Loading...
HomeMy WebLinkAboutM-101NOTE: FOR THE HEAT OUTPUT (BTU/HR) OF ALL 9EMENS E�IIIPMENT SHOWN ON THIS PLAN, SEE THE "EpUIPMEM LEGEN�" ON SHEET A-101. 1 i I I ,, 1I4 �� I P. \ 2 �Y � � w''...... m, ISOCENTER ��� .� OF MAGNET � EXAM ROOM #B132 a �� CONTROL �� � � ROOM � "-,°, ° i �_� ii EQUIPMENT I I R��M ii II II II II II II �� II II I 24" X 24' SPACE, APPRO%IIAATELY 1t0" ABOVE FINiSHED FLOOR FOR CMLLEO WAiER PIPE iERMINAiION. CHILLED WATER SUPPLY CMLLER TO BE SUPPLIEq LOCATED AN� � INStALLED BY CUStOMER/WNiRACiOR. M-�o� REFER i0 MANl1FAC?l1RER�5 WFORMAiION MECHANICAL PLAN CHILLED WATER SUPPLY AND REfURN LWES TO BE SUPPLIED AND INStALLED BV CUSTOMER/CONTRACTOR. SEE DETAILS AND NOTES ON THIS SHEEf. SCALE: 1 /4'" = 1 ENVIRONMENTAL REQUIREMENTS 1) AIR CON�IiIONING IS i0 PROVI�E A?EMPERAtl1RE OF JPF 25F IN THE CONTROL & EQl11PMENT ROOMS 65'F-]t'F IN E%AM ROOM. REUTNE HUMIDIIV OF 40-607 (NON-CONDENSING) IS REpUIRE� E%AMINATION ROOM AND 40-80� (NON-CON�ENSING) IN ALL OTHER AREAS WHERE 9EMEN5 EQUIPMEM IS INSiALLED. iHESE WNDIiIONS ARE TO BE MEf AT ALL TIMES; 24 HOl1R5 A DAY, ] DAVS A WEEK. 2) A DEDICAtED AIR CON�IiIONING AND HUMI�IFlCAiION SY4EM IS RECOMMENDED FOR THE EXAM ROOM. A MINIMl1M AIR E%CHANGE RATE OF 6 TIMES PER HOUR POR THE EXAM ROOM IS REQUIRED. IT IS RECOMMENDE� TO INSTALL A FftESH AIR SYSTEM WRH 30%- 50� FRESH AIR INiAKE. AIR SUPPLY AN� REfURN ABOVE THE FlNISHED CEILING IN THE E%AM ROOM IS RECOMMENDED. EACH ROOM SHOULD HAVE A DEDICATE� CON?ROL AN� SENSOR i0 MONIiOR AN� A�JUSi iHE AIR. 3) THE HEAT INTO THE EXAM ROOM IS LE55 THAN 1Q236 BTII/HR. THE HEAT WTO THE EpUIPMENT ROOM IS LE55 THAN 3,412 BTU/HR. THIS HEAT DISSIPATION 6 FROM THE SIEMENS EOUIPMENT ONLY, Al1XILIARV SUPPOR? E�UIPMENi (ie. UPS) AN� LIGHiING M115i 9E CONSIDERED FOR TOTAL HEAT LOADS. 4) li IS IMPORiAM FOR FRESH AIR INiAKE SV4EM5 ID EXHAUS? AIR DIRECTLV OUT OF THE Bl11LDING. THE EXHAUST AIR MUST NOT BE �EFLECTED IMO ANOTHER ROOM. THE MAGNEi ROOM E%HAUST AIR SHOULD BE INSTALLED AT LEASr 6'-6"' ABOVE FlNISHE� FLOOR. 5) THE AIR MTAKE OF THE AIR CONDITIONING SVSTEM MUST NOT BE LOCATED IN THE VICINIIY OF THE QUENCH VEM E%HAUST. 