HomeMy WebLinkAboutE-102ELECTRICAL DIMENSION PLAN
SCALE: 1
— �
POWER SCHEDULE
ALL CONOUIiS PN� WIRES SIZES MV51 BE �Bw' � WWE 4 GR�ONO WYE
o[rcauw[o ar rxc [�craic�� c�+cwcca
OP RECORD PEft NEC M'0 i0 wJNiAIN
SIEMENS IMPE�ANCE REOUIREMEMS.
E%AM RO�A1 CONiPOL EOl11PMENT
�- ROOM ROOM
PO I PO PO
� MP
Rr woow 1
ri�rzRs ro ec
�urzuisHco nHo
InSfPLLEo BY NOiE pt
swcwie�c uR aRrnrcew eva E�ccmowcs
LOMMCTOP QRCIIR POWER CRBWET
SOOftLE SVPPLIEO PN�
wsuim er
SIEAIENS
ITEM OTV �ESCRIPTION
MP 1 MAIN PANEL WIiH MAIN 6REANER FLUSH OR SURFACE
MOl1NTED.
A 1 MR SYSTEM BREANER MUST HAVE TRIPPING DEVICE SO
WMEN ANY EPO IS PRESSED iHE BREAKER iRIPS.
MR BREAKER AMPS: SEE POWER REQIIIREMENTS
VOLTS PHASES NEl1TRAL GROl1ND TOTAL WIRES
4B0 3 0 1 4(NOtE 1)
1) ALL WIRES MUST BE SAME SIZE.
NOTE UNLE55 OTHERW6E NOTE� ALL BREAKERS WILL BE 80% RATED.
EPO VARIES NOTE 1- EPO CIRCUR �j1
MAIN CIRCWT 6REAKER EMERGENCV POWER OFF Bl1TTON
WITH PROTECTIVE COVER THAT PREVEMS ACCIDEMAL
ACTIVATION. THE EPO MUST BE OF FAIL-SAFE DESIGN,
ALL EPOs t0 HAVE MECHANICAL LAiCMING MECHANISM.
EPO MUST BE RESET BEFORE MR 6REAKER CAN
RESUME OPERAiION. WNiACiS AN� WIRING
CONFIGURATION TO BE DESIGNED BV ELECTRICAL
ENGINEER OF RECOR�.
THE EPOs M115T BE INSTALLED BV A pUALIFIED
ELECTRICAL CONTRACTOR ACCOR�ING TO NATIONAL
ELECTRICAL CODE, STATE AND LOCAL REGULATIONS.
THE CUSTOMER IS SOLELY RESPONSIBLE FOR THE
IMPLEMENiAtION OP iHE EPOs AND iHEIR ASSOQAiE�
CIRCUITS AND MUST MAKE THE FlNAL DEfERMINATION
CONSIDERING ALL SITE CONDITIONS AND REGUUTORV
FACTORS.
UNLE55 OtHERWISE NOiED. ALL ItEMS L14ED IN iH15 SCHEDULE SHALL
BE Sl1PPLIED ANO INSTALLE� 6Y CUSTOMER/CONTRACTOR.
REV 0
POWER QUALITY NOTES
1) IT IS THE CUSTOMER'S RESPONSIBILIiY W COMPLY WITH THE
POWER QUALIiY REQUIREMENTS FOR SIEMENS MEDICAL SYSTEMS
EQIIIPMENi.
2) THE ELECTRICAL FEEDER TO THE SIEMENS MEDICAL SVSTEMS
EpUIPMEM MUST PEE� ONLV THE IMAGING SYSTEM AN� BE KEPT
SEPARATE FROM ELECTRICAL PEE�ERS TO HVAC, MOTORS, PUMPS,
COMPRESSORS, ELEVAtORS, AND OtHER POtENtIAL SOURCES OF
ELECTRICAL INTERFERENCE.
3) THE ELECTRICAL FEEDER TO THE IMAGING SYSTEM MUST BE Rl1N
�IRECTLV TO A MAM FAQLIiV �ISTRIBUTION PANEL OR TO THE
FAQLITY SERVICE ENTRANCE, WITH NO OTHER LOADS POWERE� FROM
iH6 FEE�ER.
