTES 1) IT IS THE CUSTOMER'S RESPONSIBILIiY W COMPLY WITH THE POWER QUALIiY REQUIREMENTS FOR SIEMENS MEDICAL SYSTEMS EQIIIPMENi. 2) THE ELECTRICAL FEEDER TO THE SIEMENS MEDICAL SVSTEMS EpUIPMEM MUST PEE� ONLV THE IMAGING SYSTEM AN� BE KEPT SEPARATE FROM ELECTRICAL PEE�ERS TO HVAC, MOTORS, PUMPS, COMPRESSORS, ELEVAtORS, AND OtHER POtENtIAL SOURCES OF ELECTRICAL INTERFERENCE. 3) THE ELECTRICAL FEEDER TO THE IMAGING SYSTEM MUST BE Rl1N �IRECTLV TO A MAM FAQLIiV �ISTRIBUTION PANEL OR TO THE FAQLITY SERVICE ENTRANCE, WITH NO OTHER LOADS POWERE� FROM iH6 FEE�ER. 4) IN OR�ER TO COMPLY WITH IMAGING SYSTEM POWER Ql1ALIN REpUIREMENTS, A�DITIONAL POWER CONDITIONING DEVICES MAV BE REpUIRED. E%AMPLES INCWDE VOLTAGE REGUTATORS, iRANSFORMERS. SURGE PROiECiIVE DEVICES, FlLiERS, AND/OR 11NIMERRUPTIBLE POWER SUPPLIES (11P5). RECOMMEN�ED FOR THE INSTALLATION OF ELECTRONIC EOUIPMENT CAN BE FOUND IN IEEE STAN�ARD 1100-1999 "POWERING AND GROUNDING ELECTROMC EpUIPMENT: 5) POWER CONDIiIONING �EVICES NOt APPROVED BY SEMENS MEDICAL SYSTEMS MAV NOT BE COMPATIBLE WITH THE MAGNETOM SVSTEM. "FERRORESONANT" POWER CONDRIONING EpUIPMENT RE-APPLIED PROM PREVIOUS GENERATION SYSTEMS IS AL50 GENERALLY EXCLUDE� DUE i0 HIGHER POWER REQUIREMENiS OF iHE NEWER SV4EM5. 6) INCOMING SOl1RCE POWER WIRES MUST BE SEPARATED FROM ANV SIEMENS CABLING BV A MINIMUM OF 17'. REV 0 CEILING HEIGHTS MAGNEf EXAMINATION ROOM: 7�-� ��� MINIMUM EouiPMENt RooM: 7'-3" MINIMUM au nNa�uRr arz�.s: 6'-11" MINIMUM REV 0 RELEASED FOR CONSTRl1CTI0N Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel �,:,,,��,,,��ti�� N T I O N � onrE: 12/02/19 POWER REQUIREMENTS VOLiAGE VARIAilON:480 VAC t10% FOR ALL LWE AN� LOA� WN�IilONS VOLTAGE 11NBALANCE 2% MAXIMl1M DIFFERENCE BETWEEN PHASES FREQUENCY: 60 Hz 3 1.0 Hz LINE IMPEDENCE <150 mOHMS POWER CONSUMPTION READV FOR MEASUREMENT 8.35kW/1.8kW CHILLER/SEP POWER CONSl1MPilON iVPICAL EXAM CMLLER/SEP DA2kW/1.8kW CONNECTION VAWE B4 kVA MOMENTARV POWER 135 kVA MR SYSiEM BREAKER SRE (A) 150 A ALL BREAKERS ARE RATED AT 809, POWER QUALITY POOR POWER WILL ALTER EQUIPMENT PERFORMANCE IT IS M THE CUSTOMER'S IMEREST THAT THE ELECTRICAL CONiRACiOR BE RESPONSIBLE POR iES71NG AN� VERIFYING THAT THE EQUIPMENT POWER SUPPLY COMPLIES WITH THE SIEMENS SPECIFICATIONS. DEMAND AND CAPACITY 1� IF E�IIIPMENi UPGRA�E IS ANiICIPAiE�, INSiALLING ELECiRICAL POWER TO MEEf THE REOUIREMENTS OF THE HIGHER POWER GRA�IENT PACKAGE AT THE TIME OF IWTIAL WSTALUTION WILL REDUCE 7HE COSi i0 UPGRADE iHE ELECiRICAL SYStEM LAiER. 