6) IF THE INPUT DRAWS 11PON AIR FROM OUTSIDE THE 6111LDING, IT IS RECOMMENDED TO INSTALL AN ON-SITE FlLTER TO REMOVE DUST PARTI0.ES GREATER THAN 10 MICRONS. ]) DO NOT LOCATE ANV HVAC �IFFl15ER5 ABOVE THE MAGNET. THERE SHALL NOT BE AIR BLOWING DIRECTLY ON THE MAGNEf. � �EDICATED, STAND ALONE, CLOSED LOOP WAiER CHILLER OR FAQLIT' CEN7RAL CHILLED WATER SUPPLV TO MEEf REpUIREMENTS LISTED ON THIS SHEET. CHILLED WATER SYSTEM BYPASS WITH PULL SIZE PIPING TO INCWDE 3/4" MINIMUTA BOILER �RAIN AN� MINIMl1M 3/4' BYPA55 PIPE WIiH BALL VALVE AND 3/4" BOILER �RAIN WITH CAP. PROVI�E NLL SHUIDFF VALVES INSiALLED ON CHILLER SUPPLY AND RETURN LMES AT CMLLER. � VISUAL FLOW METER WITH GAl1GE -0� BALL VALVE n THERMOMETER WRH RANGE FROM 30'F 4Ti ro 9o•F (�ocnTEo NEnR sEa) 4 PRESSURE GAUGE WITH RANGE FROM 40 TO 110 PSI (LOCATED NEAR SEP) � BOILER DRAIN � FlLiER - ]00 MICRONS MINIMUM A BYPASS MAY BE BENEFlCIAL FOR MAINiENANCE PURPOSES. THE PIPE OR HOSE FROA1 THE CHILLE� WAiER SUPPLY i0 iHE SEP CABINEf MUST BE A MINIAIUlA 1-1/4'¢ TO MAIMAIN THE NNCTION OF THE WATER COOLING CIRCUIi. iHE CONNECiION lAlIST BE 1" NPT FElAALE THREAO FOR asKw sEa cneiNEr oR t-i/a'm Foa 60KW SEP CNBWEf. SHUT-0FF VALVES FOR SERVICING SEP CNBINEf. �6 F001 MA%. HWE LENGiH 1-1/4" MnLE THREAO PROVI�E� BV SIEIAENS FOR 60 kW SEP. 22 FOOT MAX. HWE LENGTH SEP GPA EPC SIEMENS Sl1PPLIED AND INSTALLE� CABWEiS NOTES: ALL PIPING AND PWMBING FlXTURES SHALL BE FURNISHED, INStALLED PRESSURE tE4E� AND CHARGE� BV iHE MECHANICAL CONTRACTOR PRIOR TO THE OELIVERV AND INSTALLATION OF THE SIEMENS SUPPLIED AND INSTALLED Epl11PMEM UNLESS SPEQFIED OTHERWISE. AT THE HIGHEST POWT OF THE WATER SUPPLV PIPE FROM THE CHILLER AN AUTOMATIC DEAERATION OEVICE (AIR VEM) WRH BALL VALVE MUST BE INSTALLED BY THE MECHANICAL COMRACTOR. SvSTEM MuST BE PROVEN TO BE FREE FROM LEAKAGE. THE MECHANICAL ENGMEER OF RECOR� SHALL BE ULTIMATELV RESPONSIBLE FOR THE SITE SPECIFlC DESIGN AND SPEQFlCATION OP THE MECHANICAL AN� PIPING SVSTEMS AS SHOWN AND SHALL BE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND NATIONAL CO�ES. ALL WORK SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR AND SHALL BE SUBJECT TO COMPLIANCE WITH ALL APPLICA6LE LOCAL, SiAiE AND NAiIONAL CO�ES. THE Sl1PPLY AND REfl1RN PIPES FROM THE CMLLED WATER SUPPLV W THE SEP MUST BE UBELED TO SHOW FLOW DIRECTION AND coNrENr (wnrER/c�rco�). � I PIPING SCHEMATIC FOR FACILITY PROVIDED