HomeMy WebLinkAboutM-101NOTE: FOR THE HEAT OUTPUT (BTU/HR) OF ALL 9EMENS E�IIIPMENT
SHOWN ON THIS PLAN, SEE THE "EpUIPMEM LEGEN�" ON SHEET A-101.
1 i
I
I
,, 1I4 �� I
P.
\ 2
�Y
� �
w''...... m,
ISOCENTER ���
.�
OF MAGNET
�
EXAM
ROOM
#B132
a
��
CONTROL �� � �
ROOM � "-,°, °
i �_�
ii
EQUIPMENT I I
R��M ii
II
II
II
II
II
II
�� II
II
I
24" X 24' SPACE, APPRO%IIAATELY
1t0" ABOVE FINiSHED FLOOR FOR
CMLLEO WAiER PIPE iERMINAiION.
CHILLED WATER SUPPLY
CMLLER TO BE SUPPLIEq LOCATED AN� �
INStALLED BY CUStOMER/WNiRACiOR. M-�o�
REFER i0 MANl1FAC?l1RER�5 WFORMAiION
MECHANICAL PLAN
CHILLED WATER SUPPLY AND
REfURN LWES TO BE
SUPPLIED AND INStALLED BV
CUSTOMER/CONTRACTOR. SEE
DETAILS AND NOTES ON THIS
SHEEf.
SCALE: 1 /4'" = 1
ENVIRONMENTAL REQUIREMENTS
1) AIR CON�IiIONING IS i0 PROVI�E A?EMPERAtl1RE OF JPF 25F
IN THE CONTROL & EQl11PMENT ROOMS 65'F-]t'F IN E%AM ROOM.
REUTNE HUMIDIIV OF 40-607 (NON-CONDENSING) IS REpUIRE�
E%AMINATION ROOM AND 40-80� (NON-CON�ENSING) IN ALL OTHER
AREAS WHERE 9EMEN5 EQUIPMEM IS INSiALLED. iHESE WNDIiIONS
ARE TO BE MEf AT ALL TIMES; 24 HOl1R5 A DAY, ] DAVS A WEEK.
2) A DEDICAtED AIR CON�IiIONING AND HUMI�IFlCAiION SY4EM IS
RECOMMENDED FOR THE EXAM ROOM. A MINIMl1M AIR E%CHANGE
RATE OF 6 TIMES PER HOUR POR THE EXAM ROOM IS REQUIRED.
IT IS RECOMMENDE� TO INSTALL A FftESH AIR SYSTEM WRH 30%-
50� FRESH AIR INiAKE.
AIR SUPPLY AN� REfURN ABOVE THE FlNISHED CEILING IN THE E%AM
ROOM IS RECOMMENDED. EACH ROOM SHOULD HAVE A DEDICATE�
CON?ROL AN� SENSOR i0 MONIiOR AN� A�JUSi iHE AIR.
3) THE HEAT INTO THE EXAM ROOM IS LE55 THAN 1Q236 BTII/HR.
THE HEAT WTO THE EpUIPMENT ROOM IS LE55 THAN 3,412 BTU/HR.
THIS HEAT DISSIPATION 6 FROM THE SIEMENS EOUIPMENT ONLY,
Al1XILIARV SUPPOR? E�UIPMENi (ie. UPS) AN� LIGHiING M115i 9E
CONSIDERED FOR TOTAL HEAT LOADS.
4) li IS IMPORiAM FOR FRESH AIR INiAKE SV4EM5 ID EXHAUS?
AIR DIRECTLV OUT OF THE Bl11LDING. THE EXHAUST AIR MUST NOT
BE �EFLECTED IMO ANOTHER ROOM. THE MAGNEi ROOM E%HAUST
AIR SHOULD BE INSTALLED AT LEASr 6'-6"' ABOVE FlNISHE� FLOOR.
5) THE AIR MTAKE OF THE AIR CONDITIONING SVSTEM MUST NOT
BE LOCATED IN THE VICINIIY OF THE QUENCH VEM E%HAUST.