4) IN OR�ER TO COMPLY WITH IMAGING SYSTEM POWER Ql1ALIN
REpUIREMENTS, A�DITIONAL POWER CONDITIONING DEVICES MAV BE
REpUIRED. E%AMPLES INCWDE VOLTAGE REGUTATORS,
iRANSFORMERS. SURGE PROiECiIVE DEVICES, FlLiERS, AND/OR
11NIMERRUPTIBLE POWER SUPPLIES (11P5). RECOMMEN�ED FOR THE
INSTALLATION OF ELECTRONIC EOUIPMENT CAN BE FOUND IN IEEE
STAN�ARD 1100-1999 "POWERING AND GROUNDING ELECTROMC
EpUIPMENT:
5) POWER CONDIiIONING �EVICES NOt APPROVED BY SEMENS
MEDICAL SYSTEMS MAV NOT BE COMPATIBLE WITH THE MAGNETOM
SVSTEM. "FERRORESONANT" POWER CONDRIONING EpUIPMENT
RE-APPLIED PROM PREVIOUS GENERATION SYSTEMS IS AL50
GENERALLY EXCLUDE� DUE i0 HIGHER POWER REQUIREMENiS OF
iHE NEWER SV4EM5.
6) INCOMING SOl1RCE POWER WIRES MUST BE SEPARATED FROM ANV
SIEMENS CABLING BV A MINIMUM OF 17'.
REV 0
CEILING HEIGHTS
MAGNEf EXAMINATION ROOM: 7�-� ��� MINIMUM
EouiPMENt RooM: 7'-3" MINIMUM
au nNa�uRr arz�.s: 6'-11" MINIMUM
REV 0
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
�,:,,,��,,,��ti�� N T I O N
�
onrE: 12/02/19
POWER REQUIREMENTS
VOLiAGE VARIAilON:480 VAC t10% FOR ALL LWE AN� LOA� WN�IilONS
VOLTAGE 11NBALANCE 2% MAXIMl1M DIFFERENCE BETWEEN PHASES
FREQUENCY: 60 Hz 3 1.0 Hz
LINE IMPEDENCE <150 mOHMS
POWER CONSUMPTION READV FOR MEASUREMENT 8.35kW/1.8kW
CHILLER/SEP
POWER CONSl1MPilON iVPICAL EXAM CMLLER/SEP DA2kW/1.8kW
CONNECTION VAWE B4 kVA
MOMENTARV POWER 135 kVA
MR SYSiEM BREAKER SRE (A) 150 A
ALL BREAKERS ARE RATED AT 809,
POWER QUALITY
POOR POWER WILL ALTER EQUIPMENT PERFORMANCE
IT IS M THE CUSTOMER'S IMEREST THAT THE ELECTRICAL
CONiRACiOR BE RESPONSIBLE POR iES71NG AN� VERIFYING
THAT THE EQUIPMENT POWER SUPPLY COMPLIES WITH THE
SIEMENS SPECIFICATIONS.
DEMAND AND CAPACITY
1� IF E�IIIPMENi UPGRA�E IS ANiICIPAiE�, INSiALLING ELECiRICAL
POWER TO MEEf THE REOUIREMENTS OF THE HIGHER POWER
GRA�IENT PACKAGE AT THE TIME OF IWTIAL WSTALUTION WILL
REDUCE 7HE COSi i0 UPGRADE iHE ELECiRICAL SYStEM LAiER.
2) RECOMMENDED TRANSFORMER 9ZE (SKTEM WITHOUT UPS) IS
BASED ON INDUSTRY STANDARD ISOLATION TRANSFORMER KVA RATINGS.
SOURCE IMPEDANCE FEEDING THE MAGNEfOM SYSTEM, INCWDING ANY
ISOV+tION iRANSPORMERS. MUSt MEEf EOUIPMENi RE�UIREMEN75 AS
L14ED HERE 9EMEN5 RECOMMENDS A TRANSFORMER WITH COPPER
WINDINGS, AN ELECTRO—STATIC SHIELD, AND A LOW IMPEDANCE (<3%)
TO ENSURE THAT SOURCE IMPEDANCE REQUIREMENTS ARE MEf.
3) OVER CURRENi PROiECiION IS SPECIFlE� FOR SV4EM5 WIiHOUi
AN UNINTERRUPTIBLE POWER Sl1PPLV (11P5). A�DITION OF A UPS
REpUIRES A HIGHER CAPACIiY MAINS WNNECTION (DEPEN�ENT UPON
UPS MO�EL AN� SRE). MAXIMUM FAULT CURRENT IS DEPENDENT
UPON THE IMPE�ANCE OF THE FACILIIV ELECTRICAL SVSTEM. THE
CUSiOMER'S ARCHIiECi OR ELECiRICAL CON7RACi0R i0 SPECIFY
AIC RATING OF OVER CURRENT PROTECTION BASED ON FACILITV
IMPEDANCE CHARACTERISTICS.