CHILLED WATER I NONEE A CMLLE� WAiER Sl1PPLV IS REOUIRE� i0 iHE MRI SVS?EM 24 HOURS A DAV, VEAR ROUND FOR THE COLD HEAD AND GRADIENT SYSTEMS. THIS CAN BE PROVIDED BY A CEMRAL CHILLED WATER SUPPLY OR A SEPAftATE STAND ALONE CMLLER THAT MEEfS THE 4AiED RE�UIREMENiS. CHILLED WAiER CAN ALSO BE SUPPLIED BV A CHILLER PROVIDED BV 9EMENS. FOR 11SE WITH FACILIiV PROVIDE� CHILLED WATER, A SEP (SVSTEM SEPARATOR CABINET), MUST BE INCLU�ED WRH THE 9EMEN5 ORDER. THE PIPE SIZE BERYEEN THE WATER SUPPLY AND SEP MUST BE 1-1/4" MINIMUM; LARGER DIAMEfER PIPE MAY 6E RE�UIRE� DUE t0 LENGTH OF Rl1N. FLOW AND PRESSURE REOUIREMENTS M115T BE MEf. 2] GALLONS OF DISTILLED/DE-IOMZED WATER MUST BE PROVI�ED FOR FlLLING THE SECONDARV CHILLED WATER CIRCl11T. iHE SUPPLY AND REfURN CHILLED WAtER PIPES MUSi BE LABELE�. THE LOCATION OF THE LA6EL5 MUST BE AT ALL CONNECTION AND REFlLLING POINTS AND MUST CONTAW FLOW DIRECTION AND CONTEMS. ��//�/�ii � REV 0 - TEMPERATURE/HUMIDITY NONEE RELEASED FOR CONSTRl1CTI0N Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel �sv�� �\o�v�N�nA wl � onrE: 12/02/19 CEILING HEIGHTS MAGNEf EXAMINATION ROOM: 7�-� ��� MINIMUM EouiPMENt RooM: 7'-3" MINIMUM au nNa�uRr arz�.s: 6'-11" MINIMUM CHILLED WATER REQUIREMENTS WATER REpUIREMENTS TO BE MEASURED AT THE SEP CABWET. FLOW RATE 23J8-29.05 GPM WATER TEMPERATURE: 428'F - 92F BTU DISCHARGE TO THE WATER 204,911 BTU/HR WATER PRESSURE MAXIMUM 8] P51 LOSS OF PRESSURE FOR SEP CABINET <B.] P51 AT 29 GPM CHILLE� WAiER ACIDIiY RANGE 6 pH TO B pH CHILLE� WAiER QUALIIY 200 ppm CHLORWE 200 ppm Sl1PPHAIE FlLTRATION ]00 ym Q1 09�06�19 COMPLEfE NEW IAYOUT BPSED ON lAlESi WALL BACKGROONOS Qo oe/z�/is �sonaoru ontEo oa/s�/is f3PPtlrEO BI CI1S70YERS FOR FlNPLS N T I O N. �� �� � ��� �, � ���� �, � �,�� ��� . � �� �� � k- � �� � �, � aan H i i F �c�iF•c�cr i i ui i i�_� u i i FF i i ri F vi SVM DATE DESCRIPTION � � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ��r� ��� t�,��� ,�, � � r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i � i, o-i i r ��v m mi i� eF�- F i:n iii ii i� �s i� i m _m.�vui ii i iiai,.m H u,i�i -i v.,iii. ��� i i i i. ,vi�i� F^ii^ i i vF.i u n. —ISSUE BLOCK— MECHANICAL NOTES 1) THE AIR H.VA.C. SVSTEM MUST OPERATE FOR A MINIMUM OF 4B CONSECUTIVE HOURS PRIOR TO THE DELIVERY OF THE EQUIPMENT. 