6) IF THE INPUT DRAWS 11PON AIR FROM OUTSIDE THE 6111LDING, IT
IS RECOMMENDED TO INSTALL AN ON-SITE FlLTER TO REMOVE DUST
PARTI0.ES GREATER THAN 10 MICRONS.
]) DO NOT LOCATE ANV HVAC �IFFl15ER5 ABOVE THE MAGNET.
THERE SHALL NOT BE AIR BLOWING DIRECTLY ON THE MAGNEf.
�
�EDICATED, STAND ALONE, CLOSED LOOP
WAiER CHILLER OR FAQLIT' CEN7RAL
CHILLED WATER SUPPLV TO MEEf
REpUIREMENTS LISTED ON THIS SHEET.
CHILLED WATER SYSTEM BYPASS WITH PULL SIZE PIPING TO
INCWDE 3/4" MINIMUTA BOILER �RAIN AN� MINIMl1M 3/4'
BYPA55 PIPE WIiH BALL VALVE AND 3/4" BOILER �RAIN
WITH CAP.
PROVI�E NLL SHUIDFF VALVES
INSiALLED ON CHILLER SUPPLY
AND RETURN LMES AT CMLLER.
� VISUAL FLOW METER WITH GAl1GE
-0� BALL VALVE
n THERMOMETER WRH RANGE FROM 30'F
4Ti ro 9o•F (�ocnTEo NEnR sEa)
4 PRESSURE GAUGE WITH RANGE FROM 40
TO 110 PSI (LOCATED NEAR SEP)
� BOILER DRAIN
� FlLiER - ]00 MICRONS MINIMUM
A BYPASS MAY BE BENEFlCIAL
FOR MAINiENANCE PURPOSES.
THE PIPE OR HOSE FROA1 THE CHILLE�
WAiER SUPPLY i0 iHE SEP CABINEf
MUST BE A MINIAIUlA 1-1/4'¢ TO
MAIMAIN THE NNCTION OF THE WATER
COOLING CIRCUIi. iHE CONNECiION
lAlIST BE 1" NPT FElAALE THREAO FOR
asKw sEa cneiNEr oR t-i/a'm Foa
60KW SEP CNBWEf.
SHUT-0FF VALVES FOR
SERVICING SEP CNBINEf.
�6 F001 MA%. HWE LENGiH
1-1/4" MnLE THREAO
PROVI�E� BV SIEIAENS FOR
60 kW SEP.
22 FOOT MAX. HWE LENGTH
SEP GPA EPC
SIEMENS Sl1PPLIED AND
INSTALLE� CABWEiS
NOTES:
ALL PIPING AND PWMBING FlXTURES SHALL BE FURNISHED,
INStALLED PRESSURE tE4E� AND CHARGE� BV iHE MECHANICAL
CONTRACTOR PRIOR TO THE OELIVERV AND INSTALLATION OF THE
SIEMENS SUPPLIED AND INSTALLED Epl11PMEM UNLESS SPEQFIED
OTHERWISE.
AT THE HIGHEST POWT OF THE WATER SUPPLV PIPE FROM THE
CHILLER AN AUTOMATIC DEAERATION OEVICE (AIR VEM) WRH BALL
VALVE MUST BE INSTALLED BY THE MECHANICAL COMRACTOR.
SvSTEM MuST BE PROVEN TO BE FREE FROM LEAKAGE.
THE MECHANICAL ENGMEER OF RECOR� SHALL BE ULTIMATELV
RESPONSIBLE FOR THE SITE SPECIFlC DESIGN AND SPEQFlCATION OP
THE MECHANICAL AN� PIPING SVSTEMS AS SHOWN AND SHALL BE IN
ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND NATIONAL
CO�ES. ALL WORK SHALL BE PERFORMED BY THE MECHANICAL
CONTRACTOR AND SHALL BE SUBJECT TO COMPLIANCE WITH ALL
APPLICA6LE LOCAL, SiAiE AND NAiIONAL CO�ES.