4) MOMENiARV POWER IS BASE� ON A MAXIMUM RMS VALUE FOR
A PERIOD NOT TO EXCEED FIVE (5) SECONDS, AS �EFlNED IN NEC.
51]2 STAND—BY AN� AVERAGE CURRENT ARE SUBSTANTIALLY
LOWER.
5) iHE CON�l1CiOR SRE SHOUL� BE SELECiE� i0 MEEf iHE
VOLTAGE DROP REOUIREMENTS, TAKING INTO CONSIDERATION THE
MAINS CAPACITY, RUN LENGTH, AN� ANV ADDITIONAL TRANSFORMERS
USE� TO OBTAIN THE PROPER EQUIPMEM VOLTAGE LEVEL NEMA
SiAN�ARD %R-9-1989 (R1994,R2000) PROVIDES GENERAL
GUIDELMES FOR SIZING CONDUCTORS, TRANSFORMERS, AN�
ELECTRICAL SYSTEMS FOR MEDICAL IMAGING SYSTEMS.
6) LONG—TIME POWER IS BASE� ON THE HIGHE4 AVERAGE RMS
VALUES FOR A PERIOD EXCEEDING 5 MINUiES OURING CLINICAL
SVSTEM OPERATION, AS DEFINED IN NEC 51Z2.
]) A CIRCUR BREAKER WITH A HIGH INRUSH RATING (>Bx RATED
CURRENi) IS REQUIRED i0 PERMIi SWIiCH—ON OF iHE UPS SY4EM
WIiHOIIi SPURIOl15 iRIPPING. CIRCUIi BREAKERS WRH AN
ADJUSTABLE MAGNETIC TRIP (SIEMENS F�6 SERIES OR SIMILAR) ARE
HIGHLY RECOMMEN�ED.
REV 1
ELECTRICAL INSTALLATION NOTES
1) INSiALL 7HE MR SY4EM QRCUIt BREAKER IN OR NEAR iHE
E�UIPMENT ROOM. THE PERMITTED FRINGE FlELD FOR THE PANEL
IS UP TO 3mT. IF THE FRINGE FIELDS HAVE HIGHER VAWES,
MAGNEiIC SMELDING MUST BE PROVI�ED OR THE DISTANCE FROM
THE MAGNEi MU4 BE INCREASED.
2) AN ACCEPTABLE MEANS FOR SWITCHING MAIN POWER ON AND
OFF SHOULD BE INSTALLED IN THE MAIN BREAKER PANEL INSTALL
EMERGENCY SHUTDOWN BUITONS W EACH ROOM WHERE THERE IS
9EMEN5 EpUIPMENi.
3) THE ELECTRICAL FEEDER TO THE 9EMENS EpUIPMENT MUST
FEED ONLV THE IMAGING SYSTEM AN� BE KEPT SEPARATE FROM
ELECiRICAL FEEDERS i0 HVAC, MOi0R5, PUMPS, COMPRESSORS,
ELEVA?ORS AN� OiHER POiENiIAL SOURCES OF ELECiRICAL
INTERFERENCE.
4) THE EMERGENCY POWER OFF (EPO) BUITONS ARE TO BE
MUSHROOM tYPE WIiH PUSM LOCK AND PULL i0 RELEASE.
5) WALL RECEPTACLES MA�E OF FERROMAGNETIC MATERIALS ARE
NOT PERMIITE� M THE EXAM ROOM. PERIPHERAL UNITS (SUCH AS
VENTILATORS) NOT APPROVED FOR USE IN A HIGH MAGNEfIC FlEL�
ENVIRONMENi CAN WFWENCE THE MAGNEfIC FlEL�, COMPROMISING
IMAGE OUALIN. THE CUSTOMER IS RESPONSIBLE FOR INSTALLATION
AND USE OP RECEPTACLES IN THE E%AM ROOM. INSTALLATION OF
RECEPTACLES AND THE FlLTERS REQUIRED ARE TO BE COORDINATED
WIiH iHE RF SMELDING SUPPLIER.
6) THE RF SHIELD Ml1ST BE Fl1TE� WRH A GROl1ND STII� OR BUS
BAR, LOCATED WITHW 24' OF THE AU%ILIARY FlLTERS FOR ROOM
LIGHTS AND OUTLEiS, SUPPLIED AND INSTALLE� BY THE RF SMELD
SUPPLIER.