2) iHE FlLiERS MU4 BE CHANGED IMMEDIA7ELY PRIOR 70 7HE �ELIVERV OF iHE E�IIIPMEM. 3) SIEMENS REpUIRES THE USE OF A �EDICATED H.V.A.G SVSTEM FOR THE EQUIPMENT ROOM TO BE LOCATE�, SRED AN� SPECIFlED 6Y iHE MECHANICAL ENGWEER OP RECORD AND i0 BE SUPPLIE� AND INSTALLED BY THE MECHANICAL CONTRACTOR. 4) SIEMENS RECOMMENDS THAT THE CUSTOMER PROVI�E AND INSTALL AN 0%YGEN MONITORING SVSTEM WITH VISUAL AND AUDIBLE ALARMS TO INDICATE WHEN THE OXVGEN CONTAWED IN AMBIENT AIR FALLS BELOW PRE-PROGRAMMED SAFETV LEVELS WITH THE SENSOR TO BE LOCATED IN THE SCAN ROOM W THE AREA DESIGNATE� FOR CRVOGEN FlLLING. 5) THE SIEMENS ACTIVE SHIELDED MAGNET RECIRCULATES L1011l� HELIUM, ELIMINATING THE NEED FOR A �EDICATED CRVOGEN STORAGE AREA. THE RECIRCUUTING SYSTEM SIGMFlCANTLY REDUCES THE HELIUM "BOIL OFF". 7HE MAGNEf WILL REQUIRE OCCASIONAL FlLLING, A �ELNERY ROUiE FOR CRYOGEN �EWARS M115i 6E E4A9LISHE�. A MINIMl1M 36" CLEARANCE IS REOUIRED. aEv o FIRE CONTROL NOTES 1) 9EMEN5 HAS NO SPEQFlC REpUIREMENT FOR FlRE PROTECTION. FlRE PROTECTION REOUIREMENTS SHALL BE IN ACCORDANCE WITH LOCAL CO�ES AND CU40MER'S INSURANCE REOUIREMENiS. ALL FlRE PROTECTION SYSTEMS SHALL 6E DEFINED Bv THE ARCHITECT OF RECORD WITH DESIGN, SPECIFlCATION AND DETAILING OF THE FIRE PROTECTION SYSTEM BV THE MECHANICAL ENGMEER OF RECOR� IN ACCORDANCE WITH SIEMENS GUI�ELWES AS STATED HEREIN. THE e�ecraoNic eouiarneNt or rHe Ma systen+s wi�� eE onrnnceo er WATER, REDUCTION OR ELIMINATION OF WATER 115ED FOR FIRE SUPPRESSION WILL RE�UCE POTENTIAL WATER DAMAGE. PRE-ACTION MERT GAS, OR HALOCARBONS OR OTHER MEfHODS CAN RE�UCE OR ELIMINAiE WAiER. REPER i0 YOUR FlRE PROiECiION PROFESSIONAL. 2) THE USE OF SMOKE DETECTORS INSIDE OF THE MR EXAMINATION ft00M IS NOT RECOMMENDE�. SMOKE �EfECTORS, BY �ESIGN, CAN GENERAiE N06E iHAi MAV INiERFERE WItH iHE MRI EXAMINAiION AN� CAUSE IMAGE ARiIFACiS. IF iHE 115E OF A SMOKE �ErECiOR IN THE EXAMINATION ROOM IS MANDATED BV LOCAL REpUIREMENTS, SPECIAL NOISE TESTS MUST BE PERPORMED BV 9EMENS SERVICE AFTER THE MRI IS OPERATIONAL MRI EOUIPMENT PERFORMANCE PROBLEMS �llE r0 SMOKE �EfECiORS ARE rHE RESPON5161LItY OF THE CUSTOMER AND ARE NOT COVERED UNDER WARRANN OR SERVICE AGREEMENT. 3) ALL MAtERIAL USED INSIDE iHE MAGNEf ROOM SHALL BE NON-MAGNEfIC. SEE CONSTRl1CTI0N REQUIREMENTS. 4) ALL PENEfRATI0N5 IN THE RF CABIN/SHIEL� SHALL BE THROUGH A WAVE GUIDE TO BE EOUIPPED WITH A DIELECTRIC COUPLER ON aotH [Nos aF rHE wnvE cuioE. n�� wnvE cuio[s sHn�� eE DESIGNED, DETAILED AND SPECIFlED BY THE RF CABIN/SHIELD CONTRACTOR WITH ALL LOCATIONS TO BE DEiERMMED BV THE ARCHITECT AND MECHANICAL ENGWEER OF RECOR� TO BE EStABLISHED IN A PRE-PLANNING MEEfING PRIOR t0 iHE �ESIGN, SPECIFlCAiION, AN� FABRICAiION OF iHE RF CABIN/SHIEL�. 5) EACH ELECTRICAL PENETRATION OF THE RF CABIN/SHIELD FOR ELECTRICAL SERVICING OF THE FlRE PROTECTION SYSTEM SHALL BE iHROUGH AN RF FlLiER r0 6E SUPPLIE� BV tHE RF SMELD CONTRACTOR WITH FlLTER LOCATIONS TO 6E DEfERMINE� BY THE ARCHRECT AND THE ELECTRICAL ENGWEER OF RECORD TO BE ESTABLISHE� IN A PRE-PLANNING MEEfING PRIOR TO THE �ESIGN, SPEQFlCAiION AND FABRICAtION OF iHE RF CABIN/SMELD. 6) IT IS PERMISSIBLE TO Rl1N "BUCK PIPE" UP TO THE DIELECTRIC COUPLER ON THE OUTSIDE OF THE RF SHIELD. J) iHERE M115i BE NO GROl1N� WNNEC?IONS MA�E �l1RING iHE THE INSTALLATION OF EITHER THE PIPING OR ELECTRICAL FOR THE FlRE PROTECTION SYSTEM. 8) THE USE OF HALON IS NOT ACCEPTABLE. 9) THE LOCATION OF FIRE CONTROL SYSTEM COMPONENTS SHALL BE COORDINATED THROUGH THE ARCHITECT OF REWRD WITH ALL LOCATIONS TO BE COOR�INATED WITH SIEMENS EQUIPMENT LOCATIONS AS SHOWN ON iHE 1/4" SCALE EQUIPMENi LOCAtION PLAN. 10) THE FlRE CONTROL COMRACTOR SHALL VERIfY EpUIPMENT MOUNTING PROCE�URES AN� LOCATIONS ON ANV WALLS CONTAINING RF SHIELDING W17H iHE SIEMENS PROJECi MANAGER PRIOR i0 7HE COMMENCEMENi OF WORK. REV 1 COMPRESSOR LINE INSULATION COMPRESSOR LMES Rl1NNING FROM THE COMPRESSOR (OR SEP CABINEf) i0 iHE MAGNEf ARE INSUL1iE� BV 9EMEN5. ADDRIONAL INSUTAiION (ARMAFLE% OR EOUIVALENT) FOR NOISE RE�UCTION (CHIRPING) AIAY 6E REOUIRE�. A��ITIONAL INSULITION NOT PROVI�E� BY SIEMENS. REV 0 VIDA REV 8 - G�-i� "�-F Tf Ilu f�=�G- �� " SIEMENS �'�. , � _ � r, _ IU HEALTH NORTH HOSPITAL 11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032 MRI ROM �JB132 - MAGNEfOM VI�A VIOA XQ GRADIENTS ��� F -« : � �� PRo�Ecr #: sHEEr: -.. . TI � �I . i..� _ ��` � � : �� � � '1 90'1 780 nlll= F i� �TF F i,s. ALL RIGHTS ARE RESERVED. sNeEr ov oRnwN er: M 101 9 10 D. BRISiOE SCn�Es NOTED REF. 7-PZZCYK �AiE: 09/O6/19