2) RECOMMENDED TRANSFORMER 9ZE (SKTEM WITHOUT UPS) IS BASED ON INDUSTRY STANDARD ISOLATION TRANSFORMER KVA RATINGS. SOURCE IMPEDANCE FEEDING THE MAGNEfOM SYSTEM, INCWDING ANY ISOV+tION iRANSPORMERS. MUSt MEEf EOUIPMENi RE�UIREMEN75 AS L14ED HERE 9EMEN5 RECOMMENDS A TRANSFORMER WITH COPPER WINDINGS, AN ELECTRO—STATIC SHIELD, AND A LOW IMPEDANCE (<3%) TO ENSURE THAT SOURCE IMPEDANCE REQUIREMENTS ARE MEf. 3) OVER CURRENi PROiECiION IS SPECIFlE� FOR SV4EM5 WIiHOUi AN UNINTERRUPTIBLE POWER Sl1PPLV (11P5). A�DITION OF A UPS REpUIRES A HIGHER CAPACIiY MAINS WNNECTION (DEPEN�ENT UPON UPS MO�EL AN� SRE). MAXIMUM FAULT CURRENT IS DEPENDENT UPON THE IMPE�ANCE OF THE FACILIIV ELECTRICAL SVSTEM. THE CUSiOMER'S ARCHIiECi OR ELECiRICAL CON7RACi0R i0 SPECIFY AIC RATING OF OVER CURRENT PROTECTION BASED ON FACILITV IMPEDANCE CHARACTERISTICS. 4) MOMENiARV POWER IS BASE� ON A MAXIMUM RMS VALUE FOR A PERIOD NOT TO EXCEED FIVE (5) SECONDS, AS �EFlNED IN NEC. 51]2 STAND—BY AN� AVERAGE CURRENT ARE SUBSTANTIALLY LOWER. 5) iHE CON�l1CiOR SRE SHOUL� BE SELECiE� i0 MEEf iHE VOLTAGE DROP REOUIREMENTS, TAKING INTO CONSIDERATION THE MAINS CAPACITY, RUN LENGTH, AN� ANV ADDITIONAL TRANSFORMERS USE� TO OBTAIN THE PROPER EQUIPMEM VOLTAGE LEVEL NEMA SiAN�ARD %R-9-1989 (R1994,R2000) PROVIDES GENERAL GUIDELMES FOR SIZING CONDUCTORS, TRANSFORMERS, AN� ELECTRICAL SYSTEMS FOR MEDICAL IMAGING SYSTEMS. 6) LONG—TIME POWER IS BASE� ON THE HIGHE4 AVERAGE RMS VALUES FOR A PERIOD EXCEEDING 5 MINUiES OURING CLINICAL SVSTEM OPERATION, AS DEFINED IN NEC 51Z2. ]) A CIRCUR BREAKER WITH A HIGH INRUSH RATING (>Bx RATED CURRENi) IS REQUIRED i0 PERMIi SWIiCH—ON OF iHE UPS SY4EM WIiHOIIi SPURIOl15 iRIPPING. CIRCUIi BREAKERS WRH AN ADJUSTABLE MAGNETIC TRIP (SIEMENS F�6 SERIES OR SIMILAR) ARE HIGHLY RECOMMEN�ED. REV 1 ELECTRICAL INSTALLATION NOTES 1) INSiALL 7HE MR SY4EM QRCUIt BREAKER IN OR NEAR iHE E�UIPMENT ROOM. THE PERMITTED FRINGE FlELD FOR THE PANEL IS UP TO 3mT. IF THE FRINGE FIELDS HAVE HIGHER VAWES, MAGNEiIC SMELDING MUST BE PROVI�ED OR THE DISTANCE FROM THE MAGNEi MU4 BE INCREASED. 2) AN ACCEPTABLE MEANS FOR SWITCHING MAIN POWER ON AND OFF SHOULD BE INSTALLED IN THE MAIN BREAKER PANEL INSTALL EMERGENCY SHUTDOWN BUITONS W EACH ROOM WHERE THERE IS 9EMEN5 EpUIPMENi. 3) THE ELECTRICAL FEEDER TO THE 9EMENS EpUIPMENT MUST FEED ONLV THE IMAGING SYSTEM AN� BE KEPT SEPARATE FROM ELECiRICAL FEEDERS i0 HVAC, MOi0R5, PUMPS, COMPRESSORS, ELEVA?ORS AN� OiHER POiENiIAL SOURCES OF ELECiRICAL INTERFERENCE. 4) THE EMERGENCY POWER OFF (EPO) BUITONS ARE TO BE MUSHROOM tYPE WIiH PUSM LOCK AND PULL i0 RELEASE. 5) WALL RECEPTACLES MA�E OF FERROMAGNETIC MATERIALS ARE NOT PERMIITE� M THE EXAM ROOM. PERIPHERAL UNITS (SUCH AS VENTILATORS) NOT APPROVED FOR USE IN A HIGH MAGNEfIC FlEL� ENVIRONMENi CAN WFWENCE THE MAGNEfIC FlEL�, COMPROMISING IMAGE OUALIN. THE CUSTOMER IS RESPONSIBLE FOR INSTALLATION AND USE OP RECEPTACLES IN THE E%AM ROOM. INSTALLATION OF RECEPTACLES AND THE FlLTERS REQUIRED ARE TO BE COORDINATED WIiH iHE RF SMELDING SUPPLIER. 