]) IN OR�ER TO PREVENT GROUN� LOOPS, ALL CUSTOMER OR
CUSTOMER/CONTRACTOR SUPPLIED AC POWER ENTERING THE
EXAMINAtION ROOM Q.E OUtLEfS, EPQ EfC.) SHOULD BE
SUPPLIE� VIA AN ISOLA110N ?RANSFORMER. iHE ISOLAiION
TRANSFORMER SECONDARY WIN�ING GROl1ND CONDUCTOR SHOULD
BE CONNECTE� TO THE RF SMEL� GROUND STU� OR BUS BAR.
SEE NOTE 6 ABOVE AND THE AU%ILIARY AC POWER FOR
EXAMINAiION ROOM �EfAIL.
R� a
GROUNDING NOTES
EQUIPMENT GROUND CONDUCTOR TO COMPLY WITH THE
FOLLOWING:
1) SIZED EQUIVALENi i0 1HE PHASE CONDUCTORS (FULL
SREO GROUN�).
2) DERIVED FROM THE ELECTRICAL SERVICE, TRANSFORMER
OR MAIN DISTRIBUTION PANEL FEE�ING THE SIEMENS
EQUIPMENT.
3) RUN IN THE SAME CONDUIT, TROUGH OR RACEWAY AS THE
PHASE CONDUCTORS.
4) CONTINUOUS, WITH NO BREAKS OR USE OF CONDUIT,
CHASSIS OR EARiH AS THE SOLE GROUNDING PAiH.
5) BONDED TO CHASSIS AND/OR CONDUIT IN ACCOROANCE
WITH THE NEC REOUIREMENTS.
6) MINIMIZE CONNECTIONS OR TERMINALS TO ENSURE
WNTINUIN OVER THE LIFE OF THE WSTALL4TION.
7) AS A NORM, THERE SHOUL� NOi BE ANY CURRENi
PRESENCE ON iHE GROUN� CONDUCIOR, BUi IT IS
ACCEPiABLE i0 HAVE <SOOmA DURING OPERAiION OF THE
IMAGING EQUIPMENT.
MR GROUNDING NOTES
THE WTERNAL GROUN� WIRING OF THE MR SYSTEM MUST BE
INSIALLED WIiH MINIMUM GROUND LOOPS. iH15 IS 10 PREVENt
NOISE CURRENTS AND GENERAL DISTURBANCES FROM FLOWING
THROUGH THE GROUNDING PATH.
t0 ACHIEVE SUCH GROUN�ING, iHREE MAJOR GROUN� POINiS
sHou�o ee useo.
1 ON-SITE POWER
�ISiRIBIIiION PANEL EXTERNAL
MAIN GROUND BUS UPS CHILLER
_ _ (oarioNn�� _ (oarioNn�)
SIEMENS ELECTRONIC
CABINEf (ACC/CCA/
ECA/EPC) MAIN GROl1ND
CONNECTION FOR ALL
SYSTEM COMPONENTS
� MRC CONSOLE
�COOLING EQUIPMENT
(SEP/RCA/EFU)
R�
PANEL
3 RF ROOM
Q1 09�06�19 COMPLEfE NEW IAYOUT BPSED
ON lAlESi WALL BACKGROONOS
Qo oe/z�/is �sonaoru ontEo oa/s�/is
f3PPtlrEO BI CI1S70YERS FOR FlNPLS
w i. iuF u.a i F H i��.1 miiH -..- i �iF��. i-.t- i i rdii � ;;;:r, H i .. i F:�c�.iF•c�i'.r, i iuii i�,.i u i .. i FF iinF vi SVM DATE DESCRIPTION
1 i � i rF i n. i E F �:.�r i 1 i.:r, i..i.i1 F1rF�c1 Ni i i i �.:F n i u �. i u �i6i w.-: er�i�u i e� i e'.
r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i � i, o-i i r ��v m mi i� eF�- F , i:n
iii ii i� �s i� i m _m.�vui ii i iiai,.m H u,i�i -i v.,iii. ��� i i i i. ,vi�i� F^ii^ i i vF.i u n. —ISSUE BLOCK—
VIDA
REV 8
- G�-i� "�-F Tf Ilu f�=�G-
�� " SIEMENS
�'�. , � _ � r, _
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032
MRI ROM �JB132 - MAGNEfOM VI�A VIOA XQ GRADIENTS
��� F -« : � �� PRo�Ecr #: sHEEr:
-.. . TI � �I . i..� _ /�
��` � � : �� � � '1 90'1 780
nlll= ■ �
F i� �TF F i,s. C /
ALL RIGHTS ARE RESERVED. sNeEr ov oRnwN er: L 1 O L
7 10 D. BRISiOE
SCn�Es NOTED REF. y: �niE:
7-PZZCYK 09/O6/19