THE Sl1PPLY AND REfl1RN PIPES FROM THE CMLLED WATER SUPPLV
W THE SEP MUST BE UBELED TO SHOW FLOW DIRECTION AND
coNrENr (wnrER/c�rco�).
� I PIPING SCHEMATIC FOR FACILITY PROVIDED CHILLED WATER I NONEE
A CMLLE� WAiER Sl1PPLV IS REOUIRE� i0 iHE MRI SVS?EM 24
HOURS A DAV, VEAR ROUND FOR THE COLD HEAD AND GRADIENT
SYSTEMS. THIS CAN BE PROVIDED BY A CEMRAL CHILLED WATER
SUPPLY OR A SEPAftATE STAND ALONE CMLLER THAT MEEfS THE
4AiED RE�UIREMENiS. CHILLED WAiER CAN ALSO BE SUPPLIED BV
A CHILLER PROVIDED BV 9EMENS.
FOR 11SE WITH FACILIiV PROVIDE� CHILLED WATER, A SEP (SVSTEM
SEPARATOR CABINET), MUST BE INCLU�ED WRH THE 9EMEN5 ORDER.
THE PIPE SIZE BERYEEN THE WATER SUPPLY AND SEP MUST BE
1-1/4" MINIMUM; LARGER DIAMEfER PIPE MAY 6E RE�UIRE� DUE t0
LENGTH OF Rl1N. FLOW AND PRESSURE REOUIREMENTS M115T BE MEf.
2] GALLONS OF DISTILLED/DE-IOMZED WATER MUST BE PROVI�ED
FOR FlLLING THE SECONDARV CHILLED WATER CIRCl11T.
iHE SUPPLY AND REfURN CHILLED WAtER PIPES MUSi BE LABELE�.
THE LOCATION OF THE LA6EL5 MUST BE AT ALL CONNECTION AND
REFlLLING POINTS AND MUST CONTAW FLOW DIRECTION AND CONTEMS.
��//�/�ii �
REV 0
- TEMPERATURE/HUMIDITY NONEE
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
�sv�� �\o�v�N�nA wl
�
onrE: 12/02/19
CEILING HEIGHTS
MAGNEf EXAMINATION ROOM: 7�-� ��� MINIMUM
EouiPMENt RooM: 7'-3" MINIMUM
au nNa�uRr arz�.s: 6'-11" MINIMUM
CHILLED WATER REQUIREMENTS
WATER REpUIREMENTS TO BE MEASURED AT THE SEP CABWET.
FLOW RATE 23J8-29.05 GPM
WATER TEMPERATURE: 428'F - 92F
BTU DISCHARGE TO THE WATER 204,911 BTU/HR
WATER PRESSURE MAXIMUM 8] P51
LOSS OF PRESSURE FOR SEP CABINET <B.] P51 AT 29 GPM
CHILLE� WAiER ACIDIiY RANGE 6 pH TO B pH
CHILLE� WAiER QUALIIY 200 ppm CHLORWE
200 ppm Sl1PPHAIE
FlLTRATION ]00 ym
Q1 09�06�19 COMPLEfE NEW IAYOUT BPSED
ON lAlESi WALL BACKGROONOS
Qo oe/z�/is �sonaoru ontEo oa/s�/is
f3PPtlrEO BI CI1S70YERS FOR FlNPLS
N T I O N. �� �� � ��� �, � ���� �, � �,�� ��� . � �� �� � k- � �� � �, � aan H i i F �c�iF•c�cr i i ui i i�_� u i i FF i i ri F vi SVM DATE DESCRIPTION
� � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ��r� ��� t�,��� ,�, � �
r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i � i, o-i i r ��v m mi i� eF�- F i:n
iii ii i� �s i� i m _m.�vui ii i iiai,.m H u,i�i -i v.,iii. ��� i i i i. ,vi�i� F^ii^ i i vF.i u n. —ISSUE BLOCK—
MECHANICAL NOTES
1) THE AIR H.VA.C. SVSTEM MUST OPERATE FOR A MINIMUM OF 4B
CONSECUTIVE HOURS PRIOR TO THE DELIVERY OF THE EQUIPMENT.