6) THE RF SHIELD Ml1ST BE Fl1TE� WRH A GROl1ND STII� OR BUS BAR, LOCATED WITHW 24' OF THE AU%ILIARY FlLTERS FOR ROOM LIGHTS AND OUTLEiS, SUPPLIED AND INSTALLE� BY THE RF SMELD SUPPLIER. ]) IN OR�ER TO PREVENT GROUN� LOOPS, ALL CUSTOMER OR CUSTOMER/CONTRACTOR SUPPLIED AC POWER ENTERING THE EXAMINAtION ROOM Q.E OUtLEfS, EPQ EfC.) SHOULD BE SUPPLIE� VIA AN ISOLA110N ?RANSFORMER. iHE ISOLAiION TRANSFORMER SECONDARY WIN�ING GROl1ND CONDUCTOR SHOULD BE CONNECTE� TO THE RF SMEL� GROUND STU� OR BUS BAR. SEE NOTE 6 ABOVE AND THE AU%ILIARY AC POWER FOR EXAMINAiION ROOM �EfAIL. R� a GROUNDING NOTES EQUIPMENT GROUND CONDUCTOR TO COMPLY WITH THE FOLLOWING: 1) SIZED EQUIVALENi i0 1HE PHASE CONDUCTORS (FULL SREO GROUN�). 2) DERIVED FROM THE ELECTRICAL SERVICE, TRANSFORMER OR MAIN DISTRIBUTION PANEL FEE�ING THE SIEMENS EQUIPMENT. 3) RUN IN THE SAME CONDUIT, TROUGH OR RACEWAY AS THE PHASE CONDUCTORS. 4) CONTINUOUS, WITH NO BREAKS OR USE OF CONDUIT, CHASSIS OR EARiH AS THE SOLE GROUNDING PAiH. 5) BONDED TO CHASSIS AND/OR CONDUIT IN ACCOROANCE WITH THE NEC REOUIREMENTS. 6) MINIMIZE CONNECTIONS OR TERMINALS TO ENSURE WNTINUIN OVER THE LIFE OF THE WSTALL4TION. 7) AS A NORM, THERE SHOUL� NOi BE ANY CURRENi PRESENCE ON iHE GROUN� CONDUCIOR, BUi IT IS ACCEPiABLE i0 HAVE <SOOmA DURING OPERAiION OF THE IMAGING EQUIPMENT. MR GROUNDING NOTES THE WTERNAL GROUN� WIRING OF THE MR SYSTEM MUST BE INSIALLED WIiH MINIMUM GROUND LOOPS. iH15 IS 10 PREVENt NOISE CURRENTS AND GENERAL DISTURBANCES FROM FLOWING THROUGH THE GROUNDING PATH. t0 ACHIEVE SUCH GROUN�ING, iHREE MAJOR GROUN� POINiS sHou�o ee useo. 1 ON-SITE POWER �ISiRIBIIiION PANEL EXTERNAL MAIN GROUND BUS UPS CHILLER _ _ (oarioNn�� _ (oarioNn�) SIEMENS ELECTRONIC CABINEf (ACC/CCA/ ECA/EPC) MAIN GROl1ND CONNECTION FOR ALL SYSTEM COMPONENTS � MRC CONSOLE �COOLING EQUIPMENT (SEP/RCA/EFU) R� PANEL 3 RF ROOM Q1 09�06�19 COMPLEfE NEW IAYOUT BPSED ON lAlESi WALL BACKGROONOS Qo oe/z�/is �sonaoru ontEo oa/s�/is f3PPtlrEO BI CI1S70YERS FOR FlNPLS w i. iuF u.a i F H i��.1 miiH -..- i �iF��. i-.t- i i rdii � ;;;:r, H i .. i F:�c�.iF•c�i'.r, i iuii i�,.i u i .. i FF iinF vi SVM DATE DESCRIPTION 1 i � i rF i n. i E F �:.�r i 1 i.:r, i..i.i1 F1rF�c1 Ni i i i �.:F n i u �. i u �i6i w.-: er�i�u i e� i e'. r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i � i, o-i i r ��v m mi i� eF�- F , i:n iii ii i� �s i� i m _m.�vui ii i iiai,.m H u,i�i -i v.,iii. ��� i i i i. ,vi�i� F^ii^ i i vF.i u n. —ISSUE BLOCK— VIDA REV 8 - G�-i� "�-F Tf Ilu f�=�G- �� " SIEMENS �'�. , � _ � r, _ IU HEALTH NORTH HOSPITAL 11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032 MRI ROM �JB132 - MAGNEfOM VI�A VIOA XQ GRADIENTS ��� F -« : � �� PRo�Ecr #: sHEEr: -.. . TI � �I . i..� _ /� ��` � � : �� � � '1 90'1 780 nlll= ■ � F i� �TF F i,s. C / ALL RIGHTS ARE RESERVED. sNeEr ov oRnwN er: L 1 O L 7 10 D. BRISiOE SCn�Es NOTED REF. y: �niE: 7-PZZCYK 09/O6/19