2) iHE FlLiERS MU4 BE CHANGED IMMEDIA7ELY PRIOR 70 7HE
�ELIVERV OF iHE E�IIIPMEM.
3) SIEMENS REpUIRES THE USE OF A �EDICATED H.V.A.G SVSTEM
FOR THE EQUIPMENT ROOM TO BE LOCATE�, SRED AN� SPECIFlED
6Y iHE MECHANICAL ENGWEER OP RECORD AND i0 BE SUPPLIE�
AND INSTALLED BY THE MECHANICAL CONTRACTOR.
4) SIEMENS RECOMMENDS THAT THE CUSTOMER PROVI�E AND INSTALL
AN 0%YGEN MONITORING SVSTEM WITH VISUAL AND AUDIBLE ALARMS
TO INDICATE WHEN THE OXVGEN CONTAWED IN AMBIENT AIR FALLS
BELOW PRE-PROGRAMMED SAFETV LEVELS WITH THE SENSOR TO BE
LOCATED IN THE SCAN ROOM W THE AREA DESIGNATE� FOR
CRVOGEN FlLLING.
5) THE SIEMENS ACTIVE SHIELDED MAGNET RECIRCULATES L1011l�
HELIUM, ELIMINATING THE NEED FOR A �EDICATED CRVOGEN STORAGE
AREA. THE RECIRCUUTING SYSTEM SIGMFlCANTLY REDUCES THE
HELIUM "BOIL OFF". 7HE MAGNEf WILL REQUIRE OCCASIONAL FlLLING,
A �ELNERY ROUiE FOR CRYOGEN �EWARS M115i 6E E4A9LISHE�. A
MINIMl1M 36" CLEARANCE IS REOUIRED.
aEv o
FIRE CONTROL NOTES
1) 9EMEN5 HAS NO SPEQFlC REpUIREMENT FOR FlRE PROTECTION.
FlRE PROTECTION REOUIREMENTS SHALL BE IN ACCORDANCE WITH
LOCAL CO�ES AND CU40MER'S INSURANCE REOUIREMENiS. ALL FlRE
PROTECTION SYSTEMS SHALL 6E DEFINED Bv THE ARCHITECT OF
RECORD WITH DESIGN, SPECIFlCATION AND DETAILING OF THE FIRE
PROTECTION SYSTEM BV THE MECHANICAL ENGMEER OF RECOR� IN
ACCORDANCE WITH SIEMENS GUI�ELWES AS STATED HEREIN. THE
e�ecraoNic eouiarneNt or rHe Ma systen+s wi�� eE onrnnceo er
WATER, REDUCTION OR ELIMINATION OF WATER 115ED FOR FIRE
SUPPRESSION WILL RE�UCE POTENTIAL WATER DAMAGE. PRE-ACTION
MERT GAS, OR HALOCARBONS OR OTHER MEfHODS CAN RE�UCE OR
ELIMINAiE WAiER. REPER i0 YOUR FlRE PROiECiION PROFESSIONAL.
2) THE USE OF SMOKE DETECTORS INSIDE OF THE MR EXAMINATION
ft00M IS NOT RECOMMENDE�. SMOKE �EfECTORS, BY �ESIGN, CAN
GENERAiE N06E iHAi MAV INiERFERE WItH iHE MRI EXAMINAiION
AN� CAUSE IMAGE ARiIFACiS. IF iHE 115E OF A SMOKE �ErECiOR
IN THE EXAMINATION ROOM IS MANDATED BV LOCAL REpUIREMENTS,
SPECIAL NOISE TESTS MUST BE PERPORMED BV 9EMENS SERVICE
AFTER THE MRI IS OPERATIONAL MRI EOUIPMENT PERFORMANCE
PROBLEMS �llE r0 SMOKE �EfECiORS ARE rHE RESPON5161LItY OF
THE CUSTOMER AND ARE NOT COVERED UNDER WARRANN OR
SERVICE AGREEMENT.
3) ALL MAtERIAL USED INSIDE iHE MAGNEf ROOM SHALL BE
NON-MAGNEfIC. SEE CONSTRl1CTI0N REQUIREMENTS.
4) ALL PENEfRATI0N5 IN THE RF CABIN/SHIEL� SHALL BE THROUGH
A WAVE GUIDE TO BE EOUIPPED WITH A DIELECTRIC COUPLER ON
aotH [Nos aF rHE wnvE cuioE. n�� wnvE cuio[s sHn�� eE
DESIGNED, DETAILED AND SPECIFlED BY THE RF CABIN/SHIELD
CONTRACTOR WITH ALL LOCATIONS TO BE DEiERMMED BV THE
ARCHITECT AND MECHANICAL ENGWEER OF RECOR� TO BE
EStABLISHED IN A PRE-PLANNING MEEfING PRIOR t0 iHE �ESIGN,
SPECIFlCAiION, AN� FABRICAiION OF iHE RF CABIN/SHIEL�.
5) EACH ELECTRICAL PENETRATION OF THE RF CABIN/SHIELD FOR
ELECTRICAL SERVICING OF THE FlRE PROTECTION SYSTEM SHALL BE
iHROUGH AN RF FlLiER r0 6E SUPPLIE� BV tHE RF SMELD
CONTRACTOR WITH FlLTER LOCATIONS TO 6E DEfERMINE� BY THE
ARCHRECT AND THE ELECTRICAL ENGWEER OF RECORD TO BE
ESTABLISHE� IN A PRE-PLANNING MEEfING PRIOR TO THE �ESIGN,
SPEQFlCAiION AND FABRICAtION OF iHE RF CABIN/SMELD.
6) IT IS PERMISSIBLE TO Rl1N "BUCK PIPE" UP TO THE DIELECTRIC
COUPLER ON THE OUTSIDE OF THE RF SHIELD.
J) iHERE M115i BE NO GROl1N� WNNEC?IONS MA�E �l1RING iHE
THE INSTALLATION OF EITHER THE PIPING OR ELECTRICAL FOR THE
FlRE PROTECTION SYSTEM.
8) THE USE OF HALON IS NOT ACCEPTABLE.
9) THE LOCATION OF FIRE CONTROL SYSTEM COMPONENTS SHALL BE
COORDINATED THROUGH THE ARCHITECT OF REWRD WITH ALL
LOCATIONS TO BE COOR�INATED WITH SIEMENS EQUIPMENT LOCATIONS
AS SHOWN ON iHE 1/4" SCALE EQUIPMENi LOCAtION PLAN.
10) THE FlRE CONTROL COMRACTOR SHALL VERIfY EpUIPMENT
MOUNTING PROCE�URES AN� LOCATIONS ON ANV WALLS CONTAINING
RF SHIELDING W17H iHE SIEMENS PROJECi MANAGER PRIOR i0 7HE
COMMENCEMENi OF WORK.
REV 1
COMPRESSOR LINE INSULATION
COMPRESSOR LMES Rl1NNING FROM THE COMPRESSOR (OR SEP CABINEf)
i0 iHE MAGNEf ARE INSUL1iE� BV 9EMEN5. ADDRIONAL INSUTAiION
(ARMAFLE% OR EOUIVALENT) FOR NOISE RE�UCTION (CHIRPING) AIAY 6E
REOUIRE�. A��ITIONAL INSULITION NOT PROVI�E� BY SIEMENS.
REV 0
VIDA
REV 8
- G�-i� "�-F Tf Ilu f�=�G-
�� " SIEMENS
�'�. , � _ � r, _
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032
MRI ROM �JB132 - MAGNEfOM VI�A VIOA XQ GRADIENTS
��� F -« : � �� PRo�Ecr #: sHEEr:
-.. . TI � �I . i..� _
��` � � : �� � � '1 90'1 780
nlll=
F i� �TF F i,s.
ALL RIGHTS ARE RESERVED. sNeEr ov oRnwN er: M 101
9 10 D. BRISiOE
SCn�Es NOTED REF. 7-PZZCYK �AiE: 